If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
(Created page with "== Well Details == {{033-26852-Details}} __TOC__ == Well Inspection Data == {{033-26852-inspection}} == Production Data == {{033-26852-production}} == Waste Data == {{033-2685...") |
|||
Line 1: | Line 1: | ||
== Well Details == | == Well Details == | ||
− | { | + | {| class="wikitable" width="95%" |
+ | | Well ID: 033-26852 | ||
+ | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.043638, -78.077138 | width=100% | height=100% }} | ||
+ | |- | ||
+ | | County: [[Clearfield County, Pennsylvania|Clearfield]] | ||
+ | |- | ||
+ | | Municipality: [[Cooper Township, Clearfield County, Pennsylvania|Cooper Township]] | ||
+ | |- | ||
+ | | Operator Name: [[WPX ENERGY APPALACHIA LLC]] | ||
+ | |- | ||
+ | | First Permit Date: 2009-09-15 | ||
+ | |- | ||
+ | | Last Permit Date: 2009-09-15 | ||
+ | |- | ||
+ | | Spud Date: None | ||
+ | |- | ||
+ | | Unconventional: Yes | ||
+ | |- | ||
+ | | Horizontal: Yes | ||
+ | |- | ||
+ | | Violations: None | ||
+ | |- | ||
+ | | Latitude: 41.043638 | ||
+ | |- | ||
+ | | Longitude: -78.077138 | ||
+ | |- | ||
+ | |} | ||
__TOC__ | __TOC__ | ||
== Well Inspection Data == | == Well Inspection Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | INSPECTION ID | ||
+ | !scope="col" | DATE | ||
+ | !scope="col" | DESCRIPTION | ||
+ | !scope="col" | COMMENT | ||
+ | !scope="col" | VIOLATION ID | ||
+ | |- | ||
+ | | 1851310 | ||
+ | | 2009-12-15 | ||
+ | | De minimus Violations Noted | ||
+ | | -inspection conducted with WQS Sam Jones. Well has been spud. conductor pipe set, but not actively being drilled at this time. Alder Run Land LP #3H currently being drilled. All issues found on-site will be in inspection report for that well. | ||
+ | -Site ID sign does not contain well permit number for the #4H well which is supposed to be posted prior to commencement of drilling. | ||
+ | -E&S plan for this well is posted at entrance to well. Some minor modifications are apparent on E&S plan. Extra impoundment was not built, soil stockpile has been relocated. These will need to be properly addressed by engineer and signed off by appropriate DEP personel. | ||
+ | |||
+ | | | ||
+ | |- | ||
+ | |} | ||
== Production Data == | == Production Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | GAS QUANTITY | ||
+ | !scope="col" | GAS PRODUCTION DAYS | ||
+ | !scope="col" | CONDENSATE QUANTITY | ||
+ | !scope="col" | CONDENSATE PRODUCTION DAYS | ||
+ | !scope="col" | OIL QUANTITY | ||
+ | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-3 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2009-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
== Waste Data == | == Waste Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | TYPE | ||
+ | !scope="col" | QUANTITY | ||
+ | !scope="col" | UNITS | ||
+ | !scope="col" | DISPOSAL METHOD | ||
+ | !scope="col" | WASTE FACILITY PERMIT ID | ||
+ | !scope="col" | WASTE FACILITY NAME | ||
+ | !scope="col" | FACILITY CITY | ||
+ | !scope="col" | FACILITY STATE | ||
+ | |} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ |
Well ID: 033-26852 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.043638,"lon":-78.077138,"icon":""}]} |
County: Clearfield | |
Municipality: Cooper Township | |
Operator Name: WPX ENERGY APPALACHIA LLC | |
First Permit Date: 2009-09-15 | |
Last Permit Date: 2009-09-15 | |
Spud Date: None | |
Unconventional: Yes | |
Horizontal: Yes | |
Violations: None | |
Latitude: 41.043638 | |
Longitude: -78.077138 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1851310 | 2009-12-15 | De minimus Violations Noted | -inspection conducted with WQS Sam Jones. Well has been spud. conductor pipe set, but not actively being drilled at this time. Alder Run Land LP #3H currently being drilled. All issues found on-site will be in inspection report for that well.
-Site ID sign does not contain well permit number for the #4H well which is supposed to be posted prior to commencement of drilling. -E&S plan for this well is posted at entrance to well. Some minor modifications are apparent on E&S plan. Extra impoundment was not built, soil stockpile has been relocated. These will need to be properly addressed by engineer and signed off by appropriate DEP personel. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|