If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
{| class="wikitable" width="95%" | {| class="wikitable" width="95%" | ||
Line 23: | Line 24: | ||
|- | |- | ||
|} | |} | ||
− | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" |
Well ID: 37-005-30789 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.936041,"lon":-79.61388,"icon":""}]} |
Operator Name: WGM GAS CO INC | |
First Permit Date: 2011-02-16 | |
Last Permit Date: 2011-02-16 | |
Spud Date: 2011-03-31 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.936041 | |
Longitude: -79.61388 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 1129.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 1407.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 822.0 | 210.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2011-0 | DRILLING FLUID WASTE | 440.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1963868 | 2011-04-04 | No Violations Noted | US Energy drilling 8 7/8" hole at 930' of proposed 1026' at time of inspection. Proposed TD = 3000'
Spud in 06:15 04/01/11. Set 54' of 13 3/8" conductor. Proposal calls for setting 1011' of 7" 0.250" wall casing and cementing with 145 sacks of "A" containing 3% cacl2. Met with Operator rep Tim Marshall and Drilling rep Joe Miller. Drilling pit lined and freeboard maintained.
|
|
1965150 | 2011-04-06 | No Violations Noted | US Energy rig shut down at time of inspection. Crew in well control training.
13 3/8" x 7" annulus - cement not visible at surface. Pit lined and freeboard maintained. |
|
1965157 | 2011-04-12 | No Violations Noted | At time of inspection, US Energy tripping out of hole after drilling to 3020' TD.
Information per cement job log: 1011' of 20 lb/ft 0.250" wall 7" casing set in 8 7/8" hole and cemented with 70 sacks of "A" containing 3% cacl2 & 1/4# flake (yield=1.54 cu ft/sk); tailed by 75 sacks of "A" containing 3% cacl2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface realized and bumped plug at 16:00 04-04-11. Drilling rep Joe Miller stated that cement top in 13 3/8" x 7" annulus at approximately 3'. Pit lined and freeboard maintained. |
|
1969142 | 2011-04-20 | No Violations Noted | Drilled, not equipped. Site ID sign and E&S plan located. Pit is on-site / appears to be in sound condition. There are no E&S concerns noted on the well site or access road. | |
1980003 | 2011-06-10 | No Violations Noted | Well appears to be equipped for production. Well tag located. Pit is on-site / appears to be in sound condition. Site has been regraded but not seeded & mulched. There are no E&S concerns noted on the well site or access road. | |
2020527 | 2011-11-18 | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Site had been effectively restored and temporarily stabilized with seed & mulch. Vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. The Department recommends the removal of the silt fencing at the operator's earliest convienence. |