If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
|||
Line 504: | Line 504: | ||
|- | |- | ||
|} | |} | ||
+ | ==References== | ||
+ | {{Reflist}} | ||
+ | |||
__NOEDITSECTION__ | __NOEDITSECTION__ |
Well ID: 105-21772 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.727861,"lon":-78.168447,"icon":""}]} |
County: Potter | |
Municipality: Keating Township | |
Operator Name: PA GEN ENERGY CO LLC | |
Farm/Lease Name: REED RUN KEATING PAD A 2522 | |
First Permit Date: 2011-02-11 | |
Last Permit Date: 2011-02-11 | |
Spud Date: 2011-02-24 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: 4 | |
Latitude: 41.727861 | |
Longitude: -78.168447 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1954883 | 2011-03-02 | No Violations Noted | ||
1965407 | 2011-04-13 | No Violations Noted | ||
1966378 | 2011-04-13 | No Violations Noted | ||
1970564 | 2011-04-25 | No Violations Noted | ||
1970576 | 2011-04-25 | No Violations Noted | ||
1996416 | 2011-08-17 | No Violations Noted | ||
2005650 | 2011-09-27 | No Violations Noted | ||
2008728 | 2011-10-05 | Pending | On Oct. 5, 2011 an inspection was conducted at the Reed Run Keating Pad A 2522 well site. The site ID sign, E&S plan, E&S controls and perimeter of the site were observed. The last inspection conducted on behalf of PGE was on 9/30/11. Some perimeter BMPs had been removed and some were still installed. The site was stable, drilling was completed and the fracing process was currently being completed. Several puddles on the site showed elevated reading for specific conductivity. A sample was collected and submitted for analysis. Violations are pending the results of the analysis. A Well Restoration report was submitted for this site and is pending. | |
2015114 | 2011-10-31 | Violation(s) Noted | On Oct. 5, 2011 an inspection was conducted at the Reed Run Keating Summit Pad A 2522 well site. A violation noted during a 11/16/2010 inspection (1928105) for 78.65(3) - Failure to submit or submitting an inadequate well site restoration report within 60 days of restoration of the well site has been corrected and resolved. The sample results for the spill noted during the Oct. 5, 2011 inspection (2008728) resulted in new violations. The spill resulted in violations of 35 PS 691.402 - Potential to pollute waters of the Commonwealth, 35 6018.301 SWMA and 78.56(a) - pits and tanks not constructed with sufficient capacity to contain pollutional substances. The failure to notify the Departmant of the spill resulted is a violation of 25 PA Code 99.31 (a) - failure to report a pollutional incident. The Department has received photo documentation that the area has be remediated, but additional information as to how the cleanup was undertaken has been requested. - MRN | 623489 |
2015114 | 2011-10-31 | Violation(s) Noted | On Oct. 5, 2011 an inspection was conducted at the Reed Run Keating Summit Pad A 2522 well site. A violation noted during a 11/16/2010 inspection (1928105) for 78.65(3) - Failure to submit or submitting an inadequate well site restoration report within 60 days of restoration of the well site has been corrected and resolved. The sample results for the spill noted during the Oct. 5, 2011 inspection (2008728) resulted in new violations. The spill resulted in violations of 35 PS 691.402 - Potential to pollute waters of the Commonwealth, 35 6018.301 SWMA and 78.56(a) - pits and tanks not constructed with sufficient capacity to contain pollutional substances. The failure to notify the Departmant of the spill resulted is a violation of 25 PA Code 99.31 (a) - failure to report a pollutional incident. The Department has received photo documentation that the area has be remediated, but additional information as to how the cleanup was undertaken has been requested. - MRN | 623490 |
2015114 | 2011-10-31 | Violation(s) Noted | On Oct. 5, 2011 an inspection was conducted at the Reed Run Keating Summit Pad A 2522 well site. A violation noted during a 11/16/2010 inspection (1928105) for 78.65(3) - Failure to submit or submitting an inadequate well site restoration report within 60 days of restoration of the well site has been corrected and resolved. The sample results for the spill noted during the Oct. 5, 2011 inspection (2008728) resulted in new violations. The spill resulted in violations of 35 PS 691.402 - Potential to pollute waters of the Commonwealth, 35 6018.301 SWMA and 78.56(a) - pits and tanks not constructed with sufficient capacity to contain pollutional substances. The failure to notify the Departmant of the spill resulted is a violation of 25 PA Code 99.31 (a) - failure to report a pollutional incident. The Department has received photo documentation that the area has be remediated, but additional information as to how the cleanup was undertaken has been requested. - MRN | 623491 |
2015114 | 2011-10-31 | Violation(s) Noted | On Oct. 5, 2011 an inspection was conducted at the Reed Run Keating Summit Pad A 2522 well site. A violation noted during a 11/16/2010 inspection (1928105) for 78.65(3) - Failure to submit or submitting an inadequate well site restoration report within 60 days of restoration of the well site has been corrected and resolved. The sample results for the spill noted during the Oct. 5, 2011 inspection (2008728) resulted in new violations. The spill resulted in violations of 35 PS 691.402 - Potential to pollute waters of the Commonwealth, 35 6018.301 SWMA and 78.56(a) - pits and tanks not constructed with sufficient capacity to contain pollutional substances. The failure to notify the Departmant of the spill resulted is a violation of 25 PA Code 99.31 (a) - failure to report a pollutional incident. The Department has received photo documentation that the area has be remediated, but additional information as to how the cleanup was undertaken has been requested. - MRN | 623492 |
2026861 | 2011-12-15 | No Violations Noted | On Dec. 15, 2011 an inpsection was conducted to follow up on violation discovered during an On Oct. 5, 2011 inspection at the Reed Run Keating Summit Pad A 2522 well site. The violation were cited in an Oct 31, 2011 (2015114) inspection report after receiving the laboratory results. The Department has received photo documentation that the area has be remediated, and reading of the puddles on the pad and the associated ditches during todays inspection did not exibit elevated reading for specific conductivity. Based on today's inpsection and information previously submitted by PGE to the Department, the violation noted above are being resolved. No new violation were cited during this inspection. MRN | |
2029649 | 2011-12-20 | No Violations Noted |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 340374.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 108245.0 | 62.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 1150.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-24355 | B & B OILFIELD SERVICE - MILLER & CO #3 (SWIW #28) | GARRETTSVILLE | OH |
2012-2 | PRODUCED FLUID | 950.0 | Bbl | INJECTION DISPOSAL WELL | 34-151-23420 | B & B WELL # 2 (BELDEN & BLAKE) | HARTVILLE | OH |
2012-2 | PRODUCED FLUID | 1999.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW005 | CARES MCKEAN WATER TRMT & RECYCLING FAC | MOUNT JEWITT | PA |
2012-2 | PRODUCED FLUID | 3688.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-2 | PRODUCED FLUID | 2674.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-2 | PRODUCED FLUID | 1346.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2012-2 | PRODUCED FLUID | 1123.0 | Bbl | INJECTION DISPOSAL WELL | 34-133-20525 | PANDER RAY TRUCKING INC - BLAZEK #2 SWIW | HIRAM | OH |
2012-2 | PRODUCED FLUID | 1223.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | PRODUCED FLUID | 416.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL (PANDER RAY TRUCKING INC) | NEWTON FALLS | OH |
2012-2 | PRODUCED FLUID | 416.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21894 | WOLF #2 DISPOSAL WELL (PANDER RAY TRUCKING INC) | NEWTON FALLS | OH |
2012-2 | PRODUCED FLUID | 416.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23203 | WOLF #4 DISPOSAL WELL (PANDER RAY TRUCKING INC) | NEWTON FALLS | OH |
2011-1 | DRILLING FLUID WASTE | 994.05 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | PA BRINE | PA | |
2011-1 | DRILLING FLUID WASTE | 2995.95 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 | WASTE TREATMENT CORPORATION | WARREN | PA |
2011-2 | PRODUCED FLUID | 261.23 | Bbl | INJECTION DISPOSAL WELL | 34-007-24355 | B & B OILFIELD SERVICE - MILLER & CO #3 (SWIW #28) | GARRETTSVILLE | OH |
2011-2 | DRILL CUTTINGS | 766.09 | Tons | LANDFILL | 100361 | MCKEAN COUNTY LANDFILL/RUSTICK, LLC | KANE | PA |
2011-2 | FRACING FLUID WASTE | 159.68 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 | NORTH STAR BRINE DISPOSAL | YOUNGSTOWN | OH |
2011-2 | PRODUCED FLUID | 2620.57 | Bbl | INJECTION DISPOSAL WELL | UIC 45 | RAY PANDER TRUCKING INC | DIAMOND | OH |
2011-2 | FRACING FLUID WASTE | 67.31 | Bbl | INJECTION DISPOSAL WELL | 34-133-24096 | SALTYS DISPOSAL - GROSELLE INECTION WELL # 2 | GARRETTSVILLE | OH |
2011-2 | FRACING FLUID WASTE | 180.22 | Bbl | INJECTION DISPOSAL WELL | 34-133-21076 | SALTYS DISPOSAL - MYERS INECTION WELL #1 | PARIS | OH |
2011-2 | FLOWBACK FRACTURING SAND | 39.09 | Tons | LANDFILL | 100277 | WESTMORELAND WASTE, LLC | BELLE VERNON | PA |
2012-1 | PRODUCED FLUID | 40.0 | Bbl | INJECTION DISPOSAL WELL | 34-151-23420 | B & B WELL # 2 (BELDEN & BLAKE) | HARTVILLE | OH |
2012-1 | FLOWBACK FRACTURING SAND | 0.88 | Tons | TREATED ON-SITE, NPDES DISCHARGE | PA0084107 | CYCLE CHEM LEWISBERRY | LEWISBERRY | PA |
2012-1 | PRODUCED FLUID | 148.3 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR0123 | HYDRO RECOVERY - BLOSSBURG | BLOSSBURG | PA |
2012-1 | FRACING FLUID WASTE | 670.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-1 | PRODUCED FLUID | 1111.19 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-1 | FRACING FLUID WASTE | 643.93 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-1 | PRODUCED FLUID | 476.67 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-1 | PRODUCED FLUID | 6335.78 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING |