X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-23310

Well Details

Well ID: 37-059-23310
Loading map...
Operator Name: PENNECO OIL CO INC
First Permit Date: 2003-06-06
Last Permit Date: 2003-06-06
Spud Date: 2003-10-09
Unconventional: No
Horizontal: No
Violations: None
Latitude: 39.850944
Longitude: -79.99185

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 1765.0 365.0 0.0 0.0 0.0 0.0
2012-0 2023.0 366.0 0.0 0.0 0.0 0.0
2011-0 2235.0 365.0 0.0 0.0 0.0 0.0
2010-0 2230.0 335.0 0.0 0.0 0.0 0.0
2009-0 3269.0 365.0 0.0 0.0 0.0 0.0
2008-0 1867.0 365.0 0.0 0.0 29.0 30.0
2007-0 2301.0 365.0 0.0 0.0 0.0 0.0
2006-0 4423.0 365.0 0.0 0.0 0.0 0.0
2005-0 4895.0 365.0 0.0 0.0 37.73 365.0
2004-0 4528.0 275.0 0.0 0.0 0.0 0.0
2003-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2003-0 DRILLING 160.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2003-0 FRACKING FLUID 1760.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2004-0 BRINE 320.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2005-0 BRINE 80.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2008-0 BRINE 45.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2009-0 BRINE 10.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1260650 2003-08-11 No Violations Noted Freshly excavated access here, crowned w/stone, ditched & culverted. Pits are excavated at bench, plan in tube, logs trimmed & astacked, topsoil stockpiled, bench staked for the rig.
1270330 2003-09-16 No Violations Noted Bench area clear of trees, access cut past loc. Stumps & brush pushed downgrade as a buffer for sed. control. Dozer presently working down the bench area preparatory to pit excavation and backhoe work there. Access is stoned, ditched, crowned. Needs ID sign, plan cannister is there.
1280079 2003-10-22 No Violations Noted Wellhead is established, bench cut, pits lined & containing cuttings. Access & bench await development. ID/plan at entrance, gravel here to road. Topsoil is stockpiled at bench.
1321151 2003-10-15 No Violations Noted drilling ahead
1381671 2004-09-30 No Violations Noted Tag, tank, e&s ok. Producing gas. Vegetation started.

References