X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-131-20190"

Line 4: Line 4:
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.621513, -75.994669 | width=100% | height=100% }}  
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.621513, -75.994669 | width=100% | height=100% }}  
 
|-
 
|-
| County: [[Wyoming County, Pennsylvania|Wyoming]]
+
| County: [[wikipedia:Wyoming County, Pennsylvania|Wyoming]]
 
|-
 
|-
| Municipality: [[Washington Township, Wyoming County, Pennsylvania|Washington Township]]
+
| Municipality: [[wikipedia:Washington Township, Wyoming County, Pennsylvania|Washington Township]]
 
|-
 
|-
| Operator Name: [[CARRIZO (MARCELLUS) LLC]]
+
| Operator Name: [[wikipedia:CARRIZO (MARCELLUS) LLC|CARRIZO (MARCELLUS) LLC]]
 
|-
 
|-
 
| Farm/Lease Name: MAZZARA 8H
 
| Farm/Lease Name: MAZZARA 8H

Revision as of 22:26, 2 May 2014

Well Details

Well ID: 131-20190
Loading map...
County: Wyoming
Municipality: Washington Township
Operator Name: CARRIZO (MARCELLUS) LLC
Farm/Lease Name: MAZZARA 8H
First Permit Date: 2011-07-12
Last Permit Date: 2011-07-12
Spud Date: 2011-08-17
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 41.621513
Longitude: -75.994669

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1990325 2011-07-26 No Violations Noted
2035217 2012-01-17 No Violations Noted Northeast Energy # 10 Comp. Man - James Letsinger (Al)

Still rigging up. Discussed need to clean up around cutting tanks, clean up area on containment with sheen on water, and put citric acid on containment.

2035709 2012-01-20 No Violations Noted Northeast Energy 10, Comp. Man - Tom Weller

Recieved a call yesterday (1/19/12) from Tom Weller about cement job on 13 3/8" csg - failed. Before cement set yesterday, was able to wash out. Have pulled out 13 3/8". Will run in with bit to TD, 800', blow out hole with air, then run 13 3/8" csg again and cement. Checked cellar - no bubbles. Discussed nedd to clean up spilled defoamer, on containment. 0 - 38' soil, overburden No water. 20 " cond. set at 44' on 5/25/2011

2038883 2012-02-01 No Violations Noted
2067011 2012-05-07 No Violations Noted Rig NE 11 Comp. Man - Gary Titus

drilling at 2022' Started drilling 5/6/2012 @ 1620'. checked cellar - no bubbles Flare - ignitor - check if working.

2067596 2012-05-14 No Violations Noted Northeast 11, Comp. Man - Gary Titus, Checked drillers log - @ 7045'

Discussed need to put gas shows in drillers log. BOP test 5-6-2012. Will stop at about 7200', run gyro, and skid rig in AM to the 5H.

2117812 2012-11-26 Pending

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 DRILL CUTTINGS 695.98 Tons LANDFILL 301626 WHITE PINES LANDFILL MILLVILLE PA
2012-1 DRILL CUTTINGS 436.0 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH