If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Line 4: | Line 4: | ||
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.849558, -78.146366 | width=100% | height=100% }} | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.849558, -78.146366 | width=100% | height=100% }} | ||
|- | |- | ||
− | | County: [[ | + | | County: [[Potter County, Pennsylvania|Potter]] |
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Clara Township, Potter County, Pennsylvania|Clara Township]] |
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[PA GEN ENERGY CO LLC|PA GEN ENERGY CO LLC]] |
|- | |- | ||
| Farm/Lease Name: FISK HOLLOW 2452 | | Farm/Lease Name: FISK HOLLOW 2452 |
Well ID: 105-21668 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.849558,"lon":-78.146366,"icon":""}]} |
County: Potter | |
Municipality: Clara Township | |
Operator Name: PA GEN ENERGY CO LLC | |
Farm/Lease Name: FISK HOLLOW 2452 | |
First Permit Date: 2010-05-04 | |
Last Permit Date: 2010-05-04 | |
Spud Date: 2010-08-30 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: 3 | |
Latitude: 41.849558 | |
Longitude: -78.146366 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1946121 | 2011-01-27 | No Violations Noted | ||
1951315 | 2011-02-18 | No Violations Noted | ||
2017568 | 2011-11-08 | Violation(s) Noted | An inspection was conducted at the Fisk Hollow Pad B on 11/8/11. The site ID sign and E&S plan and site perimeter were observed. The access road was installed, stabilized and the accociated BMPs functioning. The perimeter BMPs were installed and functioning. The site were stablized. A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL). During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release. A voicemail was left for Landon Vanord, Enviromental Technician from PGE, at 1033 on his cell phone making aware of the release. A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568) | 624100 |
2017568 | 2011-11-08 | Violation(s) Noted | An inspection was conducted at the Fisk Hollow Pad B on 11/8/11. The site ID sign and E&S plan and site perimeter were observed. The access road was installed, stabilized and the accociated BMPs functioning. The perimeter BMPs were installed and functioning. The site were stablized. A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL). During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release. A voicemail was left for Landon Vanord, Enviromental Technician from PGE, at 1033 on his cell phone making aware of the release. A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568) | 624101 |
2017568 | 2011-11-08 | Violation(s) Noted | An inspection was conducted at the Fisk Hollow Pad B on 11/8/11. The site ID sign and E&S plan and site perimeter were observed. The access road was installed, stabilized and the accociated BMPs functioning. The perimeter BMPs were installed and functioning. The site were stablized. A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL). During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release. A voicemail was left for Landon Vanord, Enviromental Technician from PGE, at 1033 on his cell phone making aware of the release. A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568) | 624102 |
2018737 | 2011-11-14 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the Fisk Hollow Pad B on 11/14/11 to collect samples to confirm the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). A hook-up for pumping out the contained fluid was located off the containment and was leaking. On 11/10/11 PGE began the site cleanup. During this inspection, the contaminated soil was seen stored on plastic and was covered awaiting removal. There was a puddle in the excavated area showed a field meter reading over 16 mS. A soil sample was collected from the excavated area in front of the production tanks and submitted for SAC 960 analysis. A puddle in the collection channel at the toe of the slope below the production tanks showed a filed meter reading over 2,000 uS. A sample was collected and submitted for SAC 942 analysis. No new violations were cited during this inspection. - MRN | |
2025377 | 2011-12-09 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the Fisk Hollow Pad B on observe the progress of the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). A hook-up for pumping out the contained fluid was located off the containment and was leaking. On 11/10/11 PGE began the site cleanup. During this inspection, the contaminated soil was seen stored on plastic and was covered awaiting removal. During this inspection, the excavated area remained open, the excavated soil was on-site and cover with plastic. The secondary containment for the three white production tanks, which were empty during this inspection, has been breached in order to excavated soil beneath the liner. A frac tank was on-site and production fluid was being stored there. Field meter reading for Specific Conductivity were taken from the puddles in the excavated area the ditch below the production tanks. No sample were collected because the surface of the puddle were frozen. No new violations were cited during this inspection. | |
2028650 | 2011-12-21 | Outstanding Violations - No Viols Req'd | During this inspection, the contaminated soil has been transported off-site. During this inspection, the excavated has been backfilled. The secondary containment for the three white production tanks, which were empty during this inspection, is currently being reconstructed, the liner has not been re-installed as of this inspection . A mobile frac tank was on-site and production fluid was being stored there, on secondary containment. Field meter reading for Specific Conductivity were taken from the puddles around the excavated area and the ditch below the production tanks; they did not exibit elevated readings for Secific Conductivity. A pudlle behind the the secondary containment and white production tanks exibited a field conductivity reading of 1,900µS. This must be addressed. No new violations were cited during this inspection. Violations remain outstanding related to the spill. - MRN | |
2045286 | 2012-02-24 | Outstanding Violations - No Viols Req'd | On Feb. 24, 2012 a Compliance Evaluation Inspection was conducted at the Fisk Hollow Pleasant Valley Pad B to observe the progress of the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). The ground was frozen and snow covered. Weather conditions were 35 degrees and foggy. The site ID sign, site perimeter and the collection system for the production fluids were observed. There was no signs of erosion noted on-site. There was a puddle located in front of the production fluid tanks that exibited an elevated reading for specific conductivity (approx. 2mS). This was reported via email to PGE the afternoon of Feb. 24, 2012. PGE stated this would be investigated. No new violations were cited during this inspection. . - MRN | |
2060891 | 2012-04-19 | No Violations Noted | On April 19, 2012 a Compliance Evaluation Inspection was conducted at the Fisk Hollow Pleasant Valley Pad B to resolve the violations associated with a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). The excavation area had been backfilled and the were no puddles visible near the containemnt system. The following violations cited in the inpsection report (2017568) referenced above are being resolved.
(1) Solid Waste Management Act, 35 P.S. § 6018.301 - Management of Residual Waste (2) Section 402 of the Clean Streams Law, 35 P.S. §691.402 - discharge of a pollutional substance at the Site created a potential danger of pollution of the waters of the Commonwealth. (3) 25 Pa. Code, §78.57(a) - Failure to adequately control, store and dispose of a production fluid. |
|
2106225 | 2012-10-10 | No Violations Noted |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 54645.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 60813.0 | 182.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 93848.0 | 180.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 9627.0 | 11.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 20.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-24355 | B & B OILFIELD SERVICE - MILLER & CO #3 (SWIW #28) | GARRETTSVILLE | OH |
2012-2 | PRODUCED FLUID | 380.0 | Bbl | INJECTION DISPOSAL WELL | 34-151-23420 | B & B WELL # 2 (BELDEN & BLAKE) | HARTVILLE | OH |
2012-2 | PRODUCED FLUID | 3382.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW005 | CARES MCKEAN WATER TRMT & RECYCLING FAC | MOUNT JEWITT | PA |
2012-2 | PRODUCED FLUID | 332.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR0123 | HYDRO RECOVERY - BLOSSBURG | BLOSSBURG | PA |
2012-2 | PRODUCED FLUID | 642.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-2 | PRODUCED FLUID | 570.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-2 | PRODUCED FLUID | 1314.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2012-2 | PRODUCED FLUID | 909.0 | Bbl | INJECTION DISPOSAL WELL | 34-133-20525 | PANDER RAY TRUCKING INC - BLAZEK #2 SWIW | HIRAM | OH |
2012-2 | PRODUCED FLUID | 67.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | FLOWBACK FRACTURING SAND | 0.45 | Tons | LANDFILL | 301626 | WHITE PINES LANDFILL | MILLVILLE | PA |
2012-2 | PRODUCED FLUID | 305.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL (PANDER RAY TRUCKING INC) | NEWTON FALLS | OH |
2012-2 | PRODUCED FLUID | 305.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21894 | WOLF #2 DISPOSAL WELL (PANDER RAY TRUCKING INC) | NEWTON FALLS | OH |
2012-2 | PRODUCED FLUID | 306.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23203 | WOLF #4 DISPOSAL WELL (PANDER RAY TRUCKING INC) | NEWTON FALLS | OH |
2010-2 | DRILL CUTTINGS | 590.21 | Tons | LANDFILL | 100361 | MCKEAN COUNTY LANDFILL/RUSTICK, LLC | KANE | PA |
2010-2 | DRILLING FLUID WASTE | 150.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO | FRANKLIN | PA |
2010-2 | DRILLING FLUID WASTE | 663.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 | WASTE TREATMENT CORPORATION | WARREN | PA |
2011-1 | DRILLING FLUID WASTE | 166.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 | WASTE TREATMENT CORPORATION | WARREN | PA |
2011-1 | FLOWBACK FRACTURING SAND | 12.47 | Tons | LANDFILL | 100277 | WESTMORELAND WASTE, LLC | BELLE VERNON | PA |
2011-2 | PRODUCED FLUID | 367.22 | Bbl | INJECTION DISPOSAL WELL | 34-007-24355 | B & B OILFIELD SERVICE - MILLER & CO #3 (SWIW #28) | GARRETTSVILLE | OH |
2011-2 | DRILLING FLUID WASTE | 998.83 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR0123 | HYDRO RECOVERY - BLOSSBURG | BLOSSBURG | PA |
2011-2 | PRODUCED FLUID | 6112.58 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 | NORTH STAR BRINE DISPOSAL | YOUNGSTOWN | OH |
2011-2 | PRODUCED FLUID | 14904.79 | Bbl | INJECTION DISPOSAL WELL | UIC 45 | RAY PANDER TRUCKING INC | DIAMOND | OH |
2011-2 | PRODUCED FLUID | 91.26 | Bbl | INJECTION DISPOSAL WELL | 34-133-24096 | SALTYS DISPOSAL - GROSELLE INECTION WELL # 2 | GARRETTSVILLE | OH |
2011-2 | PRODUCED FLUID | 244.35 | Bbl | INJECTION DISPOSAL WELL | 34-133-21076 | SALTYS DISPOSAL - MYERS INECTION WELL #1 | PARIS | OH |
2012-1 | PRODUCED FLUID | 1536.67 | Bbl | INJECTION DISPOSAL WELL | 34-151-23420 | B & B WELL # 2 (BELDEN & BLAKE) | HARTVILLE | OH |
2012-1 | PRODUCED FLUID | 2243.33 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 | BLAZEK PUMP AND WELL | HIRAM | OH |
2012-1 | PRODUCED FLUID | 20.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-1 | PRODUCED FLUID | 1349.17 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2012-1 | PRODUCED FLUID | 410.83 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-1 | PRODUCED FLUID | 1915.83 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL (PANDER RAY TRUCKING INC) | NEWTON FALLS | OH |