37-063-36961

Well Details

Well ID: 37-063-36961
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 2010-10-25
Last Permit Date: 2010-10-25
Spud Date: 2010-11-08
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.443722
Longitude: -79.144555

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 3386.0 334.0 0.0 0.0 0.0 0.0
2012-0 4410.0 333.0 0.0 0.0 0.0 0.0
2011-0 14036.0 334.0 0.0 0.0 0.0 0.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 95.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2012-0 PRODUCED FLUID 110.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2010-0 DRILLING FLUID WASTE 2900.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2010-0 FRACING FLUID WASTE 800.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2010-0 DRILLING FLUID WASTE 1340.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2012-0 PRODUCED FLUID 95.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2012-0 PRODUCED FLUID 110.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1928766 2010-11-18 No Violations Noted At the time of this inspection, well drilled not yet equipped for production. Site properly signed with ES plan. Appears all bmps are installed and functioning according to plan. Access road stable. Recommend operator rock culvert outlets and temporarily seed/mulch prior to snowfall to help resist possible potential for erosion and ensure stabilization of disturbed areas. Two above grade pits located onsite. Left Mike Cioffi a message (11-18-10 @1230pm) to ensure structural integrity of pit liners are maintained, as well as freeboard, a section of liner appeared to come loose from wind. Freeboard ok. No accelerated erosion or sedimentation.
1929836 2010-11-23 No Violations Noted Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Both pits covered with 20 mil plastic and security fence. No freeboard issue. Falcon was contracted. Stratigraphy consisted of coal, ss and sh. Well completed and anticipated depth was 4970 ft. Well was hydro fractured and No signs of gas leak from around well and equipment.


1965927 2011-04-13 No Violations Noted At the time of inspection, site Id, ES plan and well tag present. Well drilled and in production. Brine tank surrounded by dike appears stable. Site has not yet been re-graded or seeded/mulched, until final permanent restoration is achieved operator should continue to monitor all temporary bmp¿s. Access road stable, although dept recommends that culvert outlets are rocked to reduce direct runoff into field to prevent a possible pollution event. No accelerated erosion or sedimentation issues were noted in relation to site or access road, although it is recommend that operator stabilize site to reduce the risk for a possible pollution event.
2038295 2012-01-30 No Violations Noted During this inspection, well drilled and in production. Well tag present.

One brine tank onsite surrounded by earthen rock lined dike. Site appears re-graded and seeded with observed growth, but do to the presence of snow a follow up will be conducted in spring to ensure <70% uniform vegetative cover is maintained. Pad and access road adequately rocked. No accelerated erosion apparent on access road or well site. No violations noted at the time of this inspection.

References