X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-23173"

m (Maintenance script moved page 42-125-23173 to 37-125-23173: -i0)
m
Line 32: Line 32:
 
|}
 
|}
 
__TOC__
 
__TOC__
== Well Inspection Data ==
+
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | INSPECTION ID
 
!scope="col" | INSPECTION ID

Revision as of 09:37, 9 June 2014

Well Details

Well ID: 42-125-23173
Loading map...
County: Washington
Municipality: Independence Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Farm/Lease Name: BROWNLEE 1H
First Permit Date: 2008-05-20
Last Permit Date: 2008-05-20
Spud Date: 2008-08-18
Unconventional: Yes
Horizontal: No
Producing: No
Violations: 6
Latitude: 40.226357
Longitude: -80.516472

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1731843 2008-08-27 No Violations Noted Complaint about stream being dried up - no hard evidence that Range caused situation - gave them PPOP
1853132 2009-12-18 No Violations Noted Inactive status applied for on this well. Cellar full of water and covered. Appears well is not completed beyond the vertical bore as stated in completion report. No open pit and site partially reclaimed.
1955612 2011-03-02 Violation(s) Noted I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached. 606148
1955612 2011-03-02 Violation(s) Noted I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached. 606149
1955612 2011-03-02 Violation(s) Noted I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached. 606150
1955612 2011-03-02 Violation(s) Noted I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached. 606151
1955612 2011-03-02 Violation(s) Noted I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached. 606152
1955612 2011-03-02 Violation(s) Noted I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached. 606153
2011277 2011-10-07 No Violations Noted

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2008-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2008-0 FRACKING FLUID 5866.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT CHARLEROI BORO STP
2008-0 DRILLING 7266.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT MON VALLEY STP
2008-0 FRACKING FLUID 5866.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT MON VALLEY STP
2008-0 DRILLING 7266.0 Bbl OTHER NOT LISTED
2009-0 BRINE 208.0 Bbl OTHER NOT LISTED
2009-0 DRILLING 1064.0 Bbl OTHER NOT LISTED
2009-0 FRACKING FLUID 150.0 Bbl OTHER NOT LISTED

References