{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.455921,"lon":-79.163882,"icon":""}]} |
Operator Name: KRIEBEL MINERALS INC | |
First Permit Date: 2009-07-15 | |
Last Permit Date: 2009-07-15 | |
Spud Date: 2009-11-11 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.455921 | |
Longitude: -79.163882 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 4717.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 5778.0 | 333.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 10966.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 10706.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 25.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | PRODUCED FLUID | 20.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2012-0 | PRODUCED FLUID | 25.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | PRODUCED FLUID | 20.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1845229 | 2009-11-19 | No Violations Noted | According to records, permit granted on 7/15/09. Well sign and E&S plan located at the entrance of access road. Site was completed drilling. Pit aligned with plastic and no freeboard issues. Filter fence set on down gradient side of well pad. Site was in preparation of setting production equipment. At the time of inspection, no E&S or IW issues at the site. | |
1845438 | 2009-11-12 | No Violations Noted | At the time of inspection, the well was actively being drilled. The well site was properly signed with E&S plan available for review. Access road entrance was in good condition with 50ft of rock. Access road was in stable condition at that time of inspection, but it is recommended that in order to prevent potential erosion problems a rock lined road side ditch be installed to direct runoff flow down the steep gradient. Also noted that a diversion ditch surrounding the pit was not rocked lined nor did it lead to a sediment trap, it is recommended these measures be installed. Fabric filter fence along with a grub/brush line were being utilized and functioning as E&S controls surrounding site. Pit sustained a two ft freeboard and appeared sound in construction. | |
1967684 | 2011-04-22 | No Violations Noted | Drilling complete. Well equipped and producing. Tag and tank ok. Site vegetated started.No open pits. | |
2041241 | 2012-02-08 | No Violations Noted | Site visit was due to spud notification.
Well was drilled and appeared to be in production. Access road to well was rocked and stable. Nut at elbow above well head was visible and audibly leaking. Informed Mark Hopkins of this via phone. No violations noted at this time. |
|
2041498 | 2012-02-07 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was in production.
|