If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Line 4: | Line 4: | ||
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.557911, -79.701377 | width=100% | height=100% }} | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.557911, -79.701377 | width=100% | height=100% }} | ||
|- | |- | ||
− | | County: [[Westmoreland County, Pennsylvania|Westmoreland]] | + | | County: [[wikipedia:Westmoreland County, Pennsylvania|Westmoreland]] |
|- | |- | ||
− | | Municipality: [[Upper Burrell Township, Westmoreland County, Pennsylvania|Upper Burrell Township]] | + | | Municipality: [[wikipedia:Upper Burrell Township, Westmoreland County, Pennsylvania|Upper Burrell Township]] |
|- | |- | ||
− | | Operator Name: [[PENNECO OIL CO INC]] | + | | Operator Name: [[wikipedia:PENNECO OIL CO INC|PENNECO OIL CO INC]] |
|- | |- | ||
| First Permit Date: 2012-07-05 | | First Permit Date: 2012-07-05 |
Well ID: 129-28790 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.557911,"lon":-79.701377,"icon":""}]} |
County: Westmoreland | |
Municipality: Upper Burrell Township | |
Operator Name: PENNECO OIL CO INC | |
First Permit Date: 2012-07-05 | |
Last Permit Date: 2012-07-05 | |
Spud Date: 2013-01-16 | |
Unconventional: No | |
Horizontal: Yes | |
Violations: None | |
Latitude: 40.557911 | |
Longitude: -79.701377 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2122297 | 2012-12-05 | No Violations Noted | Inspection the result of a spud noticed received by the Department on 12/03/2012. At the time of inspection the spud rig was on site. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | |
2125640 | 2012-12-26 | No Violations Noted | no violoations noted | |
2126139 | 2012-12-26 | No Violations Noted | Waiting on tophole rig at time of inspection. Pit lined and freeboard maintained. Inspection conducted w/WQS S. Steingrabe. | |
2128516 | 2013-01-02 | No Violations Noted | Waiting on rig to resume drilling at time of inspection. Pit lined and freeboard maintained. Inspection conducted w/WQS S. Steingrabe. | |
2129620 | 2013-01-10 | No Violations Noted | At the time of inspection the drill rig was on site and was in the process to drilling the 7H well. At the time of inspection the conductor is set on this well but has not been drilled. The site appeared to be in sound condition. No accelerated erosion or sedimentation observed in relation to well pad or access road during the inspection. The drill pit located on site appeared to be in sound condition with the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site remains stable. | |
2133412 | 2013-01-24 | Pending | Pending | |
2134637 | 2013-01-24 | No Violations Noted | Falcon rig#27 drilling on 9.1 lb/gal mud and beginning to build curve at 2522’ at time of inspection. Pits lined and freeboards maintained. Discussed issues regarding pits w/Operator rep K. McDowell and relayed to WQS S. Steingrabe. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|