Well Details

Well ID: 37-063-37221
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 2011-10-28
Last Permit Date: 2011-10-28
Spud Date: 2012-01-30
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.458561
Longitude: -79.14375

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 10635.0 334.0 0.0 0.0 0.0 0.0
2012-0 6099.0 273.0 0.0 0.0 0.0 0.0
2011-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 DRILLING FLUID WASTE 220.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2012-0 FRACING FLUID WASTE 1820.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2012-0 DRILLING FLUID WASTE 220.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2012-0 FRACING FLUID WASTE 1820.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2012774 2011-10-19 No Violations Noted OG-57 WAIVER INSPECTION. WAIVER APPROVED WITH CONDITIONS.
2029321 2011-12-22 No Violations Noted Well sign was present. E&S controls were implemented. At the time of inspection, no E&S concerns were present. Pit was dug.


2040827 2012-02-01 No Violations Noted Kriebel had contracted U.S. Energy. E&S controls and well sign were present. No freeboard or E&S issues were present at the time of inspection. Conductor pipe was installed to 60 feet (13 3/8¿ pipe) and sanded in. Mine pipe was installed to 242 feet (9 5/8¿ pipe). Mine pipe was cemented with 145 sks of Class A and cemented to surface. Cement basket was set at 163¿ with mine void located at 198¿ to 202¿. Water was encountered at 125¿and 295 feet. Coal bearing zones were noted at 235 ft. and 290 ft. U.S. Energy was currently at 1,200 feet and anticipated depth is 5,000 feet.
2040836 2012-02-02 No Violations Noted Kriebel had contracted U.S. Energy. E&S controls and well sign were present. No freeboard or E&S issues were present at the time of inspection. Surface pipe (7¿) was set at 1,862 feet and cemented with 335 sks Type I with 12 bbls return. Plug was down at 4:55 am on 2/2/12. U.S. Energy was allowing the 8 hour cement set up time.


2041205 2012-01-30 No Violations Noted Site visit was due to spud notification.

No rig was on site at time of inspecton. Silt sock was installed. No E&S issues noticed at this time. Site is part of a waiver for wetlands and also PNDI hit. Site will be revisited in the future (after snow) to verify compliance with the og-57 waiver. No violations noted at this time.

2041496 2012-02-07 No Violations Noted Kriebel had contracted U.S. Energy. E&S controls and well sign were present. No freeboard or E&S issues were present at the time of inspection. Total depth of well was drilled to 5,050 feet. U.S. Energy was setting the production pipe (4 ½¿).


2041533 2012-02-09 No Violations Noted Kriebel had contracted U.S. Energy. E&S controls and well sign were present. No freeboard or E&S issues were present at the time of inspection. Well drilling was completed. U.S. Energy was removed from the site.


2042697 2012-02-14 No Violations Noted Kriebel had contracted Superior to frac well. E&S controls and well sign were present. No freeboard or E&S issues were present at the time of inspection. Frac was at last stage.