Difference between revisions of "37-063-36482"

m
m
Line 1: Line 1:
 
__TOC__
 
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-36482
 
| Well ID: 37-063-36482
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.547534, -79.400448 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.547534, -79.400448 | width=100% | height=100% }}  
 
|-
 
|-
 
| Operator Name: [[ACTAGON CORP]]
 
| Operator Name: [[ACTAGON CORP]]

Revision as of 20:14, 28 June 2014

Well Details

Well ID: 37-063-36482
Loading map...
Operator Name: ACTAGON CORP
First Permit Date: 2009-04-09
Last Permit Date: 2009-04-09
Spud Date: 2009-04-24
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.547534
Longitude: -79.400448

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 1034.0 335.0 0.0 0.0 0.0 0.0
2011-0 4214.0 365.0 0.0 0.0 0.0 0.0
2010-0 5310.0 365.0 0.0 0.0 0.0 0.0
2009-0 831.0 30.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2009-0 PRODUCED FLUID 0.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2011-0 PRODUCED FLUID 80.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2013-0 PRODUCED FLUID 60.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1796677 2009-05-06 Pending Site ID sign in place. E&S plan on site. Site has been created, well has not been drilled.

Silt fence installed along down-slope side of site adequately maintained. Site is stabilized with rock. No signs of accelerated erosion on site. Access road ok. Pit has been excavated. Plastic liner not yet installed.

  • There are concerns that this site requires an ESCGP-1 permit due to greater than five acres of disturbance included in this well site, access
   roads, other connected wells included in this project, etc..  Follow-up inspections will be conducted to determine the amount of total 
   disturbance, and to determine if the sites are in violation.  Culvert installed on access road requires rip-rap at the outlet to minimize erosion.  Please address this concern and contact this office upon completion.
1798074 2009-05-14 No Violations Noted Inspection conducted with Oil & Gas Inspectors Rick Hoover and Steve Lencer.

Site ID sign in place. E&S plan on site. Site has been created, well not yet drilled. Unlined pit has been excavated. Silt fence installed along down-slope side of site adequately maintained. Site is stabilized with rock. No signs of accelerated erosion on site. Access road ok.

  • Concerns regarding an ESCGP-1 permit required for this project have been addressed through the Auen # 1 (063-36487) inspection
   report/NOV.
  • Culvert installed on access road requires rip-rap at the outlet to minimize erosion. Please address this concern and contact this office upon
   completion.
1820590 2009-08-14 No Violations Noted Well is equipped for production. Well tag in place. Tank sound.

Access road is stabilized with rock. No signs of accelerated erosion on access road. Rock installed at culvert outlets. Site is stabilized with adequate vegetation. No signs of accelerated erosion on site. Associated pipelines and other earth disturbance is restored and stabilized with adequate vegetation. Final stabilization achieved. Site restored. Violation for failure to obtain an ESCGP-1 permit for this project which was addressed through the Auen # 1 (063-36487) inspection

   report/NOV dated 5/18/09 is in compliance with the above mentioned restoration and the submission of the ESCGP-1 permit application.  With this well site being restore and final stabilization complete, the silt fence that was installed on the down-slope side of the site must be removed.  Spoke to operator representative about this concern.  Please contact this office upon completion.

References