If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m (Wiki moved page 125-24297 to 42-125-24297) |
(No difference)
|
Well ID: 125-24297 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.029361,"lon":-80.214163,"icon":""}]} |
County: Washington | |
Municipality: Amwell Township | |
Operator Name: RANGE RESOURCES APPALACHIA LLC | |
Farm/Lease Name: KEARNEY RICHARD UNIT 3H | |
First Permit Date: 2010-09-14 | |
Last Permit Date: 2010-09-14 | |
Spud Date: 2011-01-15 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 40.029361 | |
Longitude: -80.214163 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1953655 | 2011-01-25 | No Violations Noted | Ransom Auger - spud in conductor, site and location good, E & S in place , no pit , this site to be closed loop | |
1953659 | 2011-02-03 | No Violations Noted | Northeast 11 - TD@ 100', drilling 24" hole, site and location good, closed loop | |
1953660 | 2011-02-09 | No Violations Noted | Northeast 11 - TD@1884, running 9.58" in hole, returns on cement on 13.38" and 20" site and location good, closed loop | |
1953662 | 2011-02-16 | No Violations Noted | Northeast 11 - TD@6377, tripping out , vertical drilling completed for now, hole to be loaded with mud, site and location good, closed loop | |
2089138 | 2012-08-02 | No Violations Noted |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 360949.0 | 91.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 131.47 | Bbl | INJECTION DISPOSAL WELL | 34-121-24086 | HUNTER DISPOSAL - TRAVIS UNIT #200405 (SWIW #7) | DEXTER CITY | OH |
2012-2 | PRODUCED FLUID | 154.71 | Bbl | INJECTION DISPOSAL WELL | 2D0859721 | MASON WELL #1 (47-085-09721) - HAUGHT ENERGY CORP | ELLENBORO | WV |
2012-2 | PRODUCED FLUID | 1639.02 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | FLOWBACK FRACTURING SAND | 2.02 | Tons | LANDFILL | 100277 | WESTMORELAND WASTE, LLC | BELLE VERNON | PA |
2011-1 | PRODUCED FLUID | 1738.1 | Bbl | REUSE OTHER THAN ROAD SPREADING | FRAC WATER REUSE | PA | ||
2011-2 | DRILLING FLUID WASTE | 121.83 | Bbl | REUSE OTHER THAN ROAD SPREADING | FRAC WATER REUSE | PA | ||
2012-1 | DRILLING FLUID WASTE | 133.66 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 | RESERVED ENVIRONMENTAL SERVICES | MOUNT PLEASANT | PA |
2012-1 | FRACING FLUID WASTE | 3200.34 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-1 | PRODUCED FLUID | 138.1 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-1 | DRILLING FLUID WASTE | 6.14 | Bbl | LANDFILL | 100277 | WESTMORELAND WASTE, LLC | BELLE VERNON | PA |