X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-23342

Well Details

Well ID: 37-059-23342
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 2003-09-17
Last Permit Date: 2005-09-14
Spud Date: 2005-12-12
Unconventional: No
Horizontal: No
Violations: None
Latitude: 39.801667
Longitude: -80.183717

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 537.0 324.0 0.0 0.0 3.66 324.0
2012-0 650.0 298.0 0.0 0.0 2.16 298.0
2011-0 1531.0 323.0 0.0 0.0 4.46 365.0
2010-0 2300.0 356.0 0.0 0.0 9.97 356.0
2009-0 2049.0 294.0 0.0 0.0 9.0 294.0
2008-0 3324.0 325.0 0.0 0.0 5.0 325.0
2007-0 4139.0 365.0 0.0 0.0 0.0 0.0
2006-0 4169.0 296.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 10.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2012-0 PRODUCED FLUID 10.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1599672 2005-12-15 No Violations Noted PIT & E&S OK.
1511938 2006-02-02 No Violations Noted Well is drilled & equipped. Much upgrade stabilization here due to hillside wetness. Lightly mulched thereafter. Sed. fence is set downgrade. Bench graded well back to counter some inevitable creep expected and to prevent any possibility of it extending to the wellhead area. The site awaits drying-out before starting complete restoration.
1520523 2006-03-10 No Violations Noted Access at bridge w/haybales helps to stay sediment from run-off to creek. Above was much evidence of stabilization work consisting of buried protected conduits to drain upslope areas above the bench to minimize creep and mudslides around wellhead.

References