X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-24111"

Line 4: Line 4:
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.206825, -80.36715 | width=100% | height=100% }}  
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.206825, -80.36715 | width=100% | height=100% }}  
 
|-
 
|-
| County: [[Washington County, Pennsylvania|Washington]]
+
| County: [[wikipedia:Washington County, Pennsylvania|Washington]]
 
|-
 
|-
| Municipality: [[Hopewell Township, Washington County, Pennsylvania|Hopewell Township]]
+
| Municipality: [[wikipedia:Hopewell Township, Washington County, Pennsylvania|Hopewell Township]]
 
|-
 
|-
| Operator Name: [[RANGE RESOURCES APPALACHIA LLC]]
+
| Operator Name: [[wikipedia:RANGE RESOURCES APPALACHIA LLC|RANGE RESOURCES APPALACHIA LLC]]
 
|-
 
|-
 
| Farm/Lease Name: BEDNARSKI UNIT 9H
 
| Farm/Lease Name: BEDNARSKI UNIT 9H

Revision as of 22:05, 2 May 2014

Well Details

Well ID: 125-24111
Loading map...
County: Washington
Municipality: Hopewell Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Farm/Lease Name: BEDNARSKI UNIT 9H
First Permit Date: 2010-04-16
Last Permit Date: 2010-04-16
Spud Date: 2010-04-23
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 40.206825
Longitude: -80.36715

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1879917 2010-04-23 No Violations Noted Randsom Auger - well spud E& S in place, site and location good
1892983 2010-06-08 No Violations Noted Falcon 1 - Waiting on cement dry time, returns on cement, Site and location good.
1892985 2010-06-08 No Violations Noted Falcon 1 - TD@ 6029, loaded with mud , move to Drugmond pad, site and location good.
2132138 2012-11-13 No Violations Noted

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 167255.0 184.0 1564.0 184.0 0.0 0.0
2012-1 186618.78 182.0 2229.22 182.0 0.0 0.0
2011-2 155047.0 116.0 2066.0 116.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 PRODUCED FLUID 107.4 Bbl INJECTION DISPOSAL WELL 34-121-24086 HUNTER DISPOSAL - TRAVIS UNIT #200405 (SWIW #7) DEXTER CITY OH
2012-2 PRODUCED FLUID 29.23 Bbl INJECTION DISPOSAL WELL 2D0859721 MASON WELL #1 (47-085-09721) - HAUGHT ENERGY CORP ELLENBORO WV
2012-2 PRODUCED FLUID 1719.02 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2010-2 DRILLING FLUID WASTE 59.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR806239 WEAVERTOWN ENVIRONMENTAL GROUP MCDONALD PA
2011-1 PRODUCED FLUID 8670.12 Bbl REUSE OTHER THAN ROAD SPREADING FRAC WATER REUSE PA
2011-2 PRODUCED FLUID 5242.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2012-1 PRODUCED FLUID 2183.56 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING