If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
__TOC__ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
| Well ID: 37-063-36753 | | Well ID: 37-063-36753 | ||
− | | style=" | + | | style="height=100%; align=center" rowspan="14" | {{#display_map: 40.440018, -79.144737 | width=100% | height=100% }} |
|- | |- | ||
| Operator Name: [[KRIEBEL MINERALS INC]] | | Operator Name: [[KRIEBEL MINERALS INC]] |
Well ID: 37-063-36753 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.440018,"lon":-79.144737,"icon":""}]} |
Operator Name: KRIEBEL MINERALS INC | |
First Permit Date: 2010-02-12 | |
Last Permit Date: 2010-02-12 | |
Spud Date: 2010-10-25 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.440018 | |
Longitude: -79.144737 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 1077.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 2032.0 | 333.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 7217.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 185.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | PRODUCED FLUID | 100.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2010-0 | DRILLING FLUID WASTE | 710.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2010-0 | FRACING FLUID WASTE | 110.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2010-0 | FRACING FLUID WASTE | 1430.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2012-0 | PRODUCED FLUID | 185.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | PRODUCED FLUID | 100.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1924177 | 2010-10-28 | No Violations Noted | According to records, well permit granted on 10/14/10 to depth of 5000 ft. Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit aligned with 20 mil plastic and security fence. No freeboard issue. Falcon was contracted. Conductor pipe (13 7/8¿) set at 42 ft (sand). Water detected at 260¿. Stratigraphy consisted of coal, ss and sh. Due to excessive water conditions, Rig 19 going to set water stringer (9 5/8¿) at 336 ft. Surface casing (7) going to be set at 1500 ft. Depth of well was 290 ft. No signs of gas leak from around well and equipment | |
1924840 | 2010-11-03 | No Violations Noted | At the time of this inspection, well actively being drilled. Properly signed with ES plan. All bmp¿s installed and functioning according to plan. No accelerated erosion or sedimentation issues observed with access road or site. Called Mike Cioffi of Kriebel and discussed concerns with pit levels and cuttings, who agreed to have noted concerns addressed immediately. A follow up inspection will be conducted in the near future to observed measures taken to address concerns with pit. | |
1925576 | 2010-11-04 | No Violations Noted | According to records, well permit granted on 10/14/10 to depth of 5000 ft. Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit covered with 20 mil plastic and security fence. No freeboard issue. Falcon was contracted. Stratigraphy consisted of coal, ss and sh. Current depth was 3060 ft. Anticipated depth is 4970 ft. No signs of gas leak from around well and equipment. | |
1925590 | 2010-11-01 | No Violations Noted | According to records, well permit granted on 10/14/10 to depth of 5000 ft. Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit covered with 20 mil plastic and security fence. No freeboard issue. Falcon was contracted. Conductor pipe (13 7/8¿) set at 42 ft (sand). Water detected at 260¿. Stratigraphy consisted of coal, ss and sh. Pipe (9 5/8¿) set 336 ft. with 175 sks class A and 0 bbl returns. Surface casing (7) set at 1565 ft with 270 sks Class A with 13 bbl return. Recement on 6 3/8¿ hole at 75 sks Class A. Basket set at 126 ft on 9 5/8¿ and 7¿at 84 ft. Additional water located at 1520 ft. Current depth was 1980 ft. No signs of gas leak from around well and equipment. | |
1928760 | 2010-11-18 | No Violations Noted | During inspection, well drilled not yet equipped for production. Site properly signed with ES plan available for review. No accelerated erosion or sedimentation issues noted, but observed minor ponding of water along access road (on left when entering well site) Left message with Mike Cioffi (11-18-10 @1230pm) to address the issues, by installing a ditch or adding additional rock to roadway culvert.. Three above grade pits, all of which were lined and sustained adequate freeboard; therefore previous concerns with freeboard and prevention of possible IW discharge appeared to be addressed by operator since last inspection. | |
1950641 | 2011-02-04 | No Violations Noted | At the time of inspection, site Id sign and ES plan present.
Well drilled and equipped for production. Brine tank surrounded by dike appears sound. Site and access road snow covered. Temporary bmp¿s in place. Pits removed site regarded, not yet permanently restored as adequate vegetative cover not yet achieved. No accelerated erosion or sedimentation issues noted with site or access road. |