X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-20554"

m
m
Line 1: Line 1:
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable" width="95%"
 
{| class="wikitable" width="95%"
| Well ID: 42-115-20554
+
| Well ID: 37-115-20554
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.682336, -75.660833 | width=100% | height=100% }}  
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.682336, -75.660833 | width=100% | height=100% }}  
 
|-
 
|-

Revision as of 04:12, 15 June 2014

Well Details

Well ID: 37-115-20554
Loading map...
County: Susquehanna
Municipality: Lenox Township
Operator Name: SOUTHWESTERN ENERGY PROD CO
Well Pad ID: 148376
Farm/Lease Name: FROST MASTRI GAS UNIT 5H
First Permit Date: 2011-04-21
Last Permit Date: 2011-04-21
Spud Date: 2011-08-18
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: 2
Latitude: 41.682336
Longitude: -75.660833

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1976509 2011-05-27 No Violations Noted
2002243 2011-09-13 No Violations Noted Falcon Rig 16. Run 14 lb EMW for 15 min on shoe. When drilled out, repeated test. Tests ok. Drillers log on site and up to date. Secondary containment in place and in good condition. Cement reports show good returns on both strings. Currently preparing to skid rig over to 4H.
2011500 2011-10-13 Violation(s) Noted DEP on site 11:15. Desoto Rig 9. Falcon 16 drilled tophole. Currently at 11568'. Proposed TD = 12, 577. Will be cemented to above curve to @ 4000'. Drillers log on site and up to date. Walked site with Company Man. Drilling fluid anddrill cutting on ground near mud storage tanks and solids tanks. Violations cited. 622410
2011500 2011-10-13 Violation(s) Noted DEP on site 11:15. Desoto Rig 9. Falcon 16 drilled tophole. Currently at 11568'. Proposed TD = 12, 577. Will be cemented to above curve to @ 4000'. Drillers log on site and up to date. Walked site with Company Man. Drilling fluid anddrill cutting on ground near mud storage tanks and solids tanks. Violations cited. 622411
2014398 2011-10-24 No Violations Noted DESOTO Rig 9. Follow up inspection on previous violations cited for drill mud on ground and cutting on ground near solids tanks. Operator cleaned up cuttings and mud and expanded secondary containment. Checked cellar. Operator asked to clean well stack and re-inspect cellar for bubbling.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 FRACING FLUID WASTE 80.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) WILLIAMSPORT PA

References