X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30312"

m
 
m
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable" width="95%"
 
{| class="wikitable" width="95%"
Line 23: Line 24:
 
|-
 
|-
 
|}
 
|}
__TOC__
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 18:49, 17 June 2014

Well Details

Well ID: 37-005-30312
Loading map...
Operator Name: US ENERGY EXPLORATION CORP
First Permit Date: 2009-04-06
Last Permit Date: 2009-04-06
Spud Date: 2009-08-05
Unconventional: No
Horizontal: No
Violations: 2
Latitude: 40.662581
Longitude: -79.564436

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 516.0 360.0 0.0 0.0 0.0 0.0
2010-0 975.0 360.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1819261 2009-08-11 Violation(s) Noted Site constrcuted, drilling had not commenced at the timre of the inspection. Noted that there was no E&S plan located onsite at the time of the inspection. Observed that the filter fabric fence BMP had been compromised by sediment transport. Sediment had overtopped portions of te fence and had also pushed portions of the fencing over, finally the sections of fence had not been joined properly during installation. 569028
1819261 2009-08-11 Violation(s) Noted Site constrcuted, drilling had not commenced at the timre of the inspection. Noted that there was no E&S plan located onsite at the time of the inspection. Observed that the filter fabric fence BMP had been compromised by sediment transport. Sediment had overtopped portions of te fence and had also pushed portions of the fencing over, finally the sections of fence had not been joined properly during installation. 569028
1819261 2009-08-11 Violation(s) Noted Site constrcuted, drilling had not commenced at the timre of the inspection. Noted that there was no E&S plan located onsite at the time of the inspection. Observed that the filter fabric fence BMP had been compromised by sediment transport. Sediment had overtopped portions of te fence and had also pushed portions of the fencing over, finally the sections of fence had not been joined properly during installation. 569029
1819261 2009-08-11 Violation(s) Noted Site constrcuted, drilling had not commenced at the timre of the inspection. Noted that there was no E&S plan located onsite at the time of the inspection. Observed that the filter fabric fence BMP had been compromised by sediment transport. Sediment had overtopped portions of te fence and had also pushed portions of the fencing over, finally the sections of fence had not been joined properly during installation. 569029
1834724 2009-09-08 No Violations Noted
1834729 2009-10-13 No Violations Noted
1978313 2011-06-03 No Violations Noted Drilling was completed September 2009. Well appeared to be equipped for production and brine tank located onsite at the time of the inspection. Brine tank appeared to be in sound condition. Vegetative cover met the 70% uniform coverage criteria. Observed no accelerated erosion or sedimentation in relation to the access road or well-site.