X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-35506"

m
 
m
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable" width="95%"
 
{| class="wikitable" width="95%"
Line 23: Line 24:
 
|-
 
|-
 
|}
 
|}
__TOC__
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 17:22, 18 June 2014

Well Details

Well ID: 37-063-35506
Loading map...
Operator Name: XTO ENERGY INC
First Permit Date: 2007-07-06
Last Permit Date: 2007-07-06
Spud Date: 2007-10-26
Unconventional: No
Horizontal: No
Violations: 1
Latitude: 40.880314
Longitude: -79.160977

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 2884.0 365.0 0.0 0.0 0.0 0.0
2012-0 3250.0 364.0 0.0 0.0 0.0 0.0
2011-0 4175.0 266.0 0.0 0.0 0.0 0.0
2010-0 6067.0 344.0 0.0 0.0 0.0 0.0
2009-0 6920.0 365.0 0.0 0.0 0.0 0.0
2008-0 8991.0 262.0 0.0 0.0 0.0 0.0
2007-0 230.0 365.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2008-0 BRINE 80.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA BRINE TRT - FRANKLIN PLT
2010-0 PRODUCED FLUID 51.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA (NEW CASTLE) NEW CASTLE PA
2010-0 PRODUCED FLUID 7.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310 CLEARFIELD MUNICIPAL SEWAGE TREATMENT PLANT CLEARFIELD PA
2010-0 PRODUCED FLUID 6.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2010-0 PRODUCED FLUID 1.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034 JOHNSTOWN SEWAGE TREATMENT PLANT JOHNSTOWN PA
2010-0 PRODUCED FLUID 8.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2010-0 PRODUCED FLUID 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346 PUNXSUTAWNEY BORO STP PUNXSUTAWNEY PA
2010-0 PRODUCED FLUID 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2013-0 PRODUCED FLUID 33.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1664853 2007-10-31 No Violations Noted DRILLING @ 2940'; PIT, E&S OK.
1802248 2009-05-28 Violation(s) Noted Drilling completed 11/1/07. Well is equipped for production. Tank sound. Well tag in place.

Access road is stable with no signs of accelerated erosion.

Inspection revealed the following deficiencies:

 1)  Well site not restored.  Site was backfilled and graded to contour, but does not appear to have been seeded/mulched.  Site does not have 
      70% uniform, perennial vegetative cover, and is not stabilized in its present condition.  Entire site needs to be seeded/mulched.
564168
1812886 2009-07-13 No Violations Noted Well is equipped for production. Tank sound. Well tag in place.

Access road is stable with no signs of accelerated erosion. Inspection conducted to check on progress of site stabilization. Entire site was seeded and mulched at a 6/23/09 inspection. Emerging vegetation is present on the site, and is nearly at the 70% required. Appears the site should soon be at final stabilization. No signs of accelerated erosion on site. The silt fence that was installed along the down-slope side of the site is properly maintained.

  • Site should continue to be monitored to ensure a minimum of 70% perennial uniform vegetation, and final stabilization is achieved.
1827344 2009-09-10 No Violations Noted Well is equipped for production. Tank sound. Well tag in place.

Access road is stable with no signs of accelerated erosion. Site is stabilized with adequate vegetation. No signs of accelerated erosion on site. Final stabilization achieved. Site restored.

  • With this site being restored and stabilized, the silt fence that was installed along the down-slope side of the site must be removed.

References