X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-23164

Well Details

Well ID: 37-059-23164
Loading map...
Operator Name: PENNECO OIL CO INC
First Permit Date: 2002-03-22
Last Permit Date: 2003-08-18
Spud Date: 1800-01-01
Unconventional: No
Horizontal: No
Violations: None
Latitude: 39.883083
Longitude: -80.362279

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 715.0 365.0 0.0 0.0 0.0 0.0
2012-0 865.0 335.0 0.0 0.0 0.0 0.0
2011-0 1063.0 365.0 0.0 0.0 0.0 0.0
2010-0 1176.0 365.0 0.0 0.0 0.0 0.0
2009-0 629.0 365.0 0.0 0.0 0.0 0.0
2008-0 673.0 365.0 0.0 0.0 0.0 0.0
2007-0 746.0 365.0 0.0 0.0 0.0 0.0
2006-0 800.0 365.0 0.0 0.0 0.0 0.0
2005-0 878.0 365.0 0.0 0.0 0.0 0.0
2004-0 571.0 244.0 0.0 0.0 0.0 0.0
2003-0 311.0 335.0 0.0 0.0 0.0 0.0
2002-0 216.0 122.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2004-0 BRINE 880.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT ALLEGHENY VALLEY JT SEW AUTH
2004-0 BRINE 880.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT CHARLEROI BORO STP
2004-0 BRINE 880.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2008-0 BRINE 30.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1110889 2002-03-26 No Violations Noted Bench is cut & staked. Access is rocked. ID & plan are at hand. Flash flood conditions prevailing. Several trees toppled into pits, pits full of rainwater. Diversion ditches above bench near their limits. Overall rocking of access & bench holding well.
1118414 2002-04-26 No Violations Noted waiting cement time
1121833 2002-04-30 No Violations Noted running pipe
1164822 2002-08-30 No Violations Noted Gated loc., access is well graded, ditched & drained, bench is backfilled, holding, revegetation is uniform, well is equipped, tank loc. near access bottom.

References