X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-007-20372"

Line 4: Line 4:
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.735963, -80.443505 | width=100% | height=100% }}  
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.735963, -80.443505 | width=100% | height=100% }}  
 
|-
 
|-
| County: [[Beaver County, Pennsylvania|Beaver]]
+
| County: [[wikipedia:Beaver County, Pennsylvania|Beaver]]
 
|-
 
|-
| Municipality: [[South Beaver Township, Beaver County, Pennsylvania|South Beaver Township]]
+
| Municipality: [[wikipedia:South Beaver Township, Beaver County, Pennsylvania|South Beaver Township]]
 
|-
 
|-
| Operator Name: [[CHESAPEAKE APPALACHIA LLC]]
+
| Operator Name: [[wikipedia:CHESAPEAKE APPALACHIA LLC|CHESAPEAKE APPALACHIA LLC]]
 
|-
 
|-
 
| First Permit Date: 2012-12-05
 
| First Permit Date: 2012-12-05

Revision as of 19:18, 2 May 2014

Well Details

Well ID: 007-20372
Loading map...
County: Beaver
Municipality: South Beaver Township
Operator Name: CHESAPEAKE APPALACHIA LLC
First Permit Date: 2012-12-05
Last Permit Date: 2012-12-05
Spud Date: None
Unconventional: Yes
Horizontal: Yes
Violations: None
Latitude: 40.735963
Longitude: -80.443505

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2138927 2013-02-13 No Violations Noted John Ley Water Quality Specialist SWRO was on site to conduct a pre-operational inspection. The site sign was in place and properly displayed the permits. The site E&S controls and BMP's were well constructed and in good shape. The access road was constructed according to plan and E&S controls had been added to the road. Some rock spreading was still needed to be completed on the access road. The site was yet to be temporarily stabilized as some earth moving was still being conducted. Notification was received for the well to be spudded on 2-14-13.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE