Well ID: 37-063-36485 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.545276,"lon":-79.403381,"icon":""}]} |
Operator Name: ACTAGON CORP | |
First Permit Date: 2009-04-09 | |
Last Permit Date: 2009-04-09 | |
Spud Date: 2009-04-21 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.545276 | |
Longitude: -79.403381 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 1015.0 | 335.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 4448.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 6545.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 153.0 | 30.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2009-0 | FRACING FLUID WASTE | 667.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1796676 | 2009-05-06 | Pending | Site ID sign in place. E&S plan on site. Site has been created, well has not been drilled.
Silt fence installed along down-slope side of site adequately maintained. Site is stabilized with rock. No signs of accelerated erosion on site. Access road ok. Pit has been excavated. Plastic liner not yet installed.
roads, other connected wells included in this project, etc.. Follow-up inspections will be conducted to determine the amount of total disturbance, and to determine if the sites are in violation. Culvert installed on access road requires rip-rap at the outlet to minimize erosion. Please address this concern and contact this offiice upon completion. |
|
1798073 | 2009-05-14 | No Violations Noted | Inspection conducted with Oil & Gas Inspectors Rick Hoover and Steve Lencer.
Site ID sign in place. E&S plan on site. Well being drilled at time of inspection. Lined pit appears sound and had adequate freeboard. Silt fence installed along down-slope side of site adequately maintained. Site is stabilized with rock. No signs of accelerated erosion on site. Access road ok.
report/NOV.
completion. |
|
1800573 | 2009-05-14 | No Violations Noted | drilling - 4.5in. casing being run/E&S ok/pit&ID ok | |
1820584 | 2009-08-14 | No Violations Noted | Well is equipped for production. Well tag in place. Tank sound.
Access road is stabilized with rock. No signs of accelerated erosion on access road. Rock installed at culvert outlet. Site is stabilized with adequate vegetation. No signs of accelerated erosion on site. Associated pipelines and other earth disturbance is restored and stabilized with adequate vegetation. Final stabilization achieved. Site restored. Violation for failure to obtain an ESCGP-1 permit for this project which was addressed through the Auen # 1 (063-36487) inspection report/NOV dated 5/18/09 is in compliance with the above mentioned restoration and the submission of the ESCGP-1 permit application. With this site being restored and final stabilization complete, the silt fence that was installed on the down-slope side of the site must be removed. Spoke to operator representative about this concern. Please contact this office upon completion. |