X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-36978"

m
m
Line 1: Line 1:
 
__TOC__
 
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-36978
 
| Well ID: 37-063-36978
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.705722, -79.062294 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.705722, -79.062294 | width=100% | height=100% }}  
 
|-
 
|-
 
| Operator Name: [[WILMOTH INTERESTS INC]]
 
| Operator Name: [[WILMOTH INTERESTS INC]]

Revision as of 20:16, 28 June 2014

Well Details

Well ID: 37-063-36978
Loading map...
Operator Name: WILMOTH INTERESTS INC
First Permit Date: 2010-11-08
Last Permit Date: 2010-11-08
Spud Date: 2010-12-17
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.705722
Longitude: -79.062294

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 10.0 2.0 0.0 0.0 0.0 0.0
2012-0 92.0 6.0 0.0 0.0 0.0 0.0
2011-0 1254.0 135.0 0.0 0.0 0.0 0.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-0 PRODUCED FLUID 465.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1937975 2010-12-15 No Violations Noted
1940115 2010-12-29 No Violations Noted
1940351 2010-12-29 No Violations Noted Site ID sign in place. E&S plan on site. Well spudded 12/17/10. Not equipped for production (well head only).

Access road was stable, with no signs of accelerated erosion. Access road entrance was rocked. Site was stable, with no signs of accelerated erosion leaving site. BMP's were in place in accordance with E&S plan. Drill pit appeared sound, with adequate freeboard, and functional liner. No E&S issues found. No violations found.

References