If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 129-28633 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.354863,"lon":-79.306219,"icon":""}]} |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: WPX ENERGY APPALACHIA LLC | |
First Permit Date: 2011-07-20 | |
Last Permit Date: 2011-07-20 | |
Spud Date: None | |
Unconventional: Yes | |
Horizontal: Yes | |
Violations: None | |
Latitude: 40.354863 | |
Longitude: -79.306219 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1983895 | 2011-06-15 | No Violations Noted | Site visit was in response to ARM Inspector Dennis Graham phone call.
A request was made to move a culvert and deviate from the prepared plan. The movement of the culvert was to allow access for the landowner access to a hay storage area. The replacement of the culvert put the structure in what appeared to be a better position to naturally channel water from the site. On-site plans were marked, ok¿ed and initialed. No violations noted at this time. |
|
1985331 | 2011-07-01 | No Violations Noted | Site visit was in response to OG-57 waiver for construction within 100 feet of a wetland.
The pad and access road will encroach on this restriction. Dennis Graham (ARM) and Steve Greer (ARM) were on site during this inspection. It was stressed the BMPs be strengthened on areas that border the wetlands. Waiver is approved. No violations noted |
|
2069256 | 2012-05-17 | No Violations Noted | At the time of inspection the well had not been drilled. No observation of accelerated erosion in relation to the well pad or access road. The E&S plan was onsite and properly installed and maintained. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|