If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m (Wiki moved page 015-22148 to 42-015-22148) |
(No difference)
|
Well ID: 015-22148 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.803688,"lon":-76.22355,"icon":""}]} |
County: Bradford | |
Municipality: Herrick Township | |
Operator Name: SOUTHWESTERN ENERGY PROD CO | |
Farm/Lease Name: FIELDS 1H | |
First Permit Date: 2012-03-14 | |
Last Permit Date: 2012-03-14 | |
Spud Date: 2012-05-10 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 41.803688 | |
Longitude: -76.22355 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2095591 | 2012-08-06 | No Violations Noted | Cellar dry. Small amount of water between conductor and surface casings, however no visible bubbling. 40 psi on 51/2 | |
2101196 | 2012-09-17 | No Violations Noted | Arrived at the site at 13:05. I approved of an alternative waste management practice (OG-71) for temporary storage an on-site pretreatment system of top-hole water, drilling fluid, hydro-fracturing flow back fluid and production fluid on 9-12-12. Darren Bishop and Frank Kelly of SEPCO were on-site during the inspection. SEPCO was in the process of preparing for flowback procedures. I was informed by Darren Bishop that a test run of filtration has been conducted thus far. Several light towers were observed to be housed on the surface of the ground of the Well Pad and there were a few areas of compromised liner integrity noted during the inspection. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 708533.0 | 105.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | DRILLING FLUID WASTE | 497.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2012-2 | FLOWBACK FRACTURING SAND | 196.99 | Tons | LANDFILL | 101247 | KEYSTONE SANITARY LANDFILL | DUNMORE | PA |
2012-1 | DRILL CUTTINGS | 551.9 | Tons | LANDFILL | 101247 | KEYSTONE SANITARY LANDFILL | DUNMORE | PA |
2012-1 | DRILL CUTTINGS | 295.88 | Tons | LANDFILL | THR029 | TUNNELL HILL RECLAMATION LANDFILL | NEWLEXINGTON | OH |