If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 111-20274 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.940766,"lon":-79.246437,"icon":""}]} |
County: Somerset | |
Municipality: Middlecreek Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Farm/Lease Name: SAYLOR UNIT 2H | |
First Permit Date: 2009-03-23 | |
Last Permit Date: 2009-03-23 | |
Spud Date: 2009-06-01 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: No | |
Violations: None | |
Latitude: 39.940766 | |
Longitude: -79.246437 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1780703 | 2009-03-27 | No Violations Noted | site not made | |
1803034 | 2009-06-04 | No Violations Noted | Well site has been constructed and is in the pre-drill phase. The well site and access road are showing no signs of erosion and sedimentation. Site ID sign and E/S plan (ESCGP-1) are posted on site. The BMP's that are in place are functioning properly. Pit liner has been embedded properly. Operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are complete. | |
1804178 | 2009-06-10 | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. E/S plan and sign at the entrance of the access road. No mud detected on the township road near the access road. Chief drilling utilizing a UD- 43 rig was at 1014 ft. and setting the 13 5/8 inch piping. Pit aligned with 20 mil plastic with security fencing around pit. According to Tony, borehole has deviated 8.7 % at 1014 ft. from vertical. Chief plans to use another rig to correct the problem. Plan is to drill pilot hole to 8800 ft. and set kicker at 2500 ft where the horizontal drilling will continue. Met with Mr. Saylor and was satisfied with Chief | |
1808480 | 2009-06-24 | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. E/S plan and sign at the entrance of the access road. No mud detected on the township road near the access road. Chief drilling utilizing a UD- 43 rig was at 9,123 ft. Conductor pipe set 20¿ pipe at 78 ft. from grade (ffg). 13 3/8¿ pipe at 1,014 ft from grade used 725 class A sacks and 9 5/8¿ set at 2,004 ft used 700 sacks of class A sacks. Running second geophysical logging event after hole was deepen from 8960 ft to 9123 ft. According to Chief, roughly 500 ft above Marcellus, Chief will fill hole up to that point with cement and set a kicker. Pit aligned with 20 mil plastic and no free board issues. | |
1811747 | 2009-07-08 | No Violations Noted | There are no signs of erosion and sedimentation on the well site or access road. The well site has been constructed and was in the drilling phase at the time of the inspection. Pit is maintaining 2 ft. freeboard. There is a good vegetative filter strip surrounding the site. The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are completed.
Horizontal Marcellus. |
|
1816903 | 2009-07-28 | No Violations Noted | There are no signs of erosion and sedimentation on the well site or access road. The well site has been constructed and was in the drilling phase at the time of the inspection. Pit is maintaining 2 ft. freeboard. There is a good vegetative filter strip surrounding the site. The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are completed. | |
1822554 | 2009-08-14 | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. E/S plan and sign at the entrance of the access road. No mud detected on the township road near the access road. Chief drilling utilizing a UD- 43 rig has met the total depth. Pit aligned with 20 mil plastic and no free board issues. Chief in the process of breaking down. | |
1828939 | 2009-09-09 | No Violations Noted | There are no signs of erosion and sedimentation on the well site or access road. The well has been drilled and not in production at the time of the inspection. Pit is maintaining 2 ft. freeboard. Decreasing levels of water staining was observed on the sides of the pit liner. There is a good vegetative filter strip surrounding the site. The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are completed. | |
1843009 | 2009-11-03 | No Violations Noted | drilling complete, talked to landowner about complaint- WQ related | |
1899133 | 2010-07-19 | No Violations Noted | At the time of inspection, well site was properly signed. Previous attempts to restore were evident, but site was actively being reseeded to ensure uniform vegetative cover in areas that did not achieve 70% growth. Pits have been removed and area restored. Rock pad. Access road was in stable condition. No accelerated erosion or sedimentation issues were observed in relation to access road or site. It is recommended that operator continue to maintain all bmps until final (uniform) restoration measures are achieved. Sub- contracting rep (Keystone) Josh was onsite during inspection. A follow up inspection will be conduction to ensure reseeded areas sustain 70% vegetative growth and site is permanently restored/stabilized. | |
2004335 | 2011-09-13 | No Violations Noted | During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan w/ PPC plan, and ESCGP-1 onsite. Site gated and locked. Access road entrance and roadway stable. Well drilled not yet in production; recently granted inactive status. Well head lined with felt and plastic-noted red staining on liner below well head-operator plans to ensure structural integrity of well head is not compromised¿may be result of rust. No pits located onsite, although one frac tank and two brine tanks on pad- both secured by secondary containment. Appears rainwater has begun to accumulate in containment unit due to recent heavy rains; department is recommending operator properly dispose of water from unit. Department recommends operator remove secondary containment liner (placed on pad) previously used during frac operation. | |
2009461 | 2011-10-05 | No Violations Noted | well was not in production. pipeline has been run to site and production equipment has been installed. | |
1952962 | 2011-02-23 | No Violations Noted | At the time of inspection, well site id and ES plan present, along with 24hr security. Well drilling and preparations for frac operation underway. Access rd and pad snow covered. No accelerated erosion or sedimentation issues noted. Bmp¿s installed and functioning. Pad is felt lined. No pits onsite, operator utilizing frac tanks. Tanks appear structurally sound. No IW issues noted. Pipeline from Bowers West impoundment utilized for frac operator currently disconnected due to pipeline break that occurred on 2/20/11, (see incident follow up inspection # 1952923). No visible evidence that previous line break adversely impacted this site, at the present time. No violations noted onsite. Site had previously been reseeded and mulched, but operator should continue to monitor site/access to prevent the potential for accelerated erosion or sedimentation concerns due to recent thaws and increased traffic. | |
1965630 | 2011-04-14 | No Violations Noted | At the time of inspection, site id sign, ES plan. Site gated with 24hr security guard. Access road stable. Well recently fraced, containment pad (felt /plastic lining placed below well location). No pits onsite, three frac tanks that appear to be sound, as well as 8 covered containment boxes. Temporary bmp¿s in place and functioning noted that previously disturbed areas have been reseeded and mulched with approximately 70% vegetative cover. No accelerated erosion or sedimentation issues observed on site or access road, although operator should continue to closely monitor all bmp¿s until final permanent site restoration is achieved. No IW issues noted. | |
1986073 | 2011-06-14 | No Violations Noted | review of inactive status. approved | |
2067342 | 2012-05-04 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production
|
|
2078972 | 2012-06-26 | No Violations Noted | Routine inspection. No issues noted. | |
2093094 | 2012-06-21 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production
|
|
2128485 | 2012-12-17 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | FRACING FLUID WASTE | 115.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | PA | ||
2010-2 | PRODUCED FLUID | 1240.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAR000519462 | ADVANCED WASTE SERVICES OF PA (NEW CASTLE) | NEW CASTLE | PA |
2011-1 | FRACING FLUID WASTE | 820.0 | Bbl | LANDFILL | NY STATE #32S11 | ALLIED WASTE SYSTEMS | NIAGARA FALLS | NY |
2011-1 | FRACING FLUID WASTE | 6360.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PBR | RES | PITTSBURGH | PA |
2011-1 | FRACING FLUID WASTE | 2280.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |