If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Line 4: | Line 4: | ||
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.562583, -79.700916 | width=100% | height=100% }} | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.562583, -79.700916 | width=100% | height=100% }} | ||
|- | |- | ||
− | | County: [[Westmoreland County, Pennsylvania|Westmoreland]] | + | | County: [[wikipedia:Westmoreland County, Pennsylvania|Westmoreland]] |
|- | |- | ||
− | | Municipality: [[Lower Burrell City, Westmoreland County, Pennsylvania|Lower Burrell City]] | + | | Municipality: [[wikipedia:Lower Burrell City, Westmoreland County, Pennsylvania|Lower Burrell City]] |
|- | |- | ||
− | | Operator Name: [[PENNECO OIL CO INC]] | + | | Operator Name: [[wikipedia:PENNECO OIL CO INC|PENNECO OIL CO INC]] |
|- | |- | ||
| First Permit Date: 2010-12-23 | | First Permit Date: 2010-12-23 |
Well ID: 129-28494 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.562583,"lon":-79.700916,"icon":""}]} |
County: Westmoreland | |
Municipality: Lower Burrell City | |
Operator Name: PENNECO OIL CO INC | |
First Permit Date: 2010-12-23 | |
Last Permit Date: 2010-12-23 | |
Spud Date: 2011-03-01 | |
Unconventional: No | |
Horizontal: Yes | |
Violations: None | |
Latitude: 40.562583 | |
Longitude: -79.700916 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1948428 | 2011-02-08 | No Violations Noted | Drilling 11" hole at 1320' at time of inspection. Information per drillers log and cement tickets: Cemented 509' of 11 3/4" casing in 15" hole with 260 sacks of "A" containing 3% CACL2 & 1/4# flake & .2% foam chek (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 01:00 02-06-11.
Drilling pit lined and freeboard maintained. No E/S control issues on site. |
|
1948439 | 2011-02-04 | No Violations Noted | At time of inspection, Union Drilling rig 55 waiting on Universal Well Services to cement 212' of 16" casing in 20" hole. 32' of 24" conductor previously set and sanded in.
Drilling pit lined and freeboard maintained. No E/S control issues on site. Met with Operator rep Bob Carnahan and Drilling rep Brad Riley. WQS's J. Shultz and G. Higgins at site at time of inspection. |
|
1948451 | 2011-02-04 | No Violations Noted | Universal Well Services cemented 212' of 16" casing in 20" hole with 170 sacks of "A" containing 3% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface not realized with plug landing at 15:30 02-04-11. Estimated that cement 10'-15' from surface. Will grout backside when cementing 11 3/4" casing.
Drilling pit lined and freeboard maintained. No E/S control issues on site. |
|
1949124 | 2011-02-10 | No Violations Noted | Rig broke down - Swivel O-Rings - at 1955' at time of inspection.
Drilling pit lined and freeboard maintained. No E/S control issues on site. Inspection conducted w/OGI J. Branan. |
|
1949910 | 2011-02-04 | No Violations Noted | Rig is on-site. Drilling in progress. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no signs of erosion or sedimentation. | |
1949926 | 2011-02-11 | No Violations Noted | Rig is on-site. Drilling in progress, currently at ~2050 feet. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no signs of erosion or sedimentation.
Note- Some cuttings have blown out of the pit onto the pad. The cuttings will be placed in the pit. The operator has utilized a flange to prevent this from happening again. |
|
1953014 | 2011-02-16 | No Violations Noted | Waiting on kick-off cement plug at time of inspection.
Per 02-14-11 phone message from Operator rep Marc Jacobs; 8 5/8" cement not returned to surface. Per 02-16-11 phone call with Operator rep Juan Kopp; 2377' of 8 5/8" previously set and cemented. Cement not returned to surface. Drilled 6 1/4" hole to approximately 3150' prior to plugging back to approximately 2400' for proposed kick-off point of 2440'. Cement bond log to be run on 02-17-11. Drilling pit lined and freeboard maintained. No E/S control issues on site. Inspection conducted w/OGI J. Branan. |
|
1953029 | 2011-02-17 | No Violations Noted | Waiting on kick-off cement plug at time of inspection.
Titan Wireline ran cement bond log in 8 5/8" casing. Tagged cement at 2388'. 8 5/8" casing shoe at 2377'. Log showed 50% bond of 8 5/8" in 11 3/4" casing at 250'; 90% bond at 400'. 509' of 11 3/4" casing previously set in 15" hole and cemented with 260 sacks of "A" containing 3% CACL2 & 1/4# flake & 0.2% foam chek (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 01:00 02-05-11. Drilling pit lined and freeboard maintained. No E/S control issues on site. |
|
1953032 | 2011-02-25 | No Violations Noted | Waiting on new bit at time of inspection. Building curve at 2544' MD with kickoff point at 2461' vertical depth.
Drilling pit lined and freeboard maintained. No E/S control issues on site. Inspection conducted w/OGI J. Branan. |
|
1953550 | 2011-03-02 | No Violations Noted | Drilling 7 7/8" lateral at 3498' MD with 9.3 lb/gal mud at time of inspection. Proposed total measured depth = 4450' MD.
Drilling pit lined and freeboard maintained. No E/S control issues on site. |
|
1958609 | 2011-03-11 | No Violations Noted | Location grading being done at time of inspection.
Well shut in on 4 1/2" x 2" swage. 8 5/8" x 4 1/2" annulus closed. 11 3/4" x 8 5/8" annulus not visible. Drilling pit lined and freeboard maintained. No E/S control issues on site. |
|
1998540 | 2011-08-25 | No Violations Noted | Drilling had been completed, well appeared to be equipped for and in production. Oil and brine tanks located onsite and they appeared to be in sound condition. There was no accelerated erosion or sedimentation observed in relation to the site or access road. The site had been properly restored and the vegetation had begun to grow. Upon achieving 70% uniform vegetative cover the operator should remove the temporary silt fencing erosion controls. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 12410.0 | 243.0 | 0.0 | 0.0 | 8593.06 | 243.0 |
2011-0 | 32942.0 | 245.0 | 0.0 | 0.0 | 16854.64 | 245.0 |
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2011-0 | FRACING FLUID WASTE | 1000.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2011-0 | DRILLING FLUID WASTE | 2850.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2011-0 | PRODUCED FLUID | 120.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |