Well ID: 007-20319 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.687638,"lon":-80.403027,"icon":""}]} |
County: Beaver | |
Municipality: Brighton Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Farm/Lease Name: JENKINS BEA 8H | |
First Permit Date: 2011-12-16 | |
Last Permit Date: 2011-12-16 | |
Spud Date: 2012-07-29 | |
Unconventional: No | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 40.687638 | |
Longitude: -80.403027 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2054792 | 2012-03-27 | No Violations Noted | On March 27th, 2012 John Ley Water Quality Specialist SWRO and John Carson Water Quality Specialist SWRO were on site at the Chesapeake Energy’s Jenkins 8H Pad in Chippewa, Beaver Cty., PA Approval #ESX11-007-0014 to carry out a routine inspection of this new site.
Entering the site, we were met by Mr. Marc Mathers and Mr. Stephan Ault who are both Field Representatives for Chesapeake. The only activity at this site thus far was the construction of a tempoary, stone access road. The signage was complete. There was no lock box yet and the site plans and permit were not yet available. Throughout the site, it was staked but no E&S controls have been constructed according to the E&S plan. |
|
2064246 | 2012-04-24 | No Violations Noted | THE SITE IS UNDER CONSTRUCTION. THE WELL HAS NOT BEEN SPUDDED.
THERE ARE E&S CONTROLS IN PLACE. |
|
2087038 | 2012-07-26 | No Violations Noted | SITE IS BUILT. SOUND WALL IS UP. THE WELL HAS NOT BEEN SPUDDED. | |
2087359 | 2012-07-27 | No Violations Noted | The site ID and ESCGP plan were on site. The pad was not in production. The areas that needed repaired from the storm washout that were noted in the last inspection were in good shape and had good vegetation, helping to stabilize the hillsides.
Sound barrier had been constructed around the perimeter of the site. The site looked to be in good condition. |
|
2093453 | 2012-08-03 | No Violations Noted | PAD IS BUILT. THE SOUND WALL IS UP. CONDUCTOR IS IN.
NO RIG. |
|
2095894 | 2012-08-14 | No Violations Noted | ||
2095906 | 2012-08-21 | No Violations Noted | DRILLING AT 2,247'. CEMENT RETURNS ON ALL CASING STRINGS. SITE IS IN GOOD CONDITION. | |
2097487 | 2012-08-29 | No Violations Noted | NOMAC 245 RUNNING RODS TO RESUME DRILLING.
THE SITE IS IN GOOD CONDITION. |
|
2098812 | 2012-09-11 | No Violations Noted | John Ley , WQS, SWRO was on site to conduct a routine inspection. At the time of the inspection, the well sign, E&S plan, and well permit were on site. BMP's installed were functioning according to the E&S plan. Hillsides were temporarily stabilized and had good growth on them. No accelerated erosion or sedimentation issues were observed on site.
The site was drilled and the operator was in the process of removing equipment from the pad. |
|
2064246 | 2012-04-24 | No Violations Noted | THE SITE IS UNDER CONSTRUCTION. THE WELL HAS NOT BEEN SPUDDED.
THERE ARE E&S CONTROLS IN PLACE. |
|
2087038 | 2012-07-26 | No Violations Noted | SITE IS BUILT. SOUND WALL IS UP. THE WELL HAS NOT BEEN SPUDDED. | |
2093453 | 2012-08-03 | No Violations Noted | PAD IS BUILT. THE SOUND WALL IS UP. CONDUCTOR IS IN.
NO RIG. |
|
2095894 | 2012-08-14 | No Violations Noted | ||
2095906 | 2012-08-21 | No Violations Noted | DRILLING AT 2,247'. CEMENT RETURNS ON ALL CASING STRINGS. SITE IS IN GOOD CONDITION. | |
2097487 | 2012-08-29 | No Violations Noted | NOMAC 245 RUNNING RODS TO RESUME DRILLING.
THE SITE IS IN GOOD CONDITION. |
|
2131293 | 2013-01-09 | No Violations Noted | WELL IS DRILLED AND FRACED. THE WELL IS PROTECTED. THE PAD IS FENCED AND LOCKED. | |
2133462 | 2013-01-25 | No Violations Noted | John Ley, WQS SWRO met with Mr. Peter Dombroski Field Representatve for Chesapeake Energy Corporation to discuss and approve minor modification for the Jenkins site proposed, water impoundment. The impoundment proposed location is 40.6856 -80.4034. The change included a decrease in depth for the impoundment but no change to the location or LOD. Tis modification was also reviewed by the Department's Engineer Tae-Uk Kim. Two copies of the modified, impoundment drawings were initialed and left with Mr. Dombroski. One of these copies will be placed in the site mail box. A third set of drawings is attached to this report along with the email from Mr. Kim. | |
2131293 | 2013-01-09 | No Violations Noted | WELL IS DRILLED AND FRACED. THE WELL IS PROTECTED. THE PAD IS FENCED AND LOCKED. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | DRILL CUTTINGS | 1003.22 | Tons | LANDFILL | CID # 28726 | CARBON LIMESTONE LANDFILL - BFI | LOWELLVILLE | OH |
2012-2 | DRILLING FLUID WASTE | 220.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | PRODUCED FLUID | 1344.76 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING |