X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-20782"

Line 4: Line 4:
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.877986, -75.659719 | width=100% | height=100% }}  
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.877986, -75.659719 | width=100% | height=100% }}  
 
|-
 
|-
| County: [[wikipedia:Susquehanna County, Pennsylvania|Susquehanna]]
+
| County: [[Susquehanna County, Pennsylvania|Susquehanna]]
 
|-
 
|-
| Municipality: [[wikipedia:New Milford Township, Susquehanna County, Pennsylvania|New Milford Township]]
+
| Municipality: [[New Milford Township, Susquehanna County, Pennsylvania|New Milford Township]]
 
|-
 
|-
| Operator Name: [[wikipedia:SOUTHWESTERN ENERGY PROD CO|SOUTHWESTERN ENERGY PROD CO]]
+
| Operator Name: [[SOUTHWESTERN ENERGY PROD CO|SOUTHWESTERN ENERGY PROD CO]]
 
|-
 
|-
 
| Farm/Lease Name: SKELLY 3H
 
| Farm/Lease Name: SKELLY 3H

Revision as of 19:11, 4 May 2014

Well Details

Well ID: 115-20782
Loading map...
County: Susquehanna
Municipality: New Milford Township
Operator Name: SOUTHWESTERN ENERGY PROD CO
Farm/Lease Name: SKELLY 3H
First Permit Date: 2011-12-13
Last Permit Date: 2011-12-13
Spud Date: 2012-02-20
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 41.877986
Longitude: -75.659719

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2051259 2012-03-13 Pending Falcon 17. Drilling ahead. When drilling out 9 5/8" started seeing bubbling on backside of casing. Shoe test and FIT good. DEP notified on 3/12/12. Operator will be installing packoff assembly at surface and will vent gas. Used Halliburton thixotropic cement blend. Indications are that too much retardant was mixed with blend which caused set time to be delayed. Lab results for compressive strenght have not been received yet. Inspection of cellar revealed steady stream of small bubbles on 13 x 9 annulus. 13 3/8" is cemented to surface. No bubbling observed on 20 x 13 3/8" annulus. Request operator to provide laboratory data on cement when received. Operator shall notify DEP when packoff assembly is installed and to continue monitoring cellar for gas.
2051366 2012-03-16 Pending Follow up on cement job on 9 5/8". Bubbling is present on 9 5/8" annulus. Have pack off assembly ordered. Co. Man indicated that cement contractor admittedly used too much retardant during job which aggected set up time. Driller waited on cement at least 24 hrs before drilling out. Cement lab results reprtedly indicated 500 psi compressive strength @ 24 hrs. Swell pacer was installed 50' above 13 3/8" shoe, and a swell packer @ 75' below 13 3/8" shoe. 13 3/8" set at 688' and 9 5/8" set at 1669'. DEP will continue to follow up. Rig has moved off location. Crews on site cleaning up containment.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 DRILLING FLUID WASTE 103.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) WILLIAMSPORT PA
2012-1 DRILL CUTTINGS 660.0 Tons LANDFILL NY STATE #32S11 ALLIED WASTE SYSTEMS NIAGARA FALLS NY
2012-1 DRILL CUTTINGS 117.64 Tons LANDFILL 101247 KEYSTONE SANITARY LANDFILL DUNMORE PA
2012-1 DRILL CUTTINGS 381.06 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH