If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36865 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.442583,"lon":-79.151916,"icon":""}]} |
Operator Name: KRIEBEL MINERALS INC | |
First Permit Date: 2010-05-26 | |
Last Permit Date: 2010-05-26 | |
Spud Date: 2010-08-18 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.442583 | |
Longitude: -79.151916 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 6852.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 8821.0 | 333.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 14104.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 3697.0 | 122.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 95.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2010-0 | FRACING FLUID WASTE | 635.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2010-0 | FRACING FLUID WASTE | 880.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2012-0 | PRODUCED FLUID | 95.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1914067 | 2010-09-17 | No Violations Noted | At the time of inspection, well site properly signed with ES plan available for review. Well drilled and in production. Brine tank installed onsite surrounded by rocked dike. Site seeded and mulched. Filter fence with bush grub line installed below gradient of well head. Access road stable No accelerated erosion and sedimentation issues were noted during this inspection. Recommend operator continue to monitor and maintain all bmps until final restoration activities are complete and site is permanently stabilized. Reccomend that operator remove tires placed along brush grub line to ensure a potential pollution event does not occur. | |
1954076 | 2011-03-02 | No Violations Noted | Drilling complete. Well equipped. Tank and e&s ok. | |
2131679 | 2012-12-11 | No Violations Noted | At time of inspection, well in production. Well tag present. Access road in good condition. Site permanently stabilized with >70% required vegetative cover. No E&S issues noted in relation to well site.
Brine tank located in containment dike, both appeared sound. Department recommends that Operator continue to monitor and maintain site and access road as needed. Unable to locate restoration report for this site. On 2/8/13, Operator agreed to re-submit reports. UPDATE: 3/11/2013 Restoration report received by Department.
|