X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-015-22148"

(Created page with "== Well Details == {{015-22148-Details}} __TOC__ == Well Inspection Data == {{015-22148-inspection}} == Production Data == {{015-22148-production}} == Waste Data == {{015-2214...")
 
Line 1: Line 1:
 
== Well Details ==
 
== Well Details ==
{{015-22148-Details}}
+
{| class="wikitable" width="95%"
 +
| Well ID: 015-22148
 +
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.803688, -76.22355 | width=100% | height=100% }}
 +
|-
 +
| County: [[Bradford County, Pennsylvania|Bradford]]
 +
|-
 +
| Municipality: [[Herrick Township, Bradford County, Pennsylvania|Herrick Township]]
 +
|-
 +
| Operator Name: [[SOUTHWESTERN ENERGY PROD CO]]
 +
|-
 +
| Farm/Lease Name: FIELDS 1H
 +
|-
 +
| First Permit Date: 2012-03-14
 +
|-
 +
| Last Permit Date: 2012-03-14
 +
|-
 +
| Spud Date: 2012-05-10
 +
|-
 +
| Unconventional: Yes
 +
|-
 +
| Horizontal: Yes
 +
|-
 +
| Producing: Yes
 +
|-
 +
| Violations: None
 +
|-
 +
| Latitude: 41.803688
 +
|-
 +
| Longitude: -76.22355
 +
|-
 +
|}
 
__TOC__
 
__TOC__
 
== Well Inspection Data ==
 
== Well Inspection Data ==
{{015-22148-inspection}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
|-
 +
| 2095591
 +
| 2012-08-06
 +
| No Violations Noted
 +
| Cellar dry.  Small amount of water between conductor and surface casings, however no visible bubbling.  40 psi on 51/2
 +
|
 +
|-
 +
|-
 +
| 2101196
 +
| 2012-09-17
 +
| No Violations Noted
 +
| Arrived at the site at 13:05. I approved of an alternative waste management practice (OG-71) for temporary storage an on-site pretreatment system of top-hole water, drilling fluid, hydro-fracturing flow back fluid and production fluid on 9-12-12. Darren Bishop and Frank Kelly of SEPCO were on-site during the inspection. SEPCO was in the process of preparing for flowback procedures.  I was informed by Darren Bishop that a test run of filtration has been conducted thus far.  Several light towers were observed to be housed on the surface of the ground of the Well Pad and there were a few areas of compromised liner integrity noted during the inspection.
 +
|
 +
|-
 +
|}
 
== Production Data ==
 
== Production Data ==
{{015-22148-production}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | GAS QUANTITY
 +
!scope="col" | GAS PRODUCTION DAYS
 +
!scope="col" | CONDENSATE QUANTITY
 +
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2012-2
 +
| style="text-align:right;" | 708533.0
 +
| style="text-align:right;" | 105.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2012-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|}
 
== Waste Data ==
 
== Waste Data ==
{{015-22148-waste}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | TYPE
 +
!scope="col" | QUANTITY
 +
!scope="col" | UNITS
 +
!scope="col" | DISPOSAL METHOD
 +
!scope="col" | WASTE FACILITY PERMIT ID
 +
!scope="col" | WASTE FACILITY NAME
 +
!scope="col" | FACILITY CITY
 +
!scope="col" | FACILITY STATE
 +
|-
 +
| 2012-2
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 497.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR119
 +
| EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT)
 +
| WILLIAMSPORT
 +
| PA
 +
|-
 +
|-
 +
| 2012-2
 +
| FLOWBACK FRACTURING SAND
 +
| style="text-align:right;" | 196.99
 +
| Tons
 +
| LANDFILL
 +
| 101247
 +
| KEYSTONE SANITARY LANDFILL
 +
| DUNMORE
 +
| PA
 +
|-
 +
|-
 +
| 2012-1
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 551.9
 +
| Tons
 +
| LANDFILL
 +
| 101247
 +
| KEYSTONE SANITARY LANDFILL
 +
| DUNMORE
 +
| PA
 +
|-
 +
|-
 +
| 2012-1
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 295.88
 +
| Tons
 +
| LANDFILL
 +
| THR029
 +
| TUNNELL HILL RECLAMATION LANDFILL
 +
| NEWLEXINGTON
 +
| OH
 +
|-
 +
|}
 
__NOEDITSECTION__
 
__NOEDITSECTION__

Revision as of 15:55, 30 April 2014

Well Details

Well ID: 015-22148
Loading map...
County: Bradford
Municipality: Herrick Township
Operator Name: SOUTHWESTERN ENERGY PROD CO
Farm/Lease Name: FIELDS 1H
First Permit Date: 2012-03-14
Last Permit Date: 2012-03-14
Spud Date: 2012-05-10
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 41.803688
Longitude: -76.22355

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2095591 2012-08-06 No Violations Noted Cellar dry. Small amount of water between conductor and surface casings, however no visible bubbling. 40 psi on 51/2
2101196 2012-09-17 No Violations Noted Arrived at the site at 13:05. I approved of an alternative waste management practice (OG-71) for temporary storage an on-site pretreatment system of top-hole water, drilling fluid, hydro-fracturing flow back fluid and production fluid on 9-12-12. Darren Bishop and Frank Kelly of SEPCO were on-site during the inspection. SEPCO was in the process of preparing for flowback procedures. I was informed by Darren Bishop that a test run of filtration has been conducted thus far. Several light towers were observed to be housed on the surface of the ground of the Well Pad and there were a few areas of compromised liner integrity noted during the inspection.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 708533.0 105.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 DRILLING FLUID WASTE 497.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) WILLIAMSPORT PA
2012-2 FLOWBACK FRACTURING SAND 196.99 Tons LANDFILL 101247 KEYSTONE SANITARY LANDFILL DUNMORE PA
2012-1 DRILL CUTTINGS 551.9 Tons LANDFILL 101247 KEYSTONE SANITARY LANDFILL DUNMORE PA
2012-1 DRILL CUTTINGS 295.88 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH