If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Line 4: | Line 4: | ||
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 39.740338, -80.494877 | width=100% | height=100% }} | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 39.740338, -80.494877 | width=100% | height=100% }} | ||
|- | |- | ||
− | | County: [[Greene County, Pennsylvania|Greene]] | + | | County: [[wikipedia:Greene County, Pennsylvania|Greene]] |
|- | |- | ||
− | | Municipality: [[Springhill Township, Greene County, Pennsylvania|Springhill Township]] | + | | Municipality: [[wikipedia:Springhill Township, Greene County, Pennsylvania|Springhill Township]] |
|- | |- | ||
− | | Operator Name: [[CHESAPEAKE APPALACHIA LLC]] | + | | Operator Name: [[wikipedia:CHESAPEAKE APPALACHIA LLC|CHESAPEAKE APPALACHIA LLC]] |
|- | |- | ||
| Farm/Lease Name: MICHAEL MCNICHOLAS GRE 8H | | Farm/Lease Name: MICHAEL MCNICHOLAS GRE 8H |
Well ID: 059-26067 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
County: Greene | |
Municipality: Springhill Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Farm/Lease Name: MICHAEL MCNICHOLAS GRE 8H | |
First Permit Date: 2012-10-25 | |
Last Permit Date: 2012-10-25 | |
Spud Date: 2012-12-20 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 39.740338 | |
Longitude: -80.494877 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2127468 | 2012-12-19 | No Violations Noted | Pre-operation inspection of BMPs. I found no problems. | |
2132176 | 2012-01-11 | No Violations Noted | NOMAC RIG 337 DRILLING FOR CHESAPEAKE ENERGY.WERE DRILLING AT 2751' ON 12 1/4 SECTION. SITE COMPLIANT AT TIME OF INSPECTION. | |
2137424 | 2013-01-31 | No Violations Noted | On January 31, 2013, I stopped at Chesapeake’s Michael McNicholas site to check the site.
Chesapeake put silt fence around the topsoil pile by the township road. The silt pond was mostly full, the company has been maintaining it but it has been difficult with the winter weather. Chesapeake replaced the silt sox damaged by the bulldozer and left the silt fence downslope as additonal safe guards. Trying to stabilize the slopes has been very difficult because of the weather. Chevron must edit the E&S Plan to reflect he additions I mentioned above. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|