If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
== Well Details == | == Well Details == | ||
{| class="wikitable" width="95%" | {| class="wikitable" width="95%" | ||
− | | Well ID: | + | | Well ID: 37-115-20690 |
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.847913, -75.757122 | width=100% | height=100% }} | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.847913, -75.757122 | width=100% | height=100% }} | ||
|- | |- |
Well ID: 37-115-20690 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.847913,"lon":-75.757122,"icon":""}]} |
County: Susquehanna | |
Municipality: New Milford Township | |
Operator Name: SOUTHWESTERN ENERGY PROD CO | |
Well Pad ID: 147772 | |
Farm/Lease Name: BARK EM SQUIRREL 5H | |
First Permit Date: 2011-10-19 | |
Last Permit Date: 2011-10-19 | |
Spud Date: 2011-11-21 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 41.847913 | |
Longitude: -75.757122 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2022405 | 2011-11-22 | No Violations Noted | DEP on site 14:00. Minichi spud rig on site. In process of drilling conductor. Using concentric rig to set 20 " conductors. 6H conductor already set at 48'. Drillers log on site and up to date. No violations observed. Site ID sign in place. Permit on site. | |
2130817 | 2013-01-15 | No Violations Noted |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 109737.0 | 29.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | FRACING FLUID WASTE | 127.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2012-2 | FLOWBACK FRACTURING SAND | 48.98 | Tons | LANDFILL | 101247 | KEYSTONE SANITARY LANDFILL | DUNMORE | PA |
2012-1 | DRILL CUTTINGS | 806.47 | Tons | LANDFILL | THR029 | TUNNELL HILL RECLAMATION LANDFILL | NEWLEXINGTON | OH |