37-027-21548

Well Details

Well ID: 027-21548
Loading map...
County: Centre
Municipality: Snow Shoe Township
Operator Name: ANADARKO E&P CO LP
Farm/Lease Name: COP TRACT 231 A-1002H
First Permit Date: 2009-09-14
Last Permit Date: 2009-09-14
Spud Date: 2010-01-02
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 41.074653
Longitude: -77.80116

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1856413 2010-01-12 De minimus Violations Noted Zigenfuss was on site loading equipment on trucks to transport out.

Conductor is set, and coverd over with a steel plate. While doing inspection, I noted two large tears in the pit liner that are above the 2 ft. minimum freeboard level. Although a violation is not being issued, these tears need to be repaired to prevent the contents of the pit from leaking. I am also requesting that upon completion of the repair, pictures be provided I also noted that the water level in the pit is coming close to the minimum 2 ft. freeboard level on the NNW corner of the pit. Site ID sign was on location. I could not locate the mailbox with the E/S Plan. Met Cole Sterling from Rettew on site and informed him of the tears in the pit liner. Discussed above concerns with with Doug Casteel on 1/14/10 and Jeff Bordelon on 1/15/10.

1860524 2010-01-27 No Violations Noted Conductor is set, and coverd over with a steel plate.

Tears in liner have been covered over with a piece of plastic with rocks placed along the top, but it does not appeard to have been sealed. Some fluid appears to have been removed from the pit. Site ID sign was on location. E/S Plan is located in mail box. Dozer is on location, and rock was being delivered.

1865346 2010-02-24 No Violations Noted -spoke with Phil Jones, company man on-site

-E&S plan on-site, all BMPs in place and working, bare areas are seeded and ulched -well bring air drilled into pit, with change to closed loop once mud drilling starts -pit liner is good -freeboard is god but close to the 2ft requirement. Mr. Jones is having trucks come to haul excess water away -no other issues on-site

1865401 2010-02-24 No Violations Noted Precision Drilling Ring 528 is currently drilling an 8 3/4" hole at 4008'

Well site is in good condition with no visable spills

1869443 2010-03-12 No Violations Noted Precision Rig 528 is currently drilling an 8 3/4" hole at 13,111'.

Well is planned for 7'" casing to 9000' and 4 1/2" liner to 13,165, TMD.

1878941 2010-04-22 No Violations Noted Well is TD @ 13165'
1916602 2010-09-29 No Violations Noted Team Services rig setting 2 3/8" tubing on packer to be set in 4 1/2" liner
1927413 2010-10-15 No Violations Noted
1933651 2010-12-08 No Violations Noted Flow Testing
1941008 2010-11-03 No Violations Noted
1955898 2011-01-31 No Violations Noted
1957054 2011-02-14 No Violations Noted
1965369 2011-03-01 No Violations Noted
1987306 2011-07-13 No Violations Noted
1990963 2011-06-07 No Violations Noted
2011871 2011-08-16 No Violations Noted
2021336 2011-09-22 No Violations Noted
2059975 2012-03-09 No Violations Noted
2090535 2012-06-20 No Violations Noted

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 186013.0 178.0 0.0 0.0 0.0 0.0
2012-1 196513.0 182.0 0.0 0.0 0.0 0.0
2011-2 201669.0 184.0 0.0 0.0 0.0 0.0
2011-1 144927.0 91.0 0.0 0.0 0.0 0.0
2010-2 30334.0 17.0 0.0 0.0 0.0 0.0
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 PRODUCED FLUID 2279.18 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING