X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28138"

m
m
Line 1: Line 1:
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28138
 
| Well ID: 37-129-28138
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.149177, -79.350477 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.149177, -79.350477 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
 
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]

Revision as of 11:44, 29 June 2014

Well Details

Well ID: 37-129-28138
Loading map...
County: Westmoreland
Municipality: Donegal Township
Operator Name: WPX ENERGY APPALACHIA LLC
Well Pad ID: 149187
Farm/Lease Name: RIAL UNIT 1-1
First Permit Date: 2009-12-17
Last Permit Date: 2009-12-17
Spud Date: 2009-12-29
Unconventional: Yes
Horizontal: No
Producing: Yes
Violations: 1
Latitude: 40.149177
Longitude: -79.350477

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1863366 2009-12-30 No Violations Noted MARCELLUS

NORTHEAST RIG 3 DRILLING AHEAD. FLOW LINE SECURE, PIT FENCED, LOG BOOK AND E&S PLAN WERE PRODUCED UPON REQUEST

1854277 2010-01-07 No Violations Noted Well has been spudded and the site is currently being prepared for the rig to move on site.

Access road is in good condition BMPs are in place and functioning properly. All E&S controls are in place and functioning properly.

1858602 2010-01-25 Violation(s) Noted 580118
1858602 2010-01-25 Violation(s) Noted 580118
1863359 2010-01-26 No Violations Noted MARCELLUS

HWD RIG 3 MUDDING UP, PART OF SHAKER ASSEMBLY IS BEING USED FOR SOMETHING ELSE. CM HAS ROUGHNECKS RIGGING UP A SLIDE TO CONNECT SHAKERS TO PIT

1863364 2010-02-16 No Violations Noted MARCELLUS

HWD RIG 3 STACKED OUT. NOBODY ONSITE, EVERYTHING LOOKS OK

1871915 2010-03-24 No Violations Noted The Department conducted an inspection in response to the violations noted on 1/25/10. Specifically, E&S violations were written for filter fabric fence down, overwhelmed controls, and improperly functioning controls. All the violations have been abated.

Access road and BMPs are in place and functioning properly. All E&S controls are in place and functioning properly. The drill pit is going to have a ditch dug to intercept water that was running into it.

1894953 2010-06-23 No Violations Noted MARCELLUS PITS EMPTY,WELL NOT PRODUCING,SITE NOT RESTORED, NO EQUIPMENT ONSITE.
1916493 2010-08-15 No Violations Noted WELL CAPPED, PIT FENCED, RIG GONE, SITE CLEAN
1982094 2011-06-03 No Violations Noted Site visit was for a routine inspection. Site is permitted to be reconstructed and redrilled.

Well currently on site appears to be drilled but not completed. Site was previous owned by Longfellow Energy and now is owned by Williams. Pit is still in place with cuttings and fluid. Impoundment has water, no freeboard issues. Drilling is reported as completed on 2-4-10. No attempts at restoration have been attempted. Erosion of the site is taking place on the north corner of the site. Sediment is being contained by sed trap and vegetation. No violations noted at this time.

2016811 2011-11-03 No Violations Noted Site visit was due to spud notification.

Rig on site drilling top hole. HRI was actively building fresh water storage impoundment. Toes of slope had been hydroseeded early in the morning. BMPs in place and working properly. Pits dug but not yet lined. No violations noted.

2024898 2011-11-23 No Violations Noted HORIZONTAL MARCELLUS

PATTERSON RIG 480 DRILLING ON WILLIAMS PAD. CONDUCTOR NOT SET. E&S, PITS, AND HOUSE KEEPING GOOD

2026133 2011-12-12 No Violations Noted Site visit was due to spud notification.

Patterson-UTI Rig 480 was on site. Jack Deuitt and Dave Sheffield were the company men. Impoundment construction was complete. Site pad was rutted and very muddy. Company men stated that new stone would be installed after rig skid. BMPs were in place. Drill pit was installed and sound. One side of pit was near capacity (but within freeboard limits) with fluid. Company men were notified. No violations noted at this time.

2033866 2012-01-13 No Violations Noted
2043105 2012-02-10 No Violations Noted Site visit was part of routine inspection.

Rig had completed drilling and was removed from site. Pits were being dewatered and were scheduled fro removeal early next week. Access road and site were stable. E&S controls were in place and functioning properly. No violations noted at this time.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

References