X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-24407"

m (Wiki moved page 051-24407 to 42-051-24407)
m
Line 382: Line 382:
 
|-
 
|-
 
|}
 
|}
 +
==References==
 +
{{Reflist}}
 +
 
__NOEDITSECTION__
 
__NOEDITSECTION__

Revision as of 15:41, 11 May 2014

Well Details

Well ID: 051-24407
Loading map...
County: Fayette
Municipality: Dunbar Township
Operator Name: CHEVRON APPALACHIA LLC
Farm/Lease Name: KURUTZ UNIT 11H
First Permit Date: 2010-11-23
Last Permit Date: 2010-11-23
Spud Date: 2011-02-15
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 39.967377
Longitude: -79.679111

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1944022 2011-01-20 No Violations Noted
1960162 2011-03-24 No Violations Noted
1961107 2011-03-28 No Violations Noted HORIZONTAL MARCELLUS, E&S LOOK GOOD CONDITION.CONDUTOR IS SET, WAITING ON RIG.
1967349 2011-04-19 No Violations Noted
1973584 2011-05-17 No Violations Noted
1977445 2011-05-31 No Violations Noted
1984046 2011-05-17 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. (TD) @ 7709' MUDDING UP AND CAPPED. MOVING OVER TO KURUTZ # 10 - H.
1984051 2011-05-14 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION.RAN INTERMEDIATE CASING @ 2772' AND CEMENTING (5/12/2011).DRILLING @ 3108' TODAY.
1984054 2011-05-02 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. BACK TO DRILLING 5/1/2011. TD COAL STRING @ 671'. CEMENTING COAL STRING. TOOK 965 SACKS OF CEMENT TO FILL THE VOID.
1984055 2011-04-27 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. DRILLING @ 469' ,STUCK IN HOLE.
1984057 2011-04-23 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. MOVING RIG OVER TODAY.
1984060 2011-03-31 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SET 24" CONDUCTOR PIPE ( 2 /15/2011).
1984830 2011-06-29 No Violations Noted
2005130 2011-09-19 No Violations Noted HORIZONTAL MARCELLUS,E&S & PITS LOOK IN GOOD CONDITION.RIG MOVING ON SITE (PIONEER DRILLING).
2017365 2011-11-03 No Violations Noted HORIZONTAL MARCELLUS, MOVED TO (KURUTZ 11 - H ), STARTED RUNNING DRILL PIPE IN HOLE ( 11/2/2100 ).
2025516 2011-11-09 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 10,244', RUNNING PROD. CASING AND CEMENTING TONIGHT.
2025889 2011-11-14 No Violations Noted HORIZONTAL MARCELLUS, DRILLING TO (11,986'),RUNNING PROD. CASING AND CEMENTING (11/13/2011).
2047990 2012-02-01 No Violations Noted Hole in the liner with water coming in. Violation becasue pit not impermiable. The violation is recorded on Well #10, permit 051-24406, eFacts#: 2047985.
2048073 2012-02-09 No Violations Noted On February, 8, 2012, while subcontractor was removing / mixing the material in the cuttings pit, a Chevron employee got a reading of 22 ppm hydrogen sulfide (H2S) on his PPM. All work was halted and the site evacuated until the situation was resolved.
On February 9, 2012, I stopped at the site and confirmed that work was halted.  


2048107 2012-02-10 No Violations Noted On February 10, 2012, WQSS Vince Yantko and I visited the Kurutz site to evaluate the situation. The site was still shut down and an environmental contractor was monitoring for hydrogen sulfide. This contractor reported that there were no new detects.

We talked briefly about the clean-up and walked around the open pit. It appeared like more water was coming into pit and Vince expressed concerns that pit water inflow may reach a level where pit contents may reverse flow back out of liner hole.

Later that day, Vince received a tip from a citizen that fly ash was delivered to this well site to be used as a bulking / drying additive for pit preparation for landfill disposal. Chevron was notified by phone & requested to investigate & confirm all additives used.

2048118 2012-02-14 No Violations Noted On February 14, 2012, I stopped at the Kurutz site to check progress. They were still not working on site but the monitoring contractor was still looking for hydrogen sulfide; they still hadn’t any hits.
About 120 barrels of liquid were removed from the pit in the last two days.

Chevron was working on a plan to empty the pit and handle any hydrogen sulfide problems.

2048124 2012-02-17 No Violations Noted On February 15, 2012, Chevron’s contractor again started removing material from the cuttings pit.

On February 17, 2012, I stopped to check the progress. Material was actively being removed at inspection and I got to see them mix the cement with the cuttings. The work was progressing and they had no more hydrogen sulfide hits at that point.

They hoped to have all the work including the liner removed by Wednesday, February 22nd.

Beth Smock from Chevron was on-site and we spoke briefly about the case.

2048195 2012-02-22 No Violations Noted On February 22, 2012, Soil Scientist II, Bill Davis, WQS Rich Thomas and I stopped at the Kurutz site to evaluate & delineate the seasonable high water table at the cuttings pit location. Bill’s investigation revealed that this pit does not comply with requirements under Chapter 78 – specifically 78.56 a 4 iii.

We also found a small coal seam in the pit.

Violations noted agains Well# 10H - 051-24408, eFacts#: 2048173, Enforcement#: 281094

2089970 2012-07-12 No Violations Noted HORIZONTAL MARCELLUS, HALIBURTON WAS RIGGED -UP FOR FRAC JOB PRESSURE TESTING FOR 3 RD TIME WHEN CHICKSAM HAMMER UNION FAILED. DAMAGING IRON ON LOCATION. NO INJURIES ON LOCATION. ALL IRON WILL BE REMOVED AND TESTED (ASAP). NEW IRON IS BEING BROUGHT IN ON LOCATION. THE LINER IS BEING REPLACE AT AREA OF BLOW OUT.NO EVIRNOMENTAL IMPACK ,DUE TO USING OF FRESH WATER TO PRESSURE TEST.
2107506 2012-09-26 No Violations Noted Operator requested restoration extension, Site stable, E&S in place and functioning, Rest of equipment on site to be removed by end on November. Extension approved.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 149647.0 153.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 FRACING FLUID WASTE 8913.3 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0253723 APPALACHIAN WATER SERVICES LLC (RONCO WTP) MASONTOWN PA
2012-2 FRACING FLUID WASTE 2948.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING PA
2012-2 PRODUCED FLUID 1128.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING PA
2011-1 FRACING FLUID WASTE 914.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING PA
2011-2 DRILLING FLUID WASTE 1847.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0253723 APPALACHIAN WATER SERVICES LLC (RONCO WTP) MASONTOWN PA
2012-1 DRILLING FLUID WASTE 7733.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0253723 APPALACHIAN WATER SERVICES LLC (RONCO WTP) MASONTOWN PA

References