X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-105-21668"

m (Wiki moved page 105-21668 to 42-105-21668)
(No difference)

Revision as of 19:16, 10 May 2014

Well Details

Well ID: 105-21668
Loading map...
County: Potter
Municipality: Clara Township
Operator Name: PA GEN ENERGY CO LLC
Farm/Lease Name: FISK HOLLOW 2452
First Permit Date: 2010-05-04
Last Permit Date: 2010-05-04
Spud Date: 2010-08-30
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: 3
Latitude: 41.849558
Longitude: -78.146366

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1946121 2011-01-27 No Violations Noted
1951315 2011-02-18 No Violations Noted
2017568 2011-11-08 Violation(s) Noted An inspection was conducted at the Fisk Hollow Pad B on 11/8/11. The site ID sign and E&S plan and site perimeter were observed. The access road was installed, stabilized and the accociated BMPs functioning. The perimeter BMPs were installed and functioning. The site were stablized. A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL). During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release. A voicemail was left for Landon Vanord, Enviromental Technician from PGE, at 1033 on his cell phone making aware of the release. A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568) 624100
2017568 2011-11-08 Violation(s) Noted An inspection was conducted at the Fisk Hollow Pad B on 11/8/11. The site ID sign and E&S plan and site perimeter were observed. The access road was installed, stabilized and the accociated BMPs functioning. The perimeter BMPs were installed and functioning. The site were stablized. A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL). During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release. A voicemail was left for Landon Vanord, Enviromental Technician from PGE, at 1033 on his cell phone making aware of the release. A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568) 624101
2017568 2011-11-08 Violation(s) Noted An inspection was conducted at the Fisk Hollow Pad B on 11/8/11. The site ID sign and E&S plan and site perimeter were observed. The access road was installed, stabilized and the accociated BMPs functioning. The perimeter BMPs were installed and functioning. The site were stablized. A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL). During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release. A voicemail was left for Landon Vanord, Enviromental Technician from PGE, at 1033 on his cell phone making aware of the release. A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568) 624102
2018737 2011-11-14 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the Fisk Hollow Pad B on 11/14/11 to collect samples to confirm the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). A hook-up for pumping out the contained fluid was located off the containment and was leaking. On 11/10/11 PGE began the site cleanup. During this inspection, the contaminated soil was seen stored on plastic and was covered awaiting removal. There was a puddle in the excavated area showed a field meter reading over 16 mS. A soil sample was collected from the excavated area in front of the production tanks and submitted for SAC 960 analysis. A puddle in the collection channel at the toe of the slope below the production tanks showed a filed meter reading over 2,000 uS. A sample was collected and submitted for SAC 942 analysis. No new violations were cited during this inspection. - MRN
2025377 2011-12-09 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the Fisk Hollow Pad B on observe the progress of the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). A hook-up for pumping out the contained fluid was located off the containment and was leaking. On 11/10/11 PGE began the site cleanup. During this inspection, the contaminated soil was seen stored on plastic and was covered awaiting removal. During this inspection, the excavated area remained open, the excavated soil was on-site and cover with plastic. The secondary containment for the three white production tanks, which were empty during this inspection, has been breached in order to excavated soil beneath the liner. A frac tank was on-site and production fluid was being stored there. Field meter reading for Specific Conductivity were taken from the puddles in the excavated area the ditch below the production tanks. No sample were collected because the surface of the puddle were frozen. No new violations were cited during this inspection.
2028650 2011-12-21 Outstanding Violations - No Viols Req'd During this inspection, the contaminated soil has been transported off-site. During this inspection, the excavated has been backfilled. The secondary containment for the three white production tanks, which were empty during this inspection, is currently being reconstructed, the liner has not been re-installed as of this inspection . A mobile frac tank was on-site and production fluid was being stored there, on secondary containment. Field meter reading for Specific Conductivity were taken from the puddles around the excavated area and the ditch below the production tanks; they did not exibit elevated readings for Secific Conductivity. A pudlle behind the the secondary containment and white production tanks exibited a field conductivity reading of 1,900µS. This must be addressed. No new violations were cited during this inspection. Violations remain outstanding related to the spill. - MRN
2045286 2012-02-24 Outstanding Violations - No Viols Req'd On Feb. 24, 2012 a Compliance Evaluation Inspection was conducted at the Fisk Hollow Pleasant Valley Pad B to observe the progress of the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). The ground was frozen and snow covered. Weather conditions were 35 degrees and foggy. The site ID sign, site perimeter and the collection system for the production fluids were observed. There was no signs of erosion noted on-site. There was a puddle located in front of the production fluid tanks that exibited an elevated reading for specific conductivity (approx. 2mS). This was reported via email to PGE the afternoon of Feb. 24, 2012. PGE stated this would be investigated. No new violations were cited during this inspection. . - MRN
2060891 2012-04-19 No Violations Noted On April 19, 2012 a Compliance Evaluation Inspection was conducted at the Fisk Hollow Pleasant Valley Pad B to resolve the violations associated with a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). The excavation area had been backfilled and the were no puddles visible near the containemnt system. The following violations cited in the inpsection report (2017568) referenced above are being resolved.

(1) Solid Waste Management Act, 35 P.S. § 6018.301 - Management of Residual Waste (2) Section 402 of the Clean Streams Law, 35 P.S. §691.402 - discharge of a pollutional substance at the Site created a potential danger of pollution of the waters of the Commonwealth. (3) 25 Pa. Code, §78.57(a) - Failure to adequately control, store and dispose of a production fluid.

2106225 2012-10-10 No Violations Noted

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 54645.0 184.0 0.0 0.0 0.0 0.0
2012-1 60813.0 182.0 0.0 0.0 0.0 0.0
2011-2 93848.0 180.0 0.0 0.0 0.0 0.0
2011-1 9627.0 11.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 PRODUCED FLUID 20.0 Bbl INJECTION DISPOSAL WELL 34-007-24355 B & B OILFIELD SERVICE - MILLER & CO #3 (SWIW #28) GARRETTSVILLE OH
2012-2 PRODUCED FLUID 380.0 Bbl INJECTION DISPOSAL WELL 34-151-23420 B & B WELL # 2 (BELDEN & BLAKE) HARTVILLE OH
2012-2 PRODUCED FLUID 3382.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005 CARES MCKEAN WATER TRMT & RECYCLING FAC MOUNT JEWITT PA
2012-2 PRODUCED FLUID 332.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR0123 HYDRO RECOVERY - BLOSSBURG BLOSSBURG PA
2012-2 PRODUCED FLUID 642.0 Bbl INJECTION DISPOSAL WELL 34-155-21438 KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS VIENNA OH
2012-2 PRODUCED FLUID 570.0 Bbl INJECTION DISPOSAL WELL 34-155-21447 KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS VIENNA OH
2012-2 PRODUCED FLUID 1314.0 Bbl INJECTION DISPOSAL WELL 34-155-23795 PANDER #1 (SWIW #15) NEWTON FALLS OH
2012-2 PRODUCED FLUID 909.0 Bbl INJECTION DISPOSAL WELL 34-133-20525 PANDER RAY TRUCKING INC - BLAZEK #2 SWIW HIRAM OH
2012-2 PRODUCED FLUID 67.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 FLOWBACK FRACTURING SAND 0.45 Tons LANDFILL 301626 WHITE PINES LANDFILL MILLVILLE PA
2012-2 PRODUCED FLUID 305.0 Bbl INJECTION DISPOSAL WELL 34-155-21893 WOLF #1 DISP WELL (PANDER RAY TRUCKING INC) NEWTON FALLS OH
2012-2 PRODUCED FLUID 305.0 Bbl INJECTION DISPOSAL WELL 34-155-21894 WOLF #2 DISPOSAL WELL (PANDER RAY TRUCKING INC) NEWTON FALLS OH
2012-2 PRODUCED FLUID 306.0 Bbl INJECTION DISPOSAL WELL 34-155-23203 WOLF #4 DISPOSAL WELL (PANDER RAY TRUCKING INC) NEWTON FALLS OH
2010-2 DRILL CUTTINGS 590.21 Tons LANDFILL 100361 MCKEAN COUNTY LANDFILL/RUSTICK, LLC KANE PA
2010-2 DRILLING FLUID WASTE 150.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2010-2 DRILLING FLUID WASTE 663.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784 WASTE TREATMENT CORPORATION WARREN PA
2011-1 DRILLING FLUID WASTE 166.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784 WASTE TREATMENT CORPORATION WARREN PA
2011-1 FLOWBACK FRACTURING SAND 12.47 Tons LANDFILL 100277 WESTMORELAND WASTE, LLC BELLE VERNON PA
2011-2 PRODUCED FLUID 367.22 Bbl INJECTION DISPOSAL WELL 34-007-24355 B & B OILFIELD SERVICE - MILLER & CO #3 (SWIW #28) GARRETTSVILLE OH
2011-2 DRILLING FLUID WASTE 998.83 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR0123 HYDRO RECOVERY - BLOSSBURG BLOSSBURG PA
2011-2 PRODUCED FLUID 6112.58 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127 NORTH STAR BRINE DISPOSAL YOUNGSTOWN OH
2011-2 PRODUCED FLUID 14904.79 Bbl INJECTION DISPOSAL WELL UIC 45 RAY PANDER TRUCKING INC DIAMOND OH
2011-2 PRODUCED FLUID 91.26 Bbl INJECTION DISPOSAL WELL 34-133-24096 SALTYS DISPOSAL - GROSELLE INECTION WELL # 2 GARRETTSVILLE OH
2011-2 PRODUCED FLUID 244.35 Bbl INJECTION DISPOSAL WELL 34-133-21076 SALTYS DISPOSAL - MYERS INECTION WELL #1 PARIS OH
2012-1 PRODUCED FLUID 1536.67 Bbl INJECTION DISPOSAL WELL 34-151-23420 B & B WELL # 2 (BELDEN & BLAKE) HARTVILLE OH
2012-1 PRODUCED FLUID 2243.33 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1 BLAZEK PUMP AND WELL HIRAM OH
2012-1 PRODUCED FLUID 20.0 Bbl INJECTION DISPOSAL WELL 34-155-21447 KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS VIENNA OH
2012-1 PRODUCED FLUID 1349.17 Bbl INJECTION DISPOSAL WELL 34-155-23795 PANDER #1 (SWIW #15) NEWTON FALLS OH
2012-1 PRODUCED FLUID 410.83 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-1 PRODUCED FLUID 1915.83 Bbl INJECTION DISPOSAL WELL 34-155-21893 WOLF #1 DISP WELL (PANDER RAY TRUCKING INC) NEWTON FALLS OH