If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
(Created page with "== Well Details == {{115-20782-Details}} __TOC__ == Well Inspection Data == {{115-20782-inspection}} == Production Data == {{115-20782-production}} == Waste Data == {{115-2078...") |
|||
Line 1: | Line 1: | ||
== Well Details == | == Well Details == | ||
− | { | + | {| class="wikitable" width="95%" |
+ | | Well ID: 115-20782 | ||
+ | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.877986, -75.659719 | width=100% | height=100% }} | ||
+ | |- | ||
+ | | County: [[Susquehanna County, Pennsylvania|Susquehanna]] | ||
+ | |- | ||
+ | | Municipality: [[New Milford Township, Susquehanna County, Pennsylvania|New Milford Township]] | ||
+ | |- | ||
+ | | Operator Name: [[SOUTHWESTERN ENERGY PROD CO]] | ||
+ | |- | ||
+ | | Farm/Lease Name: SKELLY 3H | ||
+ | |- | ||
+ | | First Permit Date: 2011-12-13 | ||
+ | |- | ||
+ | | Last Permit Date: 2011-12-13 | ||
+ | |- | ||
+ | | Spud Date: 2012-02-20 | ||
+ | |- | ||
+ | | Unconventional: Yes | ||
+ | |- | ||
+ | | Horizontal: Yes | ||
+ | |- | ||
+ | | Producing: Yes | ||
+ | |- | ||
+ | | Violations: None | ||
+ | |- | ||
+ | | Latitude: 41.877986 | ||
+ | |- | ||
+ | | Longitude: -75.659719 | ||
+ | |- | ||
+ | |} | ||
__TOC__ | __TOC__ | ||
== Well Inspection Data == | == Well Inspection Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | INSPECTION ID | ||
+ | !scope="col" | DATE | ||
+ | !scope="col" | DESCRIPTION | ||
+ | !scope="col" | COMMENT | ||
+ | !scope="col" | VIOLATION ID | ||
+ | |- | ||
+ | | 2051259 | ||
+ | | 2012-03-13 | ||
+ | | Pending | ||
+ | | Falcon 17. Drilling ahead. When drilling out 9 5/8" started seeing bubbling on backside of casing. Shoe test and FIT good. DEP notified on 3/12/12. Operator will be installing packoff assembly at surface and will vent gas. Used Halliburton thixotropic cement blend. Indications are that too much retardant was mixed with blend which caused set time to be delayed. Lab results for compressive strenght have not been received yet. Inspection of cellar revealed steady stream of small bubbles on 13 x 9 annulus. 13 3/8" is cemented to surface. No bubbling observed on 20 x 13 3/8" annulus. Request operator to provide laboratory data on cement when received. Operator shall notify DEP when packoff assembly is installed and to continue monitoring cellar for gas. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2051366 | ||
+ | | 2012-03-16 | ||
+ | | Pending | ||
+ | | Follow up on cement job on 9 5/8". Bubbling is present on 9 5/8" annulus. Have pack off assembly ordered. Co. Man indicated that cement contractor admittedly used too much retardant during job which aggected set up time. Driller waited on cement at least 24 hrs before drilling out. Cement lab results reprtedly indicated 500 psi compressive strength @ 24 hrs. Swell pacer was installed 50' above 13 3/8" shoe, and a swell packer @ 75' below 13 3/8" shoe. 13 3/8" set at 688' and 9 5/8" set at 1669'. DEP will continue to follow up. Rig has moved off location. Crews on site cleaning up containment. | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
== Production Data == | == Production Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | GAS QUANTITY | ||
+ | !scope="col" | GAS PRODUCTION DAYS | ||
+ | !scope="col" | CONDENSATE QUANTITY | ||
+ | !scope="col" | CONDENSATE PRODUCTION DAYS | ||
+ | !scope="col" | OIL QUANTITY | ||
+ | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
== Waste Data == | == Waste Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | TYPE | ||
+ | !scope="col" | QUANTITY | ||
+ | !scope="col" | UNITS | ||
+ | !scope="col" | DISPOSAL METHOD | ||
+ | !scope="col" | WASTE FACILITY PERMIT ID | ||
+ | !scope="col" | WASTE FACILITY NAME | ||
+ | !scope="col" | FACILITY CITY | ||
+ | !scope="col" | FACILITY STATE | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | DRILLING FLUID WASTE | ||
+ | | style="text-align:right;" | 103.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR119 | ||
+ | | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | ||
+ | | WILLIAMSPORT | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | DRILL CUTTINGS | ||
+ | | style="text-align:right;" | 660.0 | ||
+ | | Tons | ||
+ | | LANDFILL | ||
+ | | NY STATE #32S11 | ||
+ | | ALLIED WASTE SYSTEMS | ||
+ | | NIAGARA FALLS | ||
+ | | NY | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | DRILL CUTTINGS | ||
+ | | style="text-align:right;" | 117.64 | ||
+ | | Tons | ||
+ | | LANDFILL | ||
+ | | 101247 | ||
+ | | KEYSTONE SANITARY LANDFILL | ||
+ | | DUNMORE | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | DRILL CUTTINGS | ||
+ | | style="text-align:right;" | 381.06 | ||
+ | | Tons | ||
+ | | LANDFILL | ||
+ | | THR029 | ||
+ | | TUNNELL HILL RECLAMATION LANDFILL | ||
+ | | NEWLEXINGTON | ||
+ | | OH | ||
+ | |- | ||
+ | |} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ |
Well ID: 115-20782 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.877986,"lon":-75.659719,"icon":""}]} |
County: Susquehanna | |
Municipality: New Milford Township | |
Operator Name: SOUTHWESTERN ENERGY PROD CO | |
Farm/Lease Name: SKELLY 3H | |
First Permit Date: 2011-12-13 | |
Last Permit Date: 2011-12-13 | |
Spud Date: 2012-02-20 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 41.877986 | |
Longitude: -75.659719 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2051259 | 2012-03-13 | Pending | Falcon 17. Drilling ahead. When drilling out 9 5/8" started seeing bubbling on backside of casing. Shoe test and FIT good. DEP notified on 3/12/12. Operator will be installing packoff assembly at surface and will vent gas. Used Halliburton thixotropic cement blend. Indications are that too much retardant was mixed with blend which caused set time to be delayed. Lab results for compressive strenght have not been received yet. Inspection of cellar revealed steady stream of small bubbles on 13 x 9 annulus. 13 3/8" is cemented to surface. No bubbling observed on 20 x 13 3/8" annulus. Request operator to provide laboratory data on cement when received. Operator shall notify DEP when packoff assembly is installed and to continue monitoring cellar for gas. | |
2051366 | 2012-03-16 | Pending | Follow up on cement job on 9 5/8". Bubbling is present on 9 5/8" annulus. Have pack off assembly ordered. Co. Man indicated that cement contractor admittedly used too much retardant during job which aggected set up time. Driller waited on cement at least 24 hrs before drilling out. Cement lab results reprtedly indicated 500 psi compressive strength @ 24 hrs. Swell pacer was installed 50' above 13 3/8" shoe, and a swell packer @ 75' below 13 3/8" shoe. 13 3/8" set at 688' and 9 5/8" set at 1669'. DEP will continue to follow up. Rig has moved off location. Crews on site cleaning up containment. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | DRILLING FLUID WASTE | 103.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2012-1 | DRILL CUTTINGS | 660.0 | Tons | LANDFILL | NY STATE #32S11 | ALLIED WASTE SYSTEMS | NIAGARA FALLS | NY |
2012-1 | DRILL CUTTINGS | 117.64 | Tons | LANDFILL | 101247 | KEYSTONE SANITARY LANDFILL | DUNMORE | PA |
2012-1 | DRILL CUTTINGS | 381.06 | Tons | LANDFILL | THR029 | TUNNELL HILL RECLAMATION LANDFILL | NEWLEXINGTON | OH |