{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.202169,"lon":-79.881772,"icon":""}]} |
Operator Name: KRIEBEL MINERALS INC | |
First Permit Date: 2010-04-14 | |
Last Permit Date: 2010-04-14 | |
Spud Date: 2010-10-11 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.202169 | |
Longitude: -79.881772 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 4966.0 | 334.0 | 0.0 | 0.0 | 40.74 | 334.0 |
2012-0 | 6378.0 | 335.0 | 0.0 | 0.0 | 65.0 | 335.0 |
2011-0 | 9111.0 | 334.0 | 0.0 | 0.0 | 62.67 | 365.0 |
2010-0 | 1287.0 | 61.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 5.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2010-0 | FRACING FLUID WASTE | 230.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2010-0 | DRILLING FLUID WASTE | 330.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2010-0 | FRACING FLUID WASTE | 940.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2012-0 | PRODUCED FLUID | 5.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1927788 | 2010-10-19 | No Violations Noted | DRILLING COMPLETE. RIG REMOVED FROM SITE. PIT LEVEL, E&S, AND ACCESS, OK. SITE IS CLEAN AND DOZED. | |
1927792 | 2010-10-13 | No Violations Noted | USE RIG 7 DOWN FOR 9 5/8" CEMENT TIME. PIT OK. CREW SEEDING AND MULCHING SITE AND ACCESS. | |
1929381 | 2010-10-19 | No Violations Noted | On October 19th, 2010 I visited this site as a routine inspection. Drilling was recently completed and equipment was moving offsite. The pits was still in place, no tears were observed and it displayed adequate freeboard. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | |
1929461 | 2010-10-22 | No Violations Noted | On October 22nd, 2010 I visited this site as a routine inspection. Drilling was recently completed. The pits were being filled with freswater in preparation for the frac. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | |
1931255 | 2010-11-17 | No Violations Noted | On November 17th, 2010 I visited this site as a routine inspection. Drilling was recently completed. The pit had been closed The access road was in good condition. A Site ID and E&S plan were posted on site. Crews were on site restoring the site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | |
1933567 | 2010-12-10 | No Violations Noted | On December 10th, 2010 I visited this site as a routine inspection. Drilling was completed. The pit had been closed The well was in production. The site was graded back to original contour. The access road had sustained some damage and needed repair in one location. The operator was contacted concerning the matter. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | |
1934065 | 2010-11-24 | No Violations Noted | WELL IS COMPLETE AND PRODUCING.SITE IS GRADED, ACCESS IS STONED, AND E&S, OK. | |
1958433 | 2011-02-09 | No Violations Noted | On February 9th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The pit had been closed The site was graded back to original contour. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. A portion of the silt fence was down in one section on the lower slope. The operator was contacted. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and ater each runoff event until the site is restored and 70% vegetative cover is achieved. | |
1958687 | 2011-02-17 | No Violations Noted | ||
1958765 | 2011-02-17 | No Violations Noted | On February 17th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The pit had been closed The site was graded back to original contour. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. The section of silt fence that was down had been replaced. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and ater each runoff event until the site is restored and 70% vegetative cover is achieved. | |
1992063 | 2011-07-08 | No Violations Noted | On July 8th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The site was restored and well vegetated. The access road was in good condition. A well tag was present. One tank was surrounded by a dike. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. |