== Well Details ==
 
== Well Details ==
 
{| class="wikitable" width="95%"
 
{| class="wikitable" width="95%"
| Well ID: 42-003-21982
+
| Well ID: 37-003-21982
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.572277, -79.807055 | width=100% | height=100% }}  
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.572277, -79.807055 | width=100% | height=100% }}  
 
|-
 
|-

Revision as of 12:40, 14 June 2014

Well Details

Well ID: 37-003-21982
Loading map...
County: Allegheny
Municipality: Frazer Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 146376
Farm/Lease Name: YUTE UNIT 4H
First Permit Date: 2008-10-03
Last Permit Date: 2009-11-03
Spud Date: 2009-02-03
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 40.572277
Longitude: -79.807055

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1785102 2009-04-16 No Violations Noted The marcellus well is not in production at the time of the inspection. The initial phase of drilling (top hole) appears to be completed. The below grade pit has been properly installed and is maintaining the 2 feet of freeboard. There is no accelerated erosion and sedimentation noted on the access road or well site. It is recommended that the operator seed and mulch the well site and continue to monitor the access road and well site for erosion and sedimentation. Accompanied Greg Higgins for training.
1785668 2009-04-09 No Violations Noted Marcellus Well, verticle to 7105, e/s ok
1803413 2009-06-08 No Violations Noted Drilling was completed on 2/18/09

Well is not in production at this time. Site is being restored at this time and vegetation is starting to grow. The pad and the road have been stabilized with stone and the BMP¿s are in order. At the time of the routine inspection, the operator was encapsulating the pit. Spoke with operator and they do not know when they will be fracing and the Department notified them that they might need an extension.


1894331 2010-06-23 No Violations Noted On June 23rd, 2010 I met with Range Resources E&S Supervisor Jeremy Matinko to discuss the encapsulated drill cuttings on site. Due to expansion of the dril pad the pit would need to be uncovered and the drill cuttings moved. It was decided that when uncovered the previous drill cuttings would be hauled and disposed of offsite. The site was currently under construction. E&S controls were in place according to the most recent ESCGP-1. The access road was in good condition. A site ID and E&S plan were posted on site.
1911499 2010-08-12 No Violations Noted On August 12th, 2010 I conducted a routine inspection of the above site. Frazer township had received 4.41" of rain the previous night. Some gravel from the access road had been washed onto the public roadway. Due to the large amount of rain, various portions of the E&S controls needed repair. No sediment was leaving site however. The super silt fence at the front of the site surrounding the top soil piles was becoming overtaken. Portions of filter sock inside the silt fence were undermined and sediment was piling up. The interceptor channels at the rear of the pad were damaged. Erosion blanket had slid off the fill slope and into the sediment trap. The sediment trap also was filling and needed cleaned. Arrangements were made to meet the operator the next morning and a street sweeper was dispatched to the site.
1911504 2010-08-13 No Violations Noted On August 13th, 2010 I met with Range Resources representatives Jeremy Matinko on site to discuss repairs needed noted in the 8/12/2010 inspection. A street sweeper was on site the night before and had cleaned the public roadway. Silt fence and filter sock repairs were taking place immediately. The other repairs would be scheduled as soon as the soil would become dry enough for heavy equipment to work on.
1913729 2010-08-31 No Violations Noted On August 31th, 2010 I met with Range Resources representative Jeremy Matinko on site to discuss repairs as a result of the storm event noted in the 8/12/2010 inspection. The sediment trap and interceptor channels had been restored to plan specifications. The silt fence had been repaired and other sections have had the sediment piled against it removed. Additional filter sock and rock filters have been added to the site in several locations. The access road was now in good condition.
1917078 2010-09-10 No Violations Noted On September 10th, 2010 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. A wireline rig was set up on the well and crews were setting up to pull the 4-1/2" casing in preparation for the redrill.
1927871 2010-10-25 No Violations Noted MARCELLUS WELL. DRILLED TO 7300' AND CEMENTED BACK TO KOP. PATTERSON RIG IS BEING BUILT. SITE, E&S, AND ACCESS OK.
1930577 2010-11-02 No Violations Noted PATTERSON 325 IS DRILLING THIS HORIZONTAL MARCELLUS WELL. SITE WILL BE EXPANDED FOR FRAC TANKS.
1930583 2010-11-04 No Violations Noted PATTERSON RIG 325 DRILLING HORIZONTAL LEG OF THIS MARCELLUS WELL. KOP @ 5833'. T.D. @ 9850'. CREW PULLING DRILL RODS AND THEN WILL RUN 5 1/2" CASING. SITE, E&S, AND ACCESS, OK.
1931252 2010-11-17 No Violations Noted On November 17th, 2010 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. The redrill had been completed. Construction for the tank pad was completed and frac tanks were being delivered. Crews were on site prepping for the upcoming frac.
1933219 2010-11-16 No Violations Noted MARCELLUS HOIZONTAL WELL. PATTERSON RIG IS GONE. CREW WORKING ON THE WELL HEAD. AREA FOR FRAC TANKS UNDER CONSTRUCTION.
1933225 2010-11-10 No Violations Noted 5" IS CEMENTED. RIG IS BEING DISMANTLED. THE SITE IS BEING PREPARED FOR FRAC.
1934239 2010-11-29 No Violations Noted FRAC TECH ON SITE SETTING UPTO FRAC THIS HORIZONTAL MARCELLUS WELL.

FRAC TANKS ARE SET AND WATER IS SUPPLIED FROM A HYDRANT. SITE, E&S, AND ACCESS, OK.

1947185 2011-01-10 No Violations Noted SITE, E&S, AND ACCESS, OK. MARCELLUS WELL IS BEING FLARED. SITE IS FENCED AND SECURITY IS PRESENT.
1953924 2011-01-18 No Violations Noted WELL IS COMPLETE. THE FLARESTACK HAS BEEN REMOVED.
1958587 2011-02-10 No Violations Noted On February 10th, 2011 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. Some routine maintenance of E&S controls is required in a few areas. The redrill and frac had been completed. No spills/ leaks or accelerated erosion were observed at the time of inspection.
1959388 2011-03-02 No Violations Noted On March 2nd, 2011 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. Some routine maintenance of E&S controls is required in a few areas: silt fence and control blankets along the tank pad. The redrill and frac had been completed. No spills/ leaks or accelerated erosion were observed at the time of inspection. .
1961862 2011-03-18 No Violations Noted On March 18th, 2011 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. 2 frac tanks were left on site. The redrill and frac had been completed, but the well was not yet in production. No spills/ leaks or accelerated erosion were observed at the time of inspection. .
1976478 2011-04-20 No Violations Noted THIS MARCELLUS WELL IS DRILLED AND FRACED, BUT NOT

HOOKED UP FOR PRODUCTION. SITE AND E&S, OK.

1991679 2011-07-08 No Violations Noted WELL IS COMPLETE. SITE AND E&S, OK. ACCESS IS GATED. SITE WILL BE CHANGED FOR MORE WELLS.
1998348 2011-08-04 No Violations Noted WELLCOMPLETE. THE SITE IS BEING REBUILT TO ADD MORE WELLS.

SITE, E&S, AND ACCESS,OK.

2016814 2011-10-24 No Violations Noted WELL IS COMPLETE.

CREWS ARE WORKING ON PRODUCTION EQUIPTMENT.

2018633 2011-11-08 No Violations Noted WELL IS DRILLED AND FRACED.
2027550 2011-12-14 No Violations Noted WELL COMPLETE AND PRODUCING. WELL IS FENCED. E&S OK.
2027590 2011-11-28 No Violations Noted WELL IS COMPLETE AND PRODUCING. WELL IS FENCED.
2035166 2012-01-12 No Violations Noted THIS WELL IS COMPLETE AND HOOKED UP FOR PRODUCTION.
2055003 2012-03-15 No Violations Noted THIS WELL IS COMPLETE AND PRODUCING.

THE WELL IS PROTECTED BY CEMENT BARRIERS.

2074517 2012-06-04 No Violations Noted DRILLING COMPLETE AND WELL IS FRACED. WELL IS HOOKED UP AND PRODUCING.

THE SITE IS IN GOOD SHAPE.

2085868 2012-07-16 No Violations Noted WELL IS PRODUCING. RESTORATION IN PROGRESS.
2097396 2012-08-27 No Violations Noted THIS WELL IS HOOKED UP AND PRODUCING. THE SITE IS RESTORED.
2110934 2012-10-25 No Violations Noted John Ley WQS, SWRO was on site to conduct a restoration inspection. At the time of this inspection, the well sign, E&S plan, well permit and the PPC plan were onsite. The site was gated for security. Drilling had been completed and the well appeared to be equipped for production.

Bmp's installed were functioning according to the E&S plan. No accelerated erosion or sedimentation issues were noted on site or the access road. All the silt socks were removed and the site appeared to be restored. The hillsides had been stabilized and had good growth with at least 70% vegetation.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 322642.0 184.0 0.0 0.0 0.0 0.0
2012-1 461773.93 165.0 0.0 0.0 0.0 0.0
2011-2 583550.0 81.0 10.0 81.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2008-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 FLOWBACK FRACTURING SAND 7.13 Tons LANDFILL 100277 WESTMORELAND WASTE, LLC BELLE VERNON PA
2009-0 DRILLING 3827.0 Bbl OTHER NOT LISTED
2011-1 PRODUCED FLUID 2211.9 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA (NEW CASTLE) NEW CASTLE PA
2011-1 PRODUCED FLUID 1090.48 Bbl REUSE OTHER THAN ROAD SPREADING FRAC WATER REUSE PA