X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28594"

(Created page with "== Well Details == {{129-28594-Details}} __TOC__ == Well Inspection Data == {{129-28594-inspection}} == Production Data == {{129-28594-production}} == Waste Data == {{129-2859...")
 
Line 1: Line 1:
 
== Well Details ==
 
== Well Details ==
{{129-28594-Details}}
+
{| class="wikitable" width="95%"
 +
| Well ID: 129-28594
 +
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.525841, -79.67498 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[Upper Burrell Township, Westmoreland County, Pennsylvania|Upper Burrell Township]]
 +
|-
 +
| Operator Name: [[PENNECO OIL CO INC]]
 +
|-
 +
| First Permit Date: 2011-05-18
 +
|-
 +
| Last Permit Date: 2011-05-18
 +
|-
 +
| Spud Date: 2011-07-18
 +
|-
 +
| Unconventional: No
 +
|-
 +
| Horizontal: Yes
 +
|-
 +
| Violations: None
 +
|-
 +
| Latitude: 40.525841
 +
|-
 +
| Longitude: -79.67498
 +
|-
 +
|}
 
__TOC__
 
__TOC__
 
== Well Inspection Data ==
 
== Well Inspection Data ==
{{129-28594-inspection}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
|-
 +
| 1989944
 +
| 2011-07-20
 +
| No Violations Noted
 +
| US Energy Rig #4 RD20 circulating hole (hose repair required) at time of inspection.  24" hole at 355'.  Well spud in 19:00 07-18-11. 
 +
Pit lined and freeboard maintained.
 +
 
 +
|
 +
|-
 +
|-
 +
| 1991920
 +
| 2011-07-28
 +
| No Violations Noted
 +
| Rig is on-site.  Drilling in progress.  Site ID sign and E&S plan located along the access road.  Pit appears to be in sound condition.  There are no signs of erosion or sedimentation.
 +
|
 +
|-
 +
|-
 +
| 1993376
 +
| 2011-08-03
 +
| No Violations Noted
 +
| Drilling was ongoing at the time of the inspection.  Drill pits located onsite.  Pits contained drill cuttings and fluids.  Pits had more than the required two feet of lined freeboard.  E&S controls had been implemented as outlined in the E&S plan.  Operator should continue to monitor the erosion controls to insure their continued functionality until well development activities are completed.
 +
|
 +
|-
 +
|-
 +
| 1996855
 +
| 2011-07-27
 +
| No Violations Noted
 +
| US Energy Rig#4 RD20 drilling 12 3/8" hole at 1524' at time of inspection.  Pit lined and freeboard maintained.
 +
|
 +
|-
 +
|-
 +
| 1996860
 +
| 2011-08-02
 +
| No Violations Noted
 +
| US Energy Rig#4 RD20 tripping out of hole at time of inspection.  Pit lined and freeboard maintained.
 +
|
 +
|-
 +
|-
 +
| 1996871
 +
| 2011-08-04
 +
| No Violations Noted
 +
| US Energy Rig#4 RD20 tripping out of 7 7/8" hole at time of inspection.  7 7/8" hole at 3365' TVD.  Pit lined and freeboard maintained.
 +
|
 +
|-
 +
|-
 +
| 1996886
 +
| 2011-08-08
 +
| No Violations Noted
 +
| Well shut in on 9 5/8" x 2" swage.  Pit lined and freeboard maintained.
 +
Met with Operator reps B. Carnahan and A. Birch to discuss well casing and cement including permanent venting of 13 3/8" x 9 5/8" annulus.
 +
Follow up meeting scheduled for 08-15-11 with Operator reps M. Jacobs, B. Wallace, and A. Birch and Department reps D. Stivanson and D. Catalano.
 +
 
 +
|
 +
|-
 +
|-
 +
| 2000226
 +
| 2011-08-24
 +
| No Violations Noted
 +
| US Energy Rig#8 Speedstar building curve (7 7/8" hole) at 3061' at time of inspection.  Pit lined and freeboard maintained.
 +
Met with Operator rep W. Riggle.
 +
 
 +
|
 +
|-
 +
|-
 +
| 2001428
 +
| 2011-09-06
 +
| No Violations Noted
 +
| Drilling appeared to have been completed.  Two below grade pits located onsite and both have more than the required two feet of lined freeboard.  There was no accelerated erosion or sedimentation observed in relation to the access road or well-site.
 +
|
 +
|-
 +
|-
 +
| 2013315
 +
| 2011-10-18
 +
| No Violations Noted
 +
| Multi Production Systems service rig swabbing oil well (post frac) at time of inspection.  Pits lined and freeboard maintained.
 +
|
 +
|-
 +
|-
 +
| 2038105
 +
| 2012-01-25
 +
| No Violations Noted
 +
| Drilling had been completed, well appeared to be equipped for production.  Above ground tanks located onsite and they appeared to be in sound condition.  The diked area around the tanks contained no fluids.  A second drill pit had been constructed onsite.  The second pit had been properly lined and the contents of the first drill pit had been moved to the second pit.  Second pit had more than the required two feet of lined freeboard.  Phone conversation with Penneco confirmed that this was so that the first pit may be relined and reused when drilling the McCrady 5H well.  All access road and site erosion controls were functioning properly and there was no observed accelerated erosion or sedimenation in relation to either the access road or well-site.
 +
|
 +
|-
 +
|-
 +
| 2044963
 +
| 2012-02-23
 +
| No Violations Noted
 +
|
 +
|
 +
|-
 +
|-
 +
| 2069611
 +
| 2012-05-21
 +
| No Violations Noted
 +
| At the time of inspection the well appears to drilled and equipped for production.  The brine tank, pump jack, and well apparatus appear to be in sound condition.  No accelerated erosion observed in relation to the access road or well pad area at the time of inspection.
 +
|
 +
|-
 +
|}
 
== Production Data ==
 
== Production Data ==
{{129-28594-production}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | GAS QUANTITY
 +
!scope="col" | GAS PRODUCTION DAYS
 +
!scope="col" | CONDENSATE QUANTITY
 +
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 3882.0
 +
| style="text-align:right;" | 274.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 7148.03
 +
| style="text-align:right;" | 274.0
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|}
 
== Waste Data ==
 
== Waste Data ==
{{129-28594-waste}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | TYPE
 +
!scope="col" | QUANTITY
 +
!scope="col" | UNITS
 +
!scope="col" | DISPOSAL METHOD
 +
!scope="col" | WASTE FACILITY PERMIT ID
 +
!scope="col" | WASTE FACILITY NAME
 +
!scope="col" | FACILITY CITY
 +
!scope="col" | FACILITY STATE
 +
|-
 +
| 2012-0
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 1070.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 +
| FRANKLIN
 +
| PA
 +
|-
 +
|-
 +
| 2012-0
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 240.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 +
| FRANKLIN
 +
| PA
 +
|-
 +
|-
 +
| 2012-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 1003.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 +
| FRANKLIN
 +
| PA
 +
|-
 +
|-
 +
| 2012-0
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 320.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
| TUNNELTON LIQUIDS COMPANY
 +
| SALTSBURG
 +
| PA
 +
|-
 +
|-
 +
| 2011-0
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 240.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 +
| FRANKLIN
 +
| PA
 +
|-
 +
|-
 +
| 2011-0
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 2385.71
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 +
| FRANKLIN
 +
| PA
 +
|-
 +
|-
 +
| 2011-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 160.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 +
| FRANKLIN
 +
| PA
 +
|-
 +
|-
 +
| 2011-0
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 4010.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
| TUNNELTON LIQUIDS COMPANY
 +
| SALTSBURG
 +
| PA
 +
|-
 +
|}
 
__NOEDITSECTION__
 
__NOEDITSECTION__

Revision as of 18:07, 30 April 2014

Well Details

Well ID: 129-28594
Loading map...
County: Westmoreland
Municipality: Upper Burrell Township
Operator Name: PENNECO OIL CO INC
First Permit Date: 2011-05-18
Last Permit Date: 2011-05-18
Spud Date: 2011-07-18
Unconventional: No
Horizontal: Yes
Violations: None
Latitude: 40.525841
Longitude: -79.67498

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1989944 2011-07-20 No Violations Noted US Energy Rig #4 RD20 circulating hole (hose repair required) at time of inspection. 24" hole at 355'. Well spud in 19:00 07-18-11.

Pit lined and freeboard maintained.

1991920 2011-07-28 No Violations Noted Rig is on-site. Drilling in progress. Site ID sign and E&S plan located along the access road. Pit appears to be in sound condition. There are no signs of erosion or sedimentation.
1993376 2011-08-03 No Violations Noted Drilling was ongoing at the time of the inspection. Drill pits located onsite. Pits contained drill cuttings and fluids. Pits had more than the required two feet of lined freeboard. E&S controls had been implemented as outlined in the E&S plan. Operator should continue to monitor the erosion controls to insure their continued functionality until well development activities are completed.
1996855 2011-07-27 No Violations Noted US Energy Rig#4 RD20 drilling 12 3/8" hole at 1524' at time of inspection. Pit lined and freeboard maintained.
1996860 2011-08-02 No Violations Noted US Energy Rig#4 RD20 tripping out of hole at time of inspection. Pit lined and freeboard maintained.
1996871 2011-08-04 No Violations Noted US Energy Rig#4 RD20 tripping out of 7 7/8" hole at time of inspection. 7 7/8" hole at 3365' TVD. Pit lined and freeboard maintained.
1996886 2011-08-08 No Violations Noted Well shut in on 9 5/8" x 2" swage. Pit lined and freeboard maintained.

Met with Operator reps B. Carnahan and A. Birch to discuss well casing and cement including permanent venting of 13 3/8" x 9 5/8" annulus. Follow up meeting scheduled for 08-15-11 with Operator reps M. Jacobs, B. Wallace, and A. Birch and Department reps D. Stivanson and D. Catalano.

2000226 2011-08-24 No Violations Noted US Energy Rig#8 Speedstar building curve (7 7/8" hole) at 3061' at time of inspection. Pit lined and freeboard maintained.

Met with Operator rep W. Riggle.

2001428 2011-09-06 No Violations Noted Drilling appeared to have been completed. Two below grade pits located onsite and both have more than the required two feet of lined freeboard. There was no accelerated erosion or sedimentation observed in relation to the access road or well-site.
2013315 2011-10-18 No Violations Noted Multi Production Systems service rig swabbing oil well (post frac) at time of inspection. Pits lined and freeboard maintained.
2038105 2012-01-25 No Violations Noted Drilling had been completed, well appeared to be equipped for production. Above ground tanks located onsite and they appeared to be in sound condition. The diked area around the tanks contained no fluids. A second drill pit had been constructed onsite. The second pit had been properly lined and the contents of the first drill pit had been moved to the second pit. Second pit had more than the required two feet of lined freeboard. Phone conversation with Penneco confirmed that this was so that the first pit may be relined and reused when drilling the McCrady 5H well. All access road and site erosion controls were functioning properly and there was no observed accelerated erosion or sedimenation in relation to either the access road or well-site.
2044963 2012-02-23 No Violations Noted
2069611 2012-05-21 No Violations Noted At the time of inspection the well appears to drilled and equipped for production. The brine tank, pump jack, and well apparatus appear to be in sound condition. No accelerated erosion observed in relation to the access road or well pad area at the time of inspection.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-0 3882.0 274.0 0.0 0.0 7148.03 274.0
2011-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 DRILLING FLUID WASTE 1070.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2012-0 FRACING FLUID WASTE 240.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2012-0 PRODUCED FLUID 1003.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2012-0 DRILLING FLUID WASTE 320.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2011-0 DRILLING FLUID WASTE 240.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2011-0 FRACING FLUID WASTE 2385.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2011-0 PRODUCED FLUID 160.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2011-0 DRILLING FLUID WASTE 4010.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA