If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20236 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.571829,"lon":-75.972157,"icon":""}]} |
County: Wyoming | |
Municipality: Tunkhannock Township | |
Operator Name: CITRUS ENERGY CORP | |
Well Pad ID: 148367 | |
Farm/Lease Name: MCCONNELL UNIT MCCONNELL 1 2H | |
First Permit Date: 2012-01-12 | |
Last Permit Date: 2012-01-12 | |
Spud Date: 2012-01-18 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 41.571829 | |
Longitude: -75.972157 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2036656 | 2012-01-23 | No Violations Noted | Ziegenfuss on site working. Have permit and personal drillers log. Working on mousehole. Do not cement.
This well is not on site sign, sign has 1H. Called Rick Fields, Citrus, to have corrected. Drilled to 240'. dry hole |
|
2042764 | 2012-02-15 | No Violations Noted | Patterson Rig 61, Comp. Man - Joey Catlin, Checked drillers log, at depth of 2050'
Dry hole. 20" @ 60' 13 3/8" @ 756" w/ 585 sx Ty 1, 15.7 ppg, w/ 40 bbls to surf. (2/13/12) 9 5/8" csg in hole, waiting for cementers. Checked cellar - no bubbles. Discussed need to finish berms & patch holes - back behind waste tanks & chem area - Working on berms now. Clean up blue liquid in containment. |
|
2043452 | 2012-02-17 | No Violations Noted |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-1 | DRILL CUTTINGS | 1332.0 | Tons | LANDFILL | THR029 | TUNNELL HILL RECLAMATION LANDFILL | NEWLEXINGTON | OH |