Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-127-20017 | | Well ID: 37-127-20017 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.765888, -75.109388 | width=100% | height=100% }} |
+ | |- | ||
+ | | County: [[Wayne County, Pennsylvania|Wayne]] | ||
+ | |- | ||
+ | | Municipality: [[Damascus Township, Wayne County, Pennsylvania|Damascus Township]] | ||
|- | |- | ||
| Operator Name: [[NEWFIELD APPALACHIA PA LLC]] | | Operator Name: [[NEWFIELD APPALACHIA PA LLC]] | ||
+ | |- | ||
+ | | Well Pad ID: | ||
+ | |- | ||
+ | | Farm/Lease Name: WOODLAND MGMT PARTNERS 1 1 | ||
|- | |- | ||
| First Permit Date: 2010-05-27 | | First Permit Date: 2010-05-27 | ||
Line 16: | Line 24: | ||
|- | |- | ||
| Horizontal: No | | Horizontal: No | ||
+ | |- | ||
+ | | Well Status: ACTIVE | ||
|- | |- | ||
| Violations: 1 | | Violations: 1 | ||
Line 34: | Line 44: | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
|- | |- | ||
− | | | + | | 2010-0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 52: | Line 62: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2012-0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 61: | Line 71: | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 72: | Line 88: | ||
!scope="col" | FACILITY CITY | !scope="col" | FACILITY CITY | ||
!scope="col" | FACILITY STATE | !scope="col" | FACILITY STATE | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2010-0 | | 2010-0 | ||
Line 97: | Line 102: | ||
| 2010-0 | | 2010-0 | ||
| DRILLING FLUID WASTE | | DRILLING FLUID WASTE | ||
− | | style="text-align:right;" | | + | | style="text-align:right;" | 3.0 |
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR119 | ||
+ | | EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT | ||
+ | | WILLIAMSPORT | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-0 | ||
+ | | DRILLING FLUID WASTE | ||
+ | | style="text-align:right;" | 2.0 | ||
| Bbl | | Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 106: | Line 122: | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 113: | Line 135: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 1900332 | | 1900332 | ||
Line 118: | Line 142: | ||
| No Violations Noted | | No Violations Noted | ||
| UDI rig 48. 20" conductor set. Rigging up to start drilling 13 3/8" casing. Reserve pit in good condition. Freeboard = 5'. Work area is lined with plastic and perimeter around rig is bermed. Drillers log on site and up to date. Mudlogger on site to log hole fro surface to TD. | | UDI rig 48. 20" conductor set. Rigging up to start drilling 13 3/8" casing. Reserve pit in good condition. Freeboard = 5'. Work area is lined with plastic and perimeter around rig is bermed. Drillers log on site and up to date. Mudlogger on site to log hole fro surface to TD. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 125: | Line 151: | ||
| No Violations Noted | | No Violations Noted | ||
| Well installation complete. Rig moved off location to Crum. Reserve pit still open and full of fluid. Freeboard ok and liner in good condition. Plan to solidify and encapsulate pit next week. | | Well installation complete. Rig moved off location to Crum. Reserve pit still open and full of fluid. Freeboard ok and liner in good condition. Plan to solidify and encapsulate pit next week. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 132: | Line 160: | ||
| No Violations Noted | | No Violations Noted | ||
| Complaint of Sulphur odor coming from site. Contractor in process of dewatering pit. Fluid transferred to frac tanks and then trucked offsite for disposal. When pumping- odor emiited through vents on tanks. Pit is going to be solidified and then encapsulated this week. | | Complaint of Sulphur odor coming from site. Contractor in process of dewatering pit. Fluid transferred to frac tanks and then trucked offsite for disposal. When pumping- odor emiited through vents on tanks. Pit is going to be solidified and then encapsulated this week. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 139: | Line 169: | ||
| No Violations Noted | | No Violations Noted | ||
| Mike O'Donnell and I conducted an inspection of this site. We recommend that the operator update the E&S plan to accurately reflect the controls as installed. | | Mike O'Donnell and I conducted an inspection of this site. We recommend that the operator update the E&S plan to accurately reflect the controls as installed. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 146: | Line 178: | ||
| No Violations Noted | | No Violations Noted | ||
| on site with WQS Ryan Klemish. Inspected site and well head. Well is shut in. Pressure gauge on well indicated 0 psi. Cellar full of water. No gas bubbling observed. Well head and cellar are protected by chain-link fence and gae with pad lock. There was no activity on site at time of inspection. no violations were observed at the time of inspection. | | on site with WQS Ryan Klemish. Inspected site and well head. Well is shut in. Pressure gauge on well indicated 0 psi. Cellar full of water. No gas bubbling observed. Well head and cellar are protected by chain-link fence and gae with pad lock. There was no activity on site at time of inspection. no violations were observed at the time of inspection. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 154: | Line 188: | ||
| | | | ||
| 609115 | | 609115 | ||
+ | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
+ | | Violation for failure to properly stabilize topsoil pile. Operator was originally advised of this issue in inspection conducted 11/2/2010.. | ||
|- | |- | ||
|- | |- | ||
Line 160: | Line 196: | ||
| Outstanding Violations - No Viols Req'd | | Outstanding Violations - No Viols Req'd | ||
| Meeting with Newfield representative to discuss their response to my findings on 4/18/2011. | | Meeting with Newfield representative to discuss their response to my findings on 4/18/2011. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 167: | Line 205: | ||
| No Violations Noted | | No Violations Noted | ||
| Followup to close out violations from 4/18/2011. No viols noted. | | Followup to close out violations from 4/18/2011. No viols noted. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 174: | Line 214: | ||
| No Violations Noted | | No Violations Noted | ||
| DEP on site at 10 am. Operator has filed for Inactive Status. Site is secured with entrance gate and chain-link fence around well head. Well is temporarily shut in. No leaks observed visually in cellar. No activity on site site during inspection. E&S controls appear to be in place and working sufficiently. DEP offsite at 10:30 | | DEP on site at 10 am. Operator has filed for Inactive Status. Site is secured with entrance gate and chain-link fence around well head. Well is temporarily shut in. No leaks observed visually in cellar. No activity on site site during inspection. E&S controls appear to be in place and working sufficiently. DEP offsite at 10:30 | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 181: | Line 223: | ||
| No Violations Noted | | No Violations Noted | ||
| On site 11:30. Gate locked. Operator provided access. No one on site at time of inspection. Well has been plugged. Well head removed and casing cut off below grade. A time of inspection cellar was full of water from recent rains. Could not see well. Operator has provided prictures of well with welded cap that has permit number welded on it. No violations observed. | | On site 11:30. Gate locked. Operator provided access. No one on site at time of inspection. Well has been plugged. Well head removed and casing cut off below grade. A time of inspection cellar was full of water from recent rains. Could not see well. Operator has provided prictures of well with welded cap that has permit number welded on it. No violations observed. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 187: | Line 231: | ||
| 2012-09-19 | | 2012-09-19 | ||
| No Violations Noted | | No Violations Noted | ||
− | | Today is the second day of the reclamation activity being conducted of this pad. Monday, 9/17/12 was the first day of earth moving activity. Tuesday, 9/18/12 was a day of rain. Plans are on site, but in a weathered condition, need to be replaced. Weather is sunny today, with the next forecasted rain event being called for on Saturday, 9/22/12. Contractor is minimizing soil disturbance to north section of pad. Contractor is operating under the assumption that the originally installed silt sock is acceptable to meeting the designed runoff reduction criteria. A review of this | + | | Today is the second day of the reclamation activity being conducted of this pad. Monday, 9/17/12 was the first day of earth moving activity. Tuesday, 9/18/12 was a day of rain. Plans are on site, but in a weathered condition, need to be replaced. Weather is sunny today, with the next forecasted rain event being called for on Saturday, 9/22/12. Contractor is minimizing soil disturbance to north section of pad. Contractor is operating under the assumption that the originally installed silt sock is acceptable to meeting the designed runoff reduction criteria. A review of this モexistingï¾” silt sock shows that it needs to be replaced immediately. Also, debris from the existing silt sock needs to be removed. Told Ted that he can continue to conduct earth moving activities until a rain event is eminent. Hence, it was agreed that if new silt sock is not installed by the close of business on Friday, 9/22/12, |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 195: | Line 241: | ||
| No Violations Noted | | No Violations Noted | ||
| Inspection conducted with Ted Korb of Leeward Construction, contractor for Newfield Appalachia, on 9/26/12 of the Woodland Mgt. Partners well pad. Ted had called and left message on this past Friday, 9/21/12, stating that the required silt sock had been installed. Inspection revealed that the silt sock was installed as per plan, and was installed properly. Approximately 90% of the pad has been leveled back near original contours. After final leveling, top soil pile will be distributed and leveled over site. The access road built for the pad is under one acre, and hence can stay in place if land owner so desires. | | Inspection conducted with Ted Korb of Leeward Construction, contractor for Newfield Appalachia, on 9/26/12 of the Woodland Mgt. Partners well pad. Ted had called and left message on this past Friday, 9/21/12, stating that the required silt sock had been installed. Inspection revealed that the silt sock was installed as per plan, and was installed properly. Approximately 90% of the pad has been leveled back near original contours. After final leveling, top soil pile will be distributed and leveled over site. The access road built for the pad is under one acre, and hence can stay in place if land owner so desires. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 200: | Line 248: | ||
| 2155629 | | 2155629 | ||
| 2013-04-09 | | 2013-04-09 | ||
− | |||
− | |||
| No Violations Noted | | No Violations Noted | ||
+ | | Inspection conducted on 4/9/13. The lower third of the site needs to be regraded, seeded, and mulched. The ruts located in this area are beginning to turn into gullies. Please provide documentation of the E & S inspections conducted over the last month. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2322366 | ||
+ | | 2014-11-13 | ||
+ | | No Violations Noted | ||
+ | | Inspection conducted of the Newfield Woodland Mgmt Partners 1 1 Well Pad Site covered under the E&S well pad plan for the Newfield Woodland Mgmt Partners 1 1 Well (127-20017). Inspection conducted on 11/13/14. Inspection is to confirm Newfield | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-127-20017 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.765888,"lon":-75.109388,"icon":""}]} |
County: Wayne | |
Municipality: Damascus Township | |
Operator Name: NEWFIELD APPALACHIA PA LLC | |
Well Pad ID: | |
Farm/Lease Name: WOODLAND MGMT PARTNERS 1 1 | |
First Permit Date: 2010-05-27 | |
Last Permit Date: 2010-05-27 | |
Spud Date: 2010-06-25 | |
Unconventional: No | |
Horizontal: No | |
Well Status: ACTIVE | |
Violations: 1 | |
Latitude: 41.765888 | |
Longitude: -75.109388 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-0 | DRILL CUTTINGS | 26.0 | Tons | LANDFILL | 101247 | KEYSTONE SANITARY LANDFILL | DUNMORE | PA |
2010-0 | DRILLING FLUID WASTE | 3.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT | WILLIAMSPORT | PA |
2010-0 | DRILLING FLUID WASTE | 2.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 | WASTE TREATMENT CORPORATION | WARREN | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1900332 | 2010-07-22 | No Violations Noted | UDI rig 48. 20" conductor set. Rigging up to start drilling 13 3/8" casing. Reserve pit in good condition. Freeboard = 5'. Work area is lined with plastic and perimeter around rig is bermed. Drillers log on site and up to date. Mudlogger on site to log hole fro surface to TD. | |||
1912355 | 2010-09-02 | No Violations Noted | Well installation complete. Rig moved off location to Crum. Reserve pit still open and full of fluid. Freeboard ok and liner in good condition. Plan to solidify and encapsulate pit next week. | |||
1912375 | 2010-09-08 | No Violations Noted | Complaint of Sulphur odor coming from site. Contractor in process of dewatering pit. Fluid transferred to frac tanks and then trucked offsite for disposal. When pumping- odor emiited through vents on tanks. Pit is going to be solidified and then encapsulated this week. | |||
1926591 | 2010-11-02 | No Violations Noted | Mike O'Donnell and I conducted an inspection of this site. We recommend that the operator update the E&S plan to accurately reflect the controls as installed. | |||
1966501 | 2011-04-18 | No Violations Noted | on site with WQS Ryan Klemish. Inspected site and well head. Well is shut in. Pressure gauge on well indicated 0 psi. Cellar full of water. No gas bubbling observed. Well head and cellar are protected by chain-link fence and gae with pad lock. There was no activity on site at time of inspection. no violations were observed at the time of inspection. | |||
1966630 | 2011-04-18 | Violation(s) Noted | 609115 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Violation for failure to properly stabilize topsoil pile. Operator was originally advised of this issue in inspection conducted 11/2/2010.. | |
1968208 | 2011-04-20 | Outstanding Violations - No Viols Req'd | Meeting with Newfield representative to discuss their response to my findings on 4/18/2011. | |||
1969810 | 2011-05-02 | No Violations Noted | Followup to close out violations from 4/18/2011. No viols noted. | |||
2009350 | 2011-10-06 | No Violations Noted | DEP on site at 10 am. Operator has filed for Inactive Status. Site is secured with entrance gate and chain-link fence around well head. Well is temporarily shut in. No leaks observed visually in cellar. No activity on site site during inspection. E&S controls appear to be in place and working sufficiently. DEP offsite at 10:30 | |||
2099639 | 2012-08-30 | No Violations Noted | On site 11:30. Gate locked. Operator provided access. No one on site at time of inspection. Well has been plugged. Well head removed and casing cut off below grade. A time of inspection cellar was full of water from recent rains. Could not see well. Operator has provided prictures of well with welded cap that has permit number welded on it. No violations observed. | |||
2101959 | 2012-09-19 | No Violations Noted | Today is the second day of the reclamation activity being conducted of this pad. Monday, 9/17/12 was the first day of earth moving activity. Tuesday, 9/18/12 was a day of rain. Plans are on site, but in a weathered condition, need to be replaced. Weather is sunny today, with the next forecasted rain event being called for on Saturday, 9/22/12. Contractor is minimizing soil disturbance to north section of pad. Contractor is operating under the assumption that the originally installed silt sock is acceptable to meeting the designed runoff reduction criteria. A review of this モexistingヤ silt sock shows that it needs to be replaced immediately. Also, debris from the existing silt sock needs to be removed. Told Ted that he can continue to conduct earth moving activities until a rain event is eminent. Hence, it was agreed that if new silt sock is not installed by the close of business on Friday, 9/22/12, | |||
2102817 | 2012-09-26 | No Violations Noted | Inspection conducted with Ted Korb of Leeward Construction, contractor for Newfield Appalachia, on 9/26/12 of the Woodland Mgt. Partners well pad. Ted had called and left message on this past Friday, 9/21/12, stating that the required silt sock had been installed. Inspection revealed that the silt sock was installed as per plan, and was installed properly. Approximately 90% of the pad has been leveled back near original contours. After final leveling, top soil pile will be distributed and leveled over site. The access road built for the pad is under one acre, and hence can stay in place if land owner so desires. | |||
2155629 | 2013-04-09 | No Violations Noted | Inspection conducted on 4/9/13. The lower third of the site needs to be regraded, seeded, and mulched. The ruts located in this area are beginning to turn into gullies. Please provide documentation of the E & S inspections conducted over the last month. | |||
2322366 | 2014-11-13 | No Violations Noted | Inspection conducted of the Newfield Woodland Mgmt Partners 1 1 Well Pad Site covered under the E&S well pad plan for the Newfield Woodland Mgmt Partners 1 1 Well (127-20017). Inspection conducted on 11/13/14. Inspection is to confirm Newfield |
For data sources see[3]