Well ID: 42-125-24366 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.077516,"lon":-80.184041,"icon":""}]} |
County: Washington | |
Municipality: Amwell Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 147922 | |
Farm/Lease Name: CAPTAIN PLANET 1H | |
First Permit Date: 2011-03-08 | |
Last Permit Date: 2011-03-08 | |
Spud Date: 2011-04-02 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: 7 | |
Latitude: 40.077516 | |
Longitude: -80.184041 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1970206 | 2011-04-14 | Outstanding Violations - No Viols Req'd | Good progress made. Still work to be done. | |
1970277 | 2011-05-03 | Outstanding Violations - No Viols Req'd | On May 3, 2011, I stopped at the Captain Planet site in Amwell Township to check on the progress toward addressing the violations previously found. I met primarily with Robert Rikeman of Rice Energy and Jack Cooper of Geological Engineering Services, a Rice contractor.
Rice has finished the vertical drilling bore and is waiting to start the horizontal drilling. The site is much better and good vegetative growth. The replacement/repair of the BMPs goes on. The area on the west of the pad is still bothersome because the topsoil stored there is so wet it causing problems on both sides of the access road. They asked if they could give some of the excess back to the landowner. I talked it over with Vince Yantko and as long as they have a adequate supply they can give it away. The continuing wet weather is still causing problems but the site is mostly seeded and they are hoping to finish the rest soon I took several photographs and left.. |
|
1976386 | 2011-04-20 | No Violations Noted | Phoenix 7 - TD @ 220, waiting on cement dry time, cement fell back 40' back side grouted with pour string, site and location good, closed loop. | |
1976400 | 2011-04-28 | No Violations Noted | Phoenix 7 - TD @ 2823, drilling 8 1/2 " vertical hole ahead, returns on cement, site and location good, closed loop. | |
1983615 | 2011-05-12 | No Violations Noted | HWD 7- TD @ 5483, tripping in hole after bit change, site and location good, closed loop | |
1992586 | 2011-03-21 | Violation(s) Noted | Five violations recorded. Inspection in response to Complaint # 277691. | 616800 |
1992586 | 2011-03-21 | Violation(s) Noted | Five violations recorded. Inspection in response to Complaint # 277691. | 616801 |
1992586 | 2011-03-21 | Violation(s) Noted | Five violations recorded. Inspection in response to Complaint # 277691. | 616802 |
1992586 | 2011-03-21 | Violation(s) Noted | Five violations recorded. Inspection in response to Complaint # 277691. | 616803 |
1992724 | 2011-05-18 | Outstanding Violations - No Viols Req'd | Horizontal drilling was continuing. Some of the topsoil was moved but it was still quite wet. Rice had done some road work. Violations described March 21, 2011 still remain. | |
1992729 | 2011-06-09 | Outstanding Violations - No Viols Req'd | The entrance to the pad was rocked and the overall condition of the pad was much better with some of the reseeding taking off. Work still needs to be done on the sediment trap. | |
1992738 | 2011-06-30 | Outstanding Violations - No Viols Req'd | Checked the clean-up progress. The site is greening up, the E&S plan is on-site but does need updating. The well is within 10 feet of the coordinates Rice gave. Some of the sediment controls need maintenance and the sediment trap is still unresolved. | |
1992746 | 2011-07-29 | No Violations Noted | The E&S controls are, in all, very good. Most of the slopes have 90% vegetative cover and the fences and socks are in decent repair. Rice enlarged the sediment trap and cut a new access road to it to maintain the trap. The road runs along the south side of the pad and will do double duty as a stormwater channel. Much of this work has only been done in the last couple of weeks and the newly cut slopes are not yet vegetated. Additionally, Rice added rock to the sediment traps spillway. Although the newly expanded trap and access road are still bare, they should green-up shortly.
Additionally, the site¿s E&S plan needs to be updated and initialed. Because all the construction is completed and most of the site is now vegetated, I am closing out the Captain Planet¿s violation as of August 3, 2011. A final Consent and Agreement will also include the Hulk site. |
|
1995661 | 2011-05-24 | Violation(s) Noted | 617751 | |
1995661 | 2011-05-24 | Violation(s) Noted | 617751 | |
1995661 | 2011-05-24 | Violation(s) Noted | 617753 | |
1995661 | 2011-05-24 | Violation(s) Noted | 617753 | |
2008274 | 2011-09-30 | Violation(s) Noted | Responded to company-reported oil spill. Barel of used oil knocked over. Good response after the fact. | 621535 |
2016398 | 2011-09-12 | No Violations Noted | viols corrected from inspection 1995661, enforcement 273754 for unit 1H | |
2080126 | 2012-06-26 | No Violations Noted |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 823158.0 | 178.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 117233.0 | 182.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 468329.0 | 70.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 5922.5 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2011-1 | BASIC SEDIMENT | 1136.2 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAR000519462 | ADVANCED WASTE SERVICES OF PA (NEW CASTLE) | NEW CASTLE | PA |
2011-1 | DRILLING FLUID WASTE | 4150.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAR000519462 | ADVANCED WASTE SERVICES OF PA (NEW CASTLE) | NEW CASTLE | PA |
2011-1 | FRACING FLUID WASTE | 13918.8 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAR000519462 | ADVANCED WASTE SERVICES OF PA (NEW CASTLE) | NEW CASTLE | PA |
2011-1 | DRILLING FLUID WASTE | 340.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2011-1 | DRILL CUTTINGS | 1002.29 | Tons | LANDFILL | 100172 | WASTE MANAGEMENT, INC - ARDEN LANDFILL, INC. | WASHINGTON | PA |
2011-2 | PRODUCED FLUID | 1248.0 | Bbl | INJECTION DISPOSAL WELL | 34-42-133-24096 | GROSELLE #2 - SALTYS DISPOSAL WELLS LP | GARRETTSVILLE | OH |
2011-2 | PRODUCED FLUID | 1687.0 | Bbl | INJECTION DISPOSAL WELL | 34-42-133-21076 | MYERS #1 UNIT (SALTY'S DISPOSAL) | ATWATER | OH |
2011-2 | PRODUCED FLUID | 170.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2012-1 | PRODUCED FLUID | 690.0 | Bbl | INJECTION DISPOSAL WELL | 34-42-133-24096 | GROSELLE #2 - SALTYS DISPOSAL WELLS LP | GARRETTSVILLE | OH |
2012-1 | PRODUCED FLUID | 2447.0 | Bbl | INJECTION DISPOSAL WELL | 34-42-133-21076 | MYERS #1 UNIT (SALTY'S DISPOSAL) | ATWATER | OH |