X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-21805"

m
 
m
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable" width="95%"
 
{| class="wikitable" width="95%"
Line 23: Line 24:
 
|-
 
|-
 
|}
 
|}
__TOC__
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 15:49, 17 June 2014

Well Details

Well ID: 37-003-21805
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 2006-09-12
Last Permit Date: 2007-09-12
Spud Date: 2008-02-07
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.212439
Longitude: -79.83526

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 5142.0 334.0 0.0 0.0 0.0 0.0
2012-0 5371.0 335.0 0.0 0.0 0.0 0.0
2011-0 6492.0 334.0 0.0 0.0 0.0 0.0
2010-0 7935.0 365.0 0.0 0.0 0.0 0.0
2009-0 9092.0 334.0 0.0 0.0 0.0 0.0
2008-0 9437.0 306.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2008-0 BRINE 1705.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2009-0 BRINE 38.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA BRINE TRT - JOSEPHINE PLT -INDIANA CO
2010-0 PRODUCED FLUID 90.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2011-0 PRODUCED FLUID 90.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1819909 2009-07-29 No Violations Noted Drilling was completed.

Well appears to be in production at this time. Site is restored and vegetation has achieved 70 % uniform coverage. The access road is in good condition ¿ BMPs in place.

References