If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
(Created page with "== Well Details == {{003-22235-Details}} __TOC__ == Well Inspection Data == {{003-22235-inspection}} == Production Data == {{003-22235-production}} == Waste Data == {{003-2223...") |
|||
Line 1: | Line 1: | ||
== Well Details == | == Well Details == | ||
− | { | + | {| class="wikitable" width="95%" |
+ | | Well ID: 003-22235 | ||
+ | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.243463, -79.904508 | width=100% | height=100% }} | ||
+ | |- | ||
+ | | County: [[Allegheny County, Pennsylvania|Allegheny]] | ||
+ | |- | ||
+ | | Municipality: [[Forward Township, Allegheny County, Pennsylvania|Forward Township]] | ||
+ | |- | ||
+ | | Operator Name: [[EQT PRODUCTION CO]] | ||
+ | |- | ||
+ | | Farm/Lease Name: OLIVER EAST 590599 | ||
+ | |- | ||
+ | | First Permit Date: 2012-11-16 | ||
+ | |- | ||
+ | | Last Permit Date: 2012-11-16 | ||
+ | |- | ||
+ | | Spud Date: 2013-02-05 | ||
+ | |- | ||
+ | | Unconventional: Yes | ||
+ | |- | ||
+ | | Horizontal: Yes | ||
+ | |- | ||
+ | | Producing: Yes | ||
+ | |- | ||
+ | | Violations: None | ||
+ | |- | ||
+ | | Latitude: 40.243463 | ||
+ | |- | ||
+ | | Longitude: -79.904508 | ||
+ | |- | ||
+ | |} | ||
__TOC__ | __TOC__ | ||
== Well Inspection Data == | == Well Inspection Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | INSPECTION ID | ||
+ | !scope="col" | DATE | ||
+ | !scope="col" | DESCRIPTION | ||
+ | !scope="col" | COMMENT | ||
+ | !scope="col" | VIOLATION ID | ||
+ | |- | ||
+ | | 2130261 | ||
+ | | 2013-01-14 | ||
+ | | No Violations Noted | ||
+ | | John Ley, Water Quality Specialist, SWRO was on site to conduct a pre-op inspection. The site sign was in place and showed the proper permitting information. The E&S controls and BMP's were in place and constructed according to plan. The pad was still under construction with ~ 75 % complete. The access road berms, soil stock pile and ~50% of the hillsides had been stabilized. There were no signs of excess erosion or sedimentation. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2134521 | ||
+ | | 2013-01-23 | ||
+ | | No Violations Noted | ||
+ | | THE WELL IS SPUDDED AND THE CONDUCTOR IS IN. THE WELL IS COVERD. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2138963 | ||
+ | | 2013-02-11 | ||
+ | | No Violations Noted | ||
+ | | John Ley, Water Quality Specialist, SWRO was on site to conduct a routine inspection. The site sign was in place and showed the proper permitting information. The E&S controls and BMP's were in place and constructed according to plan. The pad was completed. The access road berms, soil stock pile had been stabilized. There were no signs of excess erosion or sedimentation. The water impoundment was being constructed. This area will need to be stabilized once construction is completed. The well has 20” and 13 3/8’” casing set and cemented. | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
== Production Data == | == Production Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | GAS QUANTITY | ||
+ | !scope="col" | GAS PRODUCTION DAYS | ||
+ | !scope="col" | CONDENSATE QUANTITY | ||
+ | !scope="col" | CONDENSATE PRODUCTION DAYS | ||
+ | !scope="col" | OIL QUANTITY | ||
+ | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |} | ||
== Waste Data == | == Waste Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | TYPE | ||
+ | !scope="col" | QUANTITY | ||
+ | !scope="col" | UNITS | ||
+ | !scope="col" | DISPOSAL METHOD | ||
+ | !scope="col" | WASTE FACILITY PERMIT ID | ||
+ | !scope="col" | WASTE FACILITY NAME | ||
+ | !scope="col" | FACILITY CITY | ||
+ | !scope="col" | FACILITY STATE | ||
+ | |} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ |
Well ID: 003-22235 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.243463,"lon":-79.904508,"icon":""}]} |
County: Allegheny | |
Municipality: Forward Township | |
Operator Name: EQT PRODUCTION CO | |
Farm/Lease Name: OLIVER EAST 590599 | |
First Permit Date: 2012-11-16 | |
Last Permit Date: 2012-11-16 | |
Spud Date: 2013-02-05 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 40.243463 | |
Longitude: -79.904508 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2130261 | 2013-01-14 | No Violations Noted | John Ley, Water Quality Specialist, SWRO was on site to conduct a pre-op inspection. The site sign was in place and showed the proper permitting information. The E&S controls and BMP's were in place and constructed according to plan. The pad was still under construction with ~ 75 % complete. The access road berms, soil stock pile and ~50% of the hillsides had been stabilized. There were no signs of excess erosion or sedimentation. | |
2134521 | 2013-01-23 | No Violations Noted | THE WELL IS SPUDDED AND THE CONDUCTOR IS IN. THE WELL IS COVERD. | |
2138963 | 2013-02-11 | No Violations Noted | John Ley, Water Quality Specialist, SWRO was on site to conduct a routine inspection. The site sign was in place and showed the proper permitting information. The E&S controls and BMP's were in place and constructed according to plan. The pad was completed. The access road berms, soil stock pile had been stabilized. There were no signs of excess erosion or sedimentation. The water impoundment was being constructed. This area will need to be stabilized once construction is completed. The well has 20” and 13 3/8’” casing set and cemented. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|