If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
(Created page with "== Well Details == {{007-20307-Details}} __TOC__ == Well Inspection Data == {{007-20307-inspection}} == Production Data == {{007-20307-production}} == Waste Data == {{007-2030...") |
|||
Line 1: | Line 1: | ||
== Well Details == | == Well Details == | ||
− | { | + | {| class="wikitable" width="95%" |
+ | | Well ID: 007-20307 | ||
+ | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.747527, -80.4115 | width=100% | height=100% }} | ||
+ | |- | ||
+ | | County: [[Beaver County, Pennsylvania|Beaver]] | ||
+ | |- | ||
+ | | Municipality: [[South Beaver Township, Beaver County, Pennsylvania|South Beaver Township]] | ||
+ | |- | ||
+ | | Operator Name: [[CHESAPEAKE APPALACHIA LLC]] | ||
+ | |- | ||
+ | | Farm/Lease Name: ROLLING ACRES 8H | ||
+ | |- | ||
+ | | First Permit Date: 2011-06-03 | ||
+ | |- | ||
+ | | Last Permit Date: 2011-06-03 | ||
+ | |- | ||
+ | | Spud Date: 2011-08-16 | ||
+ | |- | ||
+ | | Unconventional: No | ||
+ | |- | ||
+ | | Horizontal: No | ||
+ | |- | ||
+ | | Producing: Yes | ||
+ | |- | ||
+ | | Violations: None | ||
+ | |- | ||
+ | | Latitude: 40.747527 | ||
+ | |- | ||
+ | | Longitude: -80.4115 | ||
+ | |- | ||
+ | |} | ||
__TOC__ | __TOC__ | ||
== Well Inspection Data == | == Well Inspection Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | INSPECTION ID | ||
+ | !scope="col" | DATE | ||
+ | !scope="col" | DESCRIPTION | ||
+ | !scope="col" | COMMENT | ||
+ | !scope="col" | VIOLATION ID | ||
+ | |- | ||
+ | | 1991743 | ||
+ | | 2011-07-12 | ||
+ | | No Violations Noted | ||
+ | | 100' OF CONDUCTOR IS CEMENTED. TOP OF 20" IS COVERD BY A STEEL PLATE. | ||
+ | SITE, E&S, AND ACCESS, IS OK. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1992139 | ||
+ | | 2011-07-12 | ||
+ | | No Violations Noted | ||
+ | | On July 12th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. Pad construction was complete. The access road was in good condition. Site ID was posted. E&S controls were in place according to the ESCGP-1. Some growth was coming in on the slopes. No spills/ leaks or accelerated erosion were observed at the time of inspection. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1998389 | ||
+ | | 2011-08-03 | ||
+ | | No Violations Noted | ||
+ | | CONDUCTOR IS IN AND CEMENTED. A SOUND WALL HAS BEEN BUILT AROUND PART OF THE SITE. | ||
+ | SITE, E&S, AND ACCESS, OK. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2001716 | ||
+ | | 2011-08-18 | ||
+ | | No Violations Noted | ||
+ | | 13 3/8" CASING CEMENTED TO SURFACE. | ||
+ | BOP TEST DONE 8/18/11. | ||
+ | E&S OK. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2003196 | ||
+ | | 2011-09-13 | ||
+ | | No Violations Noted | ||
+ | | DRILLING AT 7164'. UTICA WELL. SITE OK. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2016807 | ||
+ | | 2011-10-25 | ||
+ | | No Violations Noted | ||
+ | | DRILLING COMPLETE. RIG IS GONE. WELL HEAD EQUIPTMENT IS BEING INSTALLED. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2018471 | ||
+ | | 2011-10-06 | ||
+ | | No Violations Noted | ||
+ | | DRILLING HORIZONTAL LEG @ 1346' WITH 8.5" BIT. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2018475 | ||
+ | | 2011-10-18 | ||
+ | | No Violations Noted | ||
+ | | DRILLING COMPLETE. RIG IS BEING DISMANTLED. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2018691 | ||
+ | | 2011-11-02 | ||
+ | | No Violations Noted | ||
+ | | RUNNING TUBING. FIRST ZONE WILL THEN BE FRACED. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2027608 | ||
+ | | 2011-11-29 | ||
+ | | No Violations Noted | ||
+ | | WELL HAS BEEN FRACED. SERVICE RIG CLEANING OUT THE WELL. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2027615 | ||
+ | | 2011-11-22 | ||
+ | | No Violations Noted | ||
+ | | DRILLING COMPLETE AND WELL IS FRACED. FRAC EQUIPTMENT MOVING. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1991743 | ||
+ | | 2011-07-12 | ||
+ | | No Violations Noted | ||
+ | | 100' OF CONDUCTOR IS CEMENTED. TOP OF 20" IS COVERD BY A STEEL PLATE. | ||
+ | SITE, E&S, AND ACCESS, IS OK. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1992139 | ||
+ | | 2011-07-12 | ||
+ | | No Violations Noted | ||
+ | | On July 12th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. Pad construction was complete. The access road was in good condition. Site ID was posted. E&S controls were in place according to the ESCGP-1. Some growth was coming in on the slopes. No spills/ leaks or accelerated erosion were observed at the time of inspection. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1998389 | ||
+ | | 2011-08-03 | ||
+ | | No Violations Noted | ||
+ | | CONDUCTOR IS IN AND CEMENTED. A SOUND WALL HAS BEEN BUILT AROUND PART OF THE SITE. | ||
+ | SITE, E&S, AND ACCESS, OK. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2001716 | ||
+ | | 2011-08-18 | ||
+ | | No Violations Noted | ||
+ | | 13 3/8" CASING CEMENTED TO SURFACE. | ||
+ | BOP TEST DONE 8/18/11. | ||
+ | E&S OK. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2003196 | ||
+ | | 2011-09-13 | ||
+ | | No Violations Noted | ||
+ | | DRILLING AT 7164'. UTICA WELL. SITE OK. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2016807 | ||
+ | | 2011-10-25 | ||
+ | | No Violations Noted | ||
+ | | DRILLING COMPLETE. RIG IS GONE. WELL HEAD EQUIPTMENT IS BEING INSTALLED. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2018471 | ||
+ | | 2011-10-06 | ||
+ | | No Violations Noted | ||
+ | | DRILLING HORIZONTAL LEG @ 1346' WITH 8.5" BIT. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2018475 | ||
+ | | 2011-10-18 | ||
+ | | No Violations Noted | ||
+ | | DRILLING COMPLETE. RIG IS BEING DISMANTLED. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2018691 | ||
+ | | 2011-11-02 | ||
+ | | No Violations Noted | ||
+ | | RUNNING TUBING. FIRST ZONE WILL THEN BE FRACED. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2027608 | ||
+ | | 2011-11-29 | ||
+ | | No Violations Noted | ||
+ | | WELL HAS BEEN FRACED. SERVICE RIG CLEANING OUT THE WELL. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2027615 | ||
+ | | 2011-11-22 | ||
+ | | No Violations Noted | ||
+ | | DRILLING COMPLETE AND WELL IS FRACED. FRAC EQUIPTMENT MOVING. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2052645 | ||
+ | | 2012-03-08 | ||
+ | | No Violations Noted | ||
+ | | THIS WELL IS COMPLETE. PRODUCTION EQUIPTMENT IS BEING INSTALLED. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2116529 | ||
+ | | 2012-10-16 | ||
+ | | No Violations Noted | ||
+ | | WELL COMPLETE. TANKS AND EQUIPTMENT SET. | ||
+ | ACCESS AND PAD ARE GATED AND LOCKED. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2052645 | ||
+ | | 2012-03-08 | ||
+ | | No Violations Noted | ||
+ | | THIS WELL IS COMPLETE. PRODUCTION EQUIPTMENT IS BEING INSTALLED. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2116529 | ||
+ | | 2012-10-16 | ||
+ | | No Violations Noted | ||
+ | | WELL COMPLETE. TANKS AND EQUIPTMENT SET. | ||
+ | ACCESS AND PAD ARE GATED AND LOCKED. | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
== Production Data == | == Production Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | GAS QUANTITY | ||
+ | !scope="col" | GAS PRODUCTION DAYS | ||
+ | !scope="col" | CONDENSATE QUANTITY | ||
+ | !scope="col" | CONDENSATE PRODUCTION DAYS | ||
+ | !scope="col" | OIL QUANTITY | ||
+ | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
== Waste Data == | == Waste Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | TYPE | ||
+ | !scope="col" | QUANTITY | ||
+ | !scope="col" | UNITS | ||
+ | !scope="col" | DISPOSAL METHOD | ||
+ | !scope="col" | WASTE FACILITY PERMIT ID | ||
+ | !scope="col" | WASTE FACILITY NAME | ||
+ | !scope="col" | FACILITY CITY | ||
+ | !scope="col" | FACILITY STATE | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 300.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR HYDRAULIC FRACTURING | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 255.0 | ||
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-21076 | ||
+ | | MYERS #1 UNIT (SALTY'S DISPOSAL) | ||
+ | | ATWATER | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 110.0 | ||
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 968 1 | ||
+ | | R.O.J.#1-A (HUFFMAN-BOWERS, INC.) | ||
+ | | CHESIRE | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 690.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR HYDRAULIC FRACTURING | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ |
Well ID: 007-20307 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.747527,"lon":-80.4115,"icon":""}]} |
County: Beaver | |
Municipality: South Beaver Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Farm/Lease Name: ROLLING ACRES 8H | |
First Permit Date: 2011-06-03 | |
Last Permit Date: 2011-06-03 | |
Spud Date: 2011-08-16 | |
Unconventional: No | |
Horizontal: No | |
Producing: Yes | |
Violations: None | |
Latitude: 40.747527 | |
Longitude: -80.4115 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1991743 | 2011-07-12 | No Violations Noted | 100' OF CONDUCTOR IS CEMENTED. TOP OF 20" IS COVERD BY A STEEL PLATE.
SITE, E&S, AND ACCESS, IS OK. |
|
1992139 | 2011-07-12 | No Violations Noted | On July 12th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. Pad construction was complete. The access road was in good condition. Site ID was posted. E&S controls were in place according to the ESCGP-1. Some growth was coming in on the slopes. No spills/ leaks or accelerated erosion were observed at the time of inspection. | |
1998389 | 2011-08-03 | No Violations Noted | CONDUCTOR IS IN AND CEMENTED. A SOUND WALL HAS BEEN BUILT AROUND PART OF THE SITE.
SITE, E&S, AND ACCESS, OK. |
|
2001716 | 2011-08-18 | No Violations Noted | 13 3/8" CASING CEMENTED TO SURFACE.
BOP TEST DONE 8/18/11. E&S OK. |
|
2003196 | 2011-09-13 | No Violations Noted | DRILLING AT 7164'. UTICA WELL. SITE OK. | |
2016807 | 2011-10-25 | No Violations Noted | DRILLING COMPLETE. RIG IS GONE. WELL HEAD EQUIPTMENT IS BEING INSTALLED. | |
2018471 | 2011-10-06 | No Violations Noted | DRILLING HORIZONTAL LEG @ 1346' WITH 8.5" BIT. | |
2018475 | 2011-10-18 | No Violations Noted | DRILLING COMPLETE. RIG IS BEING DISMANTLED. | |
2018691 | 2011-11-02 | No Violations Noted | RUNNING TUBING. FIRST ZONE WILL THEN BE FRACED. | |
2027608 | 2011-11-29 | No Violations Noted | WELL HAS BEEN FRACED. SERVICE RIG CLEANING OUT THE WELL. | |
2027615 | 2011-11-22 | No Violations Noted | DRILLING COMPLETE AND WELL IS FRACED. FRAC EQUIPTMENT MOVING. | |
1991743 | 2011-07-12 | No Violations Noted | 100' OF CONDUCTOR IS CEMENTED. TOP OF 20" IS COVERD BY A STEEL PLATE.
SITE, E&S, AND ACCESS, IS OK. |
|
1992139 | 2011-07-12 | No Violations Noted | On July 12th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. Pad construction was complete. The access road was in good condition. Site ID was posted. E&S controls were in place according to the ESCGP-1. Some growth was coming in on the slopes. No spills/ leaks or accelerated erosion were observed at the time of inspection. | |
1998389 | 2011-08-03 | No Violations Noted | CONDUCTOR IS IN AND CEMENTED. A SOUND WALL HAS BEEN BUILT AROUND PART OF THE SITE.
SITE, E&S, AND ACCESS, OK. |
|
2001716 | 2011-08-18 | No Violations Noted | 13 3/8" CASING CEMENTED TO SURFACE.
BOP TEST DONE 8/18/11. E&S OK. |
|
2003196 | 2011-09-13 | No Violations Noted | DRILLING AT 7164'. UTICA WELL. SITE OK. | |
2016807 | 2011-10-25 | No Violations Noted | DRILLING COMPLETE. RIG IS GONE. WELL HEAD EQUIPTMENT IS BEING INSTALLED. | |
2018471 | 2011-10-06 | No Violations Noted | DRILLING HORIZONTAL LEG @ 1346' WITH 8.5" BIT. | |
2018475 | 2011-10-18 | No Violations Noted | DRILLING COMPLETE. RIG IS BEING DISMANTLED. | |
2018691 | 2011-11-02 | No Violations Noted | RUNNING TUBING. FIRST ZONE WILL THEN BE FRACED. | |
2027608 | 2011-11-29 | No Violations Noted | WELL HAS BEEN FRACED. SERVICE RIG CLEANING OUT THE WELL. | |
2027615 | 2011-11-22 | No Violations Noted | DRILLING COMPLETE AND WELL IS FRACED. FRAC EQUIPTMENT MOVING. | |
2052645 | 2012-03-08 | No Violations Noted | THIS WELL IS COMPLETE. PRODUCTION EQUIPTMENT IS BEING INSTALLED. | |
2116529 | 2012-10-16 | No Violations Noted | WELL COMPLETE. TANKS AND EQUIPTMENT SET.
ACCESS AND PAD ARE GATED AND LOCKED. |
|
2052645 | 2012-03-08 | No Violations Noted | THIS WELL IS COMPLETE. PRODUCTION EQUIPTMENT IS BEING INSTALLED. | |
2116529 | 2012-10-16 | No Violations Noted | WELL COMPLETE. TANKS AND EQUIPTMENT SET.
ACCESS AND PAD ARE GATED AND LOCKED. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 300.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-1 | PRODUCED FLUID | 255.0 | Bbl | INJECTION DISPOSAL WELL | 34-133-21076 | MYERS #1 UNIT (SALTY'S DISPOSAL) | ATWATER | OH |
2012-1 | PRODUCED FLUID | 110.0 | Bbl | INJECTION DISPOSAL WELL | 968 1 | R.O.J.#1-A (HUFFMAN-BOWERS, INC.) | CHESIRE | OH |
2012-1 | PRODUCED FLUID | 690.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING |