X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28370

Well Details

Well ID: 37-129-28370
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 2010-06-25
Last Permit Date: 2010-06-25
Spud Date: 2010-08-31
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.168675
Longitude: -79.607636

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 4297.0 334.0 0.0 0.0 0.0 0.0
2012-0 5867.0 335.0 0.0 0.0 0.0 0.0
2011-0 13011.0 334.0 0.0 0.0 0.0 0.0
2010-0 2331.0 92.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 DRILLING FLUID WASTE 330.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2010-0 FRACING FLUID WASTE 690.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1888100 2010-05-25 No Violations Noted Request for waiver of distance requirement- well site is proposed to be constructed within 100 ft of Buffalo run. Well site is staked and is not constructed. Proposed E&S plan should protect stream from adverse impact during site/well development if properly implemented and maintained.. Operator proposes to land farm drill cuttings at this well location. Application area can not be within 100 feet of stream and slopes cannot exceed 25% per Title 25 Chapter 78.53.
1911790 2010-09-09 No Violations Noted Site inspection was conducted during drilling. Water level in drill pit just at minimum freeboard and should be monitored closely to avoid and discharge/release (operator representative Mike Cioffi was notified by phone). Perimeter E&S BMP¿s in place and functioning adequately. Access road is maintained adequately with no runoff noted. *Site must be restored within 9 months of drill completion.

References