X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-22894

Well Details

Well ID: 37-051-22894
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 2005-08-22
Last Permit Date: 2005-08-22
Spud Date: 2005-12-20
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.043357
Longitude: -79.723257

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 4074.0 334.0 0.0 0.0 0.0 0.0
2012-0 4305.0 335.0 0.0 0.0 0.0 0.0
2011-0 4981.0 334.0 0.0 0.0 0.0 0.0
2010-0 6040.0 365.0 0.0 0.0 0.0 0.0
2009-0 7380.0 334.0 0.0 0.0 0.0 0.0
2008-0 7957.0 366.0 0.0 0.0 0.0 0.0
2007-0 8659.0 365.0 0.0 0.0 0.0 0.0
2006-0 7043.0 334.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2006-0 FRACKING FLUID 1080.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2009-0 BRINE 35.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2010-0 PRODUCED FLUID 70.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2011-0 PRODUCED FLUID 70.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1504449 2006-01-03 No Violations Noted Tight site. Logs trimmed & piled, end-of-driveway behind home location. Three pits here lined, 2 rain-filled allthough pumped down initially. Haybales weighting down frac sump liner. Jockeying in driveway of wire line services, tank trucks, etc.... Rutting due to much activity in rainy weather.
1515890 2006-02-21 No Violations Noted Well is drilled and equipped to line. This sensitive location near springs and residences needs timely restoration. Pit is closed, but site is raw and vulnerable to run-off and sedimentation carry after a rain. Stoned access is underlain in plastic fulfilling a definite need at this stage, so bench work can proceed with restoration.

References