Well ID: 37-007-20307 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.747527,"lon":-80.4115,"icon":""}]} |
County: Beaver | |
Municipality: South Beaver Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Farm/Lease Name: ROLLING ACRES 8H | |
First Permit Date: 2011-06-03 | |
Last Permit Date: 2011-06-03 | |
Spud Date: 2011-08-16 | |
Unconventional: No | |
Horizontal: No | |
Producing: Yes | |
Violations: None | |
Latitude: 40.747527 | |
Longitude: -80.4115 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1991743 | 2011-07-12 | No Violations Noted | 100' OF CONDUCTOR IS CEMENTED. TOP OF 20" IS COVERD BY A STEEL PLATE.
SITE, E&S, AND ACCESS, IS OK. |
|
1992139 | 2011-07-12 | No Violations Noted | On July 12th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. Pad construction was complete. The access road was in good condition. Site ID was posted. E&S controls were in place according to the ESCGP-1. Some growth was coming in on the slopes. No spills/ leaks or accelerated erosion were observed at the time of inspection. | |
1998389 | 2011-08-03 | No Violations Noted | CONDUCTOR IS IN AND CEMENTED. A SOUND WALL HAS BEEN BUILT AROUND PART OF THE SITE.
SITE, E&S, AND ACCESS, OK. |
|
2001716 | 2011-08-18 | No Violations Noted | 13 3/8" CASING CEMENTED TO SURFACE.
BOP TEST DONE 8/18/11. E&S OK. |
|
2003196 | 2011-09-13 | No Violations Noted | DRILLING AT 7164'. UTICA WELL. SITE OK. | |
2016807 | 2011-10-25 | No Violations Noted | DRILLING COMPLETE. RIG IS GONE. WELL HEAD EQUIPTMENT IS BEING INSTALLED. | |
2018471 | 2011-10-06 | No Violations Noted | DRILLING HORIZONTAL LEG @ 1346' WITH 8.5" BIT. | |
2018475 | 2011-10-18 | No Violations Noted | DRILLING COMPLETE. RIG IS BEING DISMANTLED. | |
2018691 | 2011-11-02 | No Violations Noted | RUNNING TUBING. FIRST ZONE WILL THEN BE FRACED. | |
2027608 | 2011-11-29 | No Violations Noted | WELL HAS BEEN FRACED. SERVICE RIG CLEANING OUT THE WELL. | |
2027615 | 2011-11-22 | No Violations Noted | DRILLING COMPLETE AND WELL IS FRACED. FRAC EQUIPTMENT MOVING. | |
1991743 | 2011-07-12 | No Violations Noted | 100' OF CONDUCTOR IS CEMENTED. TOP OF 20" IS COVERD BY A STEEL PLATE.
SITE, E&S, AND ACCESS, IS OK. |
|
1992139 | 2011-07-12 | No Violations Noted | On July 12th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. Pad construction was complete. The access road was in good condition. Site ID was posted. E&S controls were in place according to the ESCGP-1. Some growth was coming in on the slopes. No spills/ leaks or accelerated erosion were observed at the time of inspection. | |
1998389 | 2011-08-03 | No Violations Noted | CONDUCTOR IS IN AND CEMENTED. A SOUND WALL HAS BEEN BUILT AROUND PART OF THE SITE.
SITE, E&S, AND ACCESS, OK. |
|
2001716 | 2011-08-18 | No Violations Noted | 13 3/8" CASING CEMENTED TO SURFACE.
BOP TEST DONE 8/18/11. E&S OK. |
|
2003196 | 2011-09-13 | No Violations Noted | DRILLING AT 7164'. UTICA WELL. SITE OK. | |
2016807 | 2011-10-25 | No Violations Noted | DRILLING COMPLETE. RIG IS GONE. WELL HEAD EQUIPTMENT IS BEING INSTALLED. | |
2018471 | 2011-10-06 | No Violations Noted | DRILLING HORIZONTAL LEG @ 1346' WITH 8.5" BIT. | |
2018475 | 2011-10-18 | No Violations Noted | DRILLING COMPLETE. RIG IS BEING DISMANTLED. | |
2018691 | 2011-11-02 | No Violations Noted | RUNNING TUBING. FIRST ZONE WILL THEN BE FRACED. | |
2027608 | 2011-11-29 | No Violations Noted | WELL HAS BEEN FRACED. SERVICE RIG CLEANING OUT THE WELL. | |
2027615 | 2011-11-22 | No Violations Noted | DRILLING COMPLETE AND WELL IS FRACED. FRAC EQUIPTMENT MOVING. | |
2052645 | 2012-03-08 | No Violations Noted | THIS WELL IS COMPLETE. PRODUCTION EQUIPTMENT IS BEING INSTALLED. | |
2116529 | 2012-10-16 | No Violations Noted | WELL COMPLETE. TANKS AND EQUIPTMENT SET.
ACCESS AND PAD ARE GATED AND LOCKED. |
|
2052645 | 2012-03-08 | No Violations Noted | THIS WELL IS COMPLETE. PRODUCTION EQUIPTMENT IS BEING INSTALLED. | |
2116529 | 2012-10-16 | No Violations Noted | WELL COMPLETE. TANKS AND EQUIPTMENT SET.
ACCESS AND PAD ARE GATED AND LOCKED. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 300.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-1 | PRODUCED FLUID | 255.0 | Bbl | INJECTION DISPOSAL WELL | 34-37-133-21076 | MYERS #1 UNIT (SALTY'S DISPOSAL) | ATWATER | OH |
2012-1 | PRODUCED FLUID | 110.0 | Bbl | INJECTION DISPOSAL WELL | 968 1 | R.O.J.#1-A (HUFFMAN-BOWERS, INC.) | CHESIRE | OH |
2012-1 | PRODUCED FLUID | 690.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING |